APP下载
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题(个人)
搜索
民用航空器维修人员执照英语参考试题(个人)
题目内容
(
单选题
)
作动筒与液压回油管路连通

A、 The operation rods are connected to the hydraulic feedback.

B、 The operation barrels are connected to the hydraulic return.

C、 The actuators are connected to the hydraulic return.

答案:C

民用航空器维修人员执照英语参考试题(个人)
Operate the dimmer switch and make sure that the intensity of the light changes.
https://www.shititong.cn/cha-kan/shiti/000045bc-6081-89f3-c0f0-9b9ce9a83100.html
点击查看题目
If you cannot remove a bolt because of corrosion, apply penetrating oil.
https://www.shititong.cn/cha-kan/shiti/000045bc-607d-4bcc-c0f0-9b9ce9a83100.html
点击查看题目
易燃物品与工作区域保持至少50英尺的距离。
https://www.shititong.cn/cha-kan/shiti/000045bc-6088-7f6a-c0f0-9b9ce9a83100.html
点击查看题目
Apply weight on the surface of the patch to make sure that the parts bond correctly.
https://www.shititong.cn/cha-kan/shiti/000045bc-6081-85a0-c0f0-9b9ce9a83100.html
点击查看题目
Individual, self-contained, gas reservoir assembly supplies the operating pressure within 7-9 seconds after actuation.
https://www.shititong.cn/cha-kan/shiti/000045bc-607d-2e1e-c0f0-9b9ce9a83100.html
点击查看题目
找到油箱加油活门开关,使燃油按计划传输到油箱。
https://www.shititong.cn/cha-kan/shiti/000045bc-608d-0cd3-c0f0-9b9ce9a83100.html
点击查看题目
如果安装了报警器面板,解释一下它是如何工作的。
https://www.shititong.cn/cha-kan/shiti/000045bc-6079-3558-c0f0-9b9ce9a83100.html
点击查看题目
在紧固件上涂上油脂。
https://www.shititong.cn/cha-kan/shiti/000045bc-6079-1870-c0f0-9b9ce9a83100.html
点击查看题目
列出修理或改装指示,可参考另一文件中的标准修理或其他地方(如服务工具包、服务通告等)定义的特殊修理或改装。
https://www.shititong.cn/cha-kan/shiti/000045bc-608d-6c64-c0f0-9b9ce9a83100.html
点击查看题目
When accumulated revisions, including back-up pages, total over 60% of the total pages in the manual, a reissue of the manual should be prepared.
https://www.shititong.cn/cha-kan/shiti/000045bc-6083-8ea8-c0f0-9b9ce9a83100.html
点击查看题目
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题(个人)
题目内容
(
单选题
)
手机预览
民用航空器维修人员执照英语参考试题(个人)

作动筒与液压回油管路连通

A、 The operation rods are connected to the hydraulic feedback.

B、 The operation barrels are connected to the hydraulic return.

C、 The actuators are connected to the hydraulic return.

答案:C

民用航空器维修人员执照英语参考试题(个人)
相关题目
Operate the dimmer switch and make sure that the intensity of the light changes.

A. Utilize the dimmer switch and ensure that the light's luminosity varies vigorously.

B. Manipulate the dimmer switch to confirm the alteration of the light's intensity.

C. Activate the dimmer switch and ascertain that the light's intensity undergoes little changes.

https://www.shititong.cn/cha-kan/shiti/000045bc-6081-89f3-c0f0-9b9ce9a83100.html
点击查看答案
If you cannot remove a bolt because of corrosion, apply penetrating oil.

