18.A customer requires the use of data encryption to ensure data is not accessible when a drive is removed from the primary storage platform. However, there is also a requirement to use deduplication and compression against all workloads in order to conserve space
Which solution meets the customer requirements?

A.   Data-in-transit encryption

B.   OS-level encryption

C.   Encrypted backups

D.   Array-based encryption

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-fa88-c0f9-29e3bb5dbe01.html
查看题目
33.During a requirements gathering workshop, the customer provides the following requirement that is pertinent to the design of a new vSphere environment:
The Maximum Tolerable Downtime ( ) for all Tier 1 applications is one hour.
Which requirement classification is being gathered for the design documentation?

A.   Manageability

B.   Performance

C.   Availability

D.   Recoverability

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-48a8-c0f9-29e3bb5dbe00.html
查看题目
81.An architect is designing a vSphere environment for a customer and learns that the customer has:

A.   Use Storage DRS.

B.   Use VMDK anti-affinity rules.

C.   Use multiple datastores for heartbeat.

D.   Use a minimum of three storage arrays.

E.   Use VM to host DRS rules.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-2750-c0f9-29e3bb5dbe00.html
查看题目
54.Following a recent acquisition, the architect learns that both companies use vSphere on-premise and will need to combine the data centers into one. The acquired company's licenses will not be renewed for costsavings related to the acquisition. All consumed vSphere licenses must have active support to support lineof-business operations. The merged environment must maintain 25% spare capacity. The architect has asmall budget remaining unallocated for hardwarE、
The architect has calculated that the current vSphere environment can absorb the acquired company's virtual machines but the cluster will run at 90% memory utilization and at 50% CPU utilization.
Which design decision can the architect make to incorporate the new company's virtual machines into the combined vSphere environment?

A.   Migrate the acquired company's virtual machines into the vSphere environment as it will currently fit.

B.   Use the current budget to add memory to the cluster to increase each ESXi host's capacity and add the new virtual machines.

C.   Purchase extra hosts to add to the cluster in anticipation of adding the acquired company's virtual machines.

D.   Purchase new licenses for some of the acquired company's ESXi hosts and add them to the cluster to hold the acquired company's virtual machines.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-9ab0-c0f9-29e3bb5dbe00.html
查看题目
22.An architect is tasked with reviewing the design of a VMware software-defined data center ( ) for a software development company. The platform is used to developing applications and services. It is important that the customer be able to accurately benchmark performance of developed applications.
The platform has recently commissioned new hosts to update the development cluster.The development cluster host configuration is:
--4 ESXi hosts with 2 sockets × 16 cores
--512 GB RAM divided evenly between sockets
--There is no resource contention
--The benchmarking cluster host configuration is:
--8 ESXi hosts with 2 sockets × 8 cores
--256 GB RAM divided evenly between sockets
--There is no resource contention
--The customer is developing an application that includes a database virtual machine、 The application developer states that the database virtual machine performs as required only when allocated 8 vCPUs 256 GB RAM. The database virtual machine performance meets the required levels when run from the development cluster. Performance benchmarking for the database virtual machine yields highly variable results when run from the benchmarking cluster. The application cannot be released without reliable performance benchmarking data
What is a possible reason for the difference in performance test results between the development and benchmarking clusters?

A.   The database tier breaches a single NUMA node boundary for the benchmarking cluster

B.   The database tier breaches a single NUMA node boundary for the development cluster

C.   The development cluster can support a lower %Ready time per vCPU

D.   The development cluster has more available RAM per host

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-0e10-c0f9-29e3bb5dbe00.html
查看题目
74.The storage team at an organization is planning to migrate from an older Fibre Channel storage environment to a new environment using IP-based storage.
Which two switch features or characteristics are appropriate for IP storage networks? Choose two.

