A、 防冰和漏气探测器(AILC)探测到左侧引气管道引气泄露。 A bleed air leak detected by AILC in the left bleed ducting.
B、 隔离活门失效在开位或关位。 Isolation valve failed open or closed.
C、 引气泄露后引气关闭且系统未选择关闭。Bleed shutdown after bleed leak and system not selected off.
D、 在通电自检测试中(PBIT),左引气管路的漏气双探测环路失效。 Loss of both leak detection loops in left bleed ducting during PBIT.
答案:B
A、 防冰和漏气探测器(AILC)探测到左侧引气管道引气泄露。 A bleed air leak detected by AILC in the left bleed ducting.
B、 隔离活门失效在开位或关位。 Isolation valve failed open or closed.
C、 引气泄露后引气关闭且系统未选择关闭。Bleed shutdown after bleed leak and system not selected off.
D、 在通电自检测试中(PBIT),左引气管路的漏气双探测环路失效。 Loss of both leak detection loops in left bleed ducting during PBIT.
答案:B
A. 增加 increase
B. 减小 reduces
A. 2000英尺
B. 1500英尺
C. 1000英尺
A. APU 发电机
B. APU 电瓶关断
C. APU 超转
D. APU 失效
A. 30~40 千米
B. 40~60 千米
C. 50~70 千米
A. 液压系统1 Hydraulic system 1
B. 液压系统2 Hydraulic system 2
C. 液压系统3 Hydraulic system 3
D. 气源压力 Pneumatic pressure
A. 减小
B. 增大
C. 不变
A. 9000 米
B. 5400 米
C. 3600 米
A. 38329
B. 38555.0
C. 34065.0
D. 32092