Make sure that the switch in each panel is set to “OFF”.
A. 确保电门在所有面板中设为正确的状态。
B. 确保每个面板中电门指示灯的处于关掉状态。
C. 确保每个面板中的电门设置为关闭状态。
https://www.shititong.cn/cha-kan/shiti/000045bc-6084-584f-c0f0-9b9ce9a83100.html
点击查看答案
In the description of the airplane's Brake System, how to recognize impending problems and what to do if malfunctions occur shall be explained.
A. 描述飞机刹车系统时,应说明如何识别已经发生的问题以及发生错误时应采取的措施。
B. 描述飞机刹车系统时,应说明如何识别可能会发生的问题以及发生故障时应采取的措施。
C. 描述飞机刹车系统时,应说明如何识别即将发生的问题以及失灵时做什么。
https://www.shititong.cn/cha-kan/shiti/000045bc-6085-df4d-c0f0-9b9ce9a83100.html
点击查看答案
用柔软的干布快速摩擦表面。
A. Vigorously scrub the surface with a rough, dry cloth.
B. Polish the surface with a soft, damp cloth.
C. Rub the surface quickly with a soft, dry cloth.
https://www.shititong.cn/cha-kan/shiti/000045bc-6088-46c2-c0f0-9b9ce9a83100.html
点击查看答案
The gas charging valve is on the top of the shock strut of the nose landing gear.
A. 加油活门可以在前起落架减震支柱下部找到。
B. 充气活门位于前起落架减震支柱顶部。
C. 充气活门可以在前起落架顶部的减震支柱上面找到。
https://www.shititong.cn/cha-kan/shiti/000045bc-607d-db9e-c0f0-9b9ce9a83100.html
点击查看答案
The torsion link assembly can transmit torsional loads from the axle to the shock strut.
A. 拉力连杆组件将拉力载荷从轮轴传递到减震支柱。
B. 张力连杆组件将张力负载从轴心传递到减震支柱。
C. 扭力连杆组件能将扭力载荷从轴传递到减震支柱。
https://www.shititong.cn/cha-kan/shiti/000045bc-607d-fb58-c0f0-9b9ce9a83100.html
点击查看答案
If the drain hole is clogged, clean it.
A. If the drain hole is blocked, clean it.
B. If the drain hole is leaked, clean it.
C. If the drain hole is locked, clean it.
https://www.shititong.cn/cha-kan/shiti/000045bc-607c-868a-c0f0-9b9ce9a83100.html
点击查看答案
Make sure that the indicator light comes on when the blades unfold.
A. 确保指示灯点亮后叶片展开。
B. 确保叶片打开时指示灯点亮。
C. 确保叶片展开的过程中指示灯点亮。
https://www.shititong.cn/cha-kan/shiti/000045bc-607f-e1c1-c0f0-9b9ce9a83100.html
点击查看答案
Those units and components are used to store, regulate, and deliver oxygen to the passengers and crew.
A. 这些单位和组件收集、监管、并向乘客和空乘人员输送氧气。
B. 这些组件和部件用于储存、调节并向乘客和机组人员输送氧气。
C. 这些单位和组件储存、管制、并向乘客和地面机组输送氧气。
https://www.shititong.cn/cha-kan/shiti/000045bc-6086-93fe-c0f0-9b9ce9a83100.html
点击查看答案
ASD would like to thank all the organizations, companies, and individuals who have contributed to this specification.
A. ASD感谢所有对本规范做出整理的组织、公司和个人。
B. ASD感谢所有对本规范做出贡献的组织、公司和个人。
C. ASD感谢所有对本特例做出解释的组织、公司和个人。
https://www.shititong.cn/cha-kan/shiti/000045bc-607f-8b2d-c0f0-9b9ce9a83100.html
点击查看答案
Put the sling on the shackle.
A. 将导轨嵌放在轴上。
B. 将套筒放在支杆上。
C. 把吊环钩在钩环上。
https://www.shititong.cn/cha-kan/shiti/000045bc-6075-e268-c0f0-9b9ce9a83100.html
点击查看答案