A.   Fabric extending devices

B.   Spanning Tree Protocol (STP)

C.   2:1 or greater bandwidth oversubscription for 10 GbE switches

D.   Non-blocking switch

E.   Deep or ultra buffered switches

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-0810-c0f9-29e3bb5dbe00.html
查看题目
28.In a meeting to discuss the minimum viable product ( ) deployment of a new customer-facing application, the key stakeholder shares details of the application components and the application administrators share details of performance and integrity tests for the application.
The application will be made up of the following components:

A.   15 minutes

B.   60 minutes

C.   105 minutes

D.   90 minutes

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-2d50-c0f9-29e3bb5dbe00.html
查看题目
6.An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?

A.   Large

B.   Small

C.   X-Large

D.   Medium

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe00.html
查看题目
34.Refer to the exhibit.

A.   Use explicit failover order with pNIC0 as Active for ESXi Management and VM Network.
Use explicit failover order with pNIC1 as Active for backup network.
Use explicit failover order with pNIC2 as Active for vMotion.
Use explicit failover order with pNIC3 as Active for replication.

B.   Use the Route Based on IP Hash for ESXi management and VM network.
Use the Route Based on IP Hash for backup network.
Use the Route Based on the Originating Virtual Port for vMotion.
Use failover with pNIC3 as Active for replication.

C.   Create a link aggregation group (LAG) for vDS01.
Use the Route Based on Physical NIC Load for vMotion.
Use the Route Based on Physical NIC Load for replication.

D.   Use the Route Based on IP Hash for ESXi management and VM network.
Use failover with pNIC1 as Active for backup network.Create a link aggregation group (LAG) for vDS02.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-4c90-c0f9-29e3bb5dbe00.html
查看题目
58.Which requirement would be classified as a functional requirement within the design documentation?

A.   The system must perform virtual machine backups through an API.

B.   Virtual machines must be patched within one month of the patch release date.

C.   Virtual machines must be restarted within 30 minutes of a host failure.

D.   The system must be able to scale to support 500 concurrent virtual machines.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-ae38-c0f9-29e3bb5dbe00.html
查看题目

虚拟化高级试题题库4

首页
>
IT互联网
>
虚拟化高级试题题库4

虚拟化高级试题题库4

手机预览
试题通
虚拟化高级试题题库4
章节

虚拟化高级试题题库4(基础知识)

题数量:89
去答题
试题通
试题通
虚拟化高级试题题库4

相关题目

18.A customer requires the use of data encryption to ensure data is not accessible when a drive is removed from the primary storage platform. However, there is also a requirement to use deduplication and compression against all workloads in order to conserve space
Which solution meets the customer requirements?

A.   Data-in-transit encryption

B.   OS-level encryption

C.   Encrypted backups

D.   Array-based encryption

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-fa88-c0f9-29e3bb5dbe01.html
查看题目
33.During a requirements gathering workshop, the customer provides the following requirement that is pertinent to the design of a new vSphere environment:
The Maximum Tolerable Downtime ( ) for all Tier 1 applications is one hour.
Which requirement classification is being gathered for the design documentation?

A.   Manageability

B.   Performance

C.   Availability

D.   Recoverability

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-48a8-c0f9-29e3bb5dbe00.html
查看题目
81.An architect is designing a vSphere environment for a customer and learns that the customer has:

A.   Use Storage DRS.

B.   Use VMDK anti-affinity rules.

C.   Use multiple datastores for heartbeat.

D.   Use a minimum of three storage arrays.

E.   Use VM to host DRS rules.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-2750-c0f9-29e3bb5dbe00.html
查看题目
54.Following a recent acquisition, the architect learns that both companies use vSphere on-premise and will need to combine the data centers into one. The acquired company's licenses will not be renewed for costsavings related to the acquisition. All consumed vSphere licenses must have active support to support lineof-business operations. The merged environment must maintain 25% spare capacity. The architect has asmall budget remaining unallocated for hardwarE、
The architect has calculated that the current vSphere environment can absorb the acquired company's virtual machines but the cluster will run at 90% memory utilization and at 50% CPU utilization.
Which design decision can the architect make to incorporate the new company's virtual machines into the combined vSphere environment?