A. 如果由于腐蚀你不能拆卸螺栓,则涂渗透油。

B. 如果你不能去除螺栓的腐蚀,则申请穿透油。

C. 如果你由于防腐不能拆卸螺钉,则涂渗透油。

https://www.shititong.cn/cha-kan/shiti/000045bc-607d-4bcc-c0f0-9b9ce9a83100.html
点击查看答案
易燃物品与工作区域保持至少50英尺的距离。

A. A maximum distance of 50 feet is required between consumable materials and the work area.

B. Keep flammable materials at a minimum distance of 50 feet from the work area.

C. Explosive materials must be kept at least 50 feet away from the work area.

https://www.shititong.cn/cha-kan/shiti/000045bc-6088-7f6a-c0f0-9b9ce9a83100.html
点击查看答案
Apply weight on the surface of the patch to make sure that the parts bond correctly.

A. Ensure that the parts bond correctly by applying pressure on the base of the patch.

B. Apply weight to the patch surface to ensure a correct bond between the parts.

C. Do not put pressure on the surface of the patch, as it is unnecessary for proper bonding.

https://www.shititong.cn/cha-kan/shiti/000045bc-6081-85a0-c0f0-9b9ce9a83100.html
点击查看答案
Individual, self-contained, gas reservoir assembly supplies the operating pressure within 7-9 seconds after actuation.

A. Independent, self-contained, gas reservoir assembly offers 7-9 seconds of pressure for operating after actuation.

B. Divided, self-contained, gas reservoir assembly stores the operating energy within 7-9 seconds prior actuation.

C. Single, self-contained, gas reservoir assembly provides the operating pressure within 7-9 seconds after actuation.

https://www.shititong.cn/cha-kan/shiti/000045bc-607d-2e1e-c0f0-9b9ce9a83100.html
点击查看答案
找到油箱加油活门开关,使燃油按计划传输到油箱。

A. Find the fueling valve switch for the tank that will get the fuel you are scheduled to transfer.

B. Find the fueling valve switch for the tank that you are scheduled to transfer.

C. Find the fueling valve switch for the tank that need to transfer fuel.

https://www.shititong.cn/cha-kan/shiti/000045bc-608d-0cd3-c0f0-9b9ce9a83100.html
点击查看答案
如果安装了报警器面板,解释一下它是如何工作的。

A. An annunciator device is displayed on the panel, which shows how it works.

B. If an annunciator panel is installed, explain how it operates.

C. If a display appears on the annunciator panel, it explains that how the system works.

https://www.shititong.cn/cha-kan/shiti/000045bc-6079-3558-c0f0-9b9ce9a83100.html
点击查看答案
在紧固件上涂上油脂。

A. Paint the fasteners with oil.

B. Apply the fasteners greasy.

C. Apply grease to the fasteners.

https://www.shititong.cn/cha-kan/shiti/000045bc-6079-1870-c0f0-9b9ce9a83100.html
点击查看答案
列出修理或改装指示,可参考另一文件中的标准修理或其他地方(如服务工具包、服务通告等)定义的特殊修理或改装。

A. To list repair or modification orders, reference may be made to other document's repair standards or the definition of special repair or modification elsewhere (e.g., service kits, service notices, etc.).

B. Listing the repair or modification directions may contrast to the repair rules of another document or especial repairs or modifications defined elsewhere (e.g., service kits, service annunciations, etc.).

C. Set forth repair or modification instructions and may refer to a standard repair in another document or a special repair or modification defined elsewhere, such as in a service kit, service bulletin, etc.

https://www.shititong.cn/cha-kan/shiti/000045bc-608d-6c64-c0f0-9b9ce9a83100.html
点击查看答案
When accumulated revisions, including back-up pages, total over 60% of the total pages in the manual, a reissue of the manual should be prepared.

A. When the cumulative revised pages (including back-up pages) exceeds 60% of the total pages of the manual, a reissue should be prepared.

B. If the updated pages, including back-up pages, were less than 60% of the total page of the manual, a new manual should be copied.

C. Up to 60% of total pages (including back-up pages) were accumulated by mistake, the manual should be rewritten.

https://www.shititong.cn/cha-kan/shiti/000045bc-6083-8ea8-c0f0-9b9ce9a83100.html
点击查看答案
试题通小程序
试题通app下载