A.   Migrate the acquired company's virtual machines into the vSphere environment as it will currently fit.

B.   Use the current budget to add memory to the cluster to increase each ESXi host's capacity and add the new virtual machines.

C.   Purchase extra hosts to add to the cluster in anticipation of adding the acquired company's virtual machines.

D.   Purchase new licenses for some of the acquired company's ESXi hosts and add them to the cluster to hold the acquired company's virtual machines.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-9ab0-c0f9-29e3bb5dbe00.html
查看题目
22.An architect is tasked with reviewing the design of a VMware software-defined data center ( ) for a software development company. The platform is used to developing applications and services. It is important that the customer be able to accurately benchmark performance of developed applications.
The platform has recently commissioned new hosts to update the development cluster.The development cluster host configuration is:
--4 ESXi hosts with 2 sockets × 16 cores
--512 GB RAM divided evenly between sockets
--There is no resource contention
--The benchmarking cluster host configuration is:
--8 ESXi hosts with 2 sockets × 8 cores
--256 GB RAM divided evenly between sockets
--There is no resource contention
--The customer is developing an application that includes a database virtual machine、 The application developer states that the database virtual machine performs as required only when allocated 8 vCPUs 256 GB RAM. The database virtual machine performance meets the required levels when run from the development cluster. Performance benchmarking for the database virtual machine yields highly variable results when run from the benchmarking cluster. The application cannot be released without reliable performance benchmarking data
What is a possible reason for the difference in performance test results between the development and benchmarking clusters?

A.   The database tier breaches a single NUMA node boundary for the benchmarking cluster

B.   The database tier breaches a single NUMA node boundary for the development cluster

C.   The development cluster can support a lower %Ready time per vCPU

D.   The development cluster has more available RAM per host

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-0e10-c0f9-29e3bb5dbe00.html
查看题目
74.The storage team at an organization is planning to migrate from an older Fibre Channel storage environment to a new environment using IP-based storage.
Which two switch features or characteristics are appropriate for IP storage networks? Choose two.

A.   Fabric extending devices

B.   Spanning Tree Protocol (STP)

C.   2:1 or greater bandwidth oversubscription for 10 GbE switches

D.   Non-blocking switch

E.   Deep or ultra buffered switches

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-0810-c0f9-29e3bb5dbe00.html
查看题目
28.In a meeting to discuss the minimum viable product ( ) deployment of a new customer-facing application, the key stakeholder shares details of the application components and the application administrators share details of performance and integrity tests for the application.
The application will be made up of the following components:

A.   15 minutes

B.   60 minutes

C.   105 minutes

D.   90 minutes

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-2d50-c0f9-29e3bb5dbe00.html
查看题目
6.An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?

A.   Large

B.   Small

C.   X-Large

D.   Medium

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe00.html
查看题目
34.Refer to the exhibit.

A.   Use explicit failover order with pNIC0 as Active for ESXi Management and VM Network.
Use explicit failover order with pNIC1 as Active for backup network.
Use explicit failover order with pNIC2 as Active for vMotion.
Use explicit failover order with pNIC3 as Active for replication.

B.   Use the Route Based on IP Hash for ESXi management and VM network.
Use the Route Based on IP Hash for backup network.
Use the Route Based on the Originating Virtual Port for vMotion.
Use failover with pNIC3 as Active for replication.

C.   Create a link aggregation group (LAG) for vDS01.
Use the Route Based on Physical NIC Load for vMotion.
Use the Route Based on Physical NIC Load for replication.

D.   Use the Route Based on IP Hash for ESXi management and VM network.
Use failover with pNIC1 as Active for backup network.Create a link aggregation group (LAG) for vDS02.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-4c90-c0f9-29e3bb5dbe00.html
查看题目
58.Which requirement would be classified as a functional requirement within the design documentation?

A.   The system must perform virtual machine backups through an API.

B.   Virtual machines must be patched within one month of the patch release date.

C.   Virtual machines must be restarted within 30 minutes of a host failure.

D.   The system must be able to scale to support 500 concurrent virtual machines.