APP下载
首页
>
财会金融
>
英语刷题英语刷题
搜索
英语刷题英语刷题
题目内容
(
单选题
)
primary

A、 位置

B、 提供

C、 原理

D、 主要的

答案:D

英语刷题英语刷题
Unscheduled maintenance checks include inspections and checks such as hard landing, turbulent air, lightning strike, overweight landing, bird strike, slush ingestion, maintenance checks prior to engine-out ferry, etc.
https://www.shititong.cn/cha-kan/shiti/00017884-8090-4f5e-c0a6-5ac6b1259100.html
点击查看题目
On a polished surface, this type of corrosion is first seen as a general dulling or etching of the surface and, if the attack is allowed to continue, the surface becomes rough and possibly frosted in appearance.
https://www.shititong.cn/cha-kan/shiti/00017884-8090-4926-c0a6-5ac6b1259100.html
点击查看题目
(The bypass valve opens if the pressure exceeds 4000 psi.)
https://www.shititong.cn/cha-kan/shiti/00017884-808e-af98-c0a6-5ac6b1259100.html
点击查看题目
(Fuel pressure driven actuator)
https://www.shititong.cn/cha-kan/shiti/00017884-808e-85d2-c0a6-5ac6b1259100.html
点击查看题目
When composite materials are cut or sanded, dust and loose particles are produced which are potential health hazards.
https://www.shititong.cn/cha-kan/shiti/00017884-808f-6b5e-c0a6-5ac6b1259100.html
点击查看题目
The Cockpit Door Surveillance System (CDSS) can monitor the cockpit entrance, the left and right Door 1 areas.
https://www.shititong.cn/cha-kan/shiti/00017884-808f-9551-c0a6-5ac6b1259100.html
点击查看题目
Put the wire bundle through an available cutout. Isolate the wires before you apply the seal. Wind the wire coil separators two to four turns around each wire.
https://www.shititong.cn/cha-kan/shiti/00017884-8090-42c2-c0a6-5ac6b1259100.html
点击查看题目
The effects of corrosion have not been considered in the rationale in selecting inspection times or in the effects on the fatigue stresses.
https://www.shititong.cn/cha-kan/shiti/00017884-808f-d43d-c0a6-5ac6b1259100.html
点击查看题目
Do not let the paint stripper touch fiberglass or seams of adhesive bonded parts. The paint stripper can cause damage to fiberglass or seams of adhesive bonded parts.
https://www.shititong.cn/cha-kan/shiti/00017884-8090-5e9d-c0a6-5ac6b1259100.html
点击查看题目
(boroscope access ports)
https://www.shititong.cn/cha-kan/shiti/00017884-808e-78b7-c0a6-5ac6b1259100.html
点击查看题目
首页
>
财会金融
>
英语刷题英语刷题
题目内容
(
单选题
)
手机预览
英语刷题英语刷题

primary

A、 位置

B、 提供

C、 原理

D、 主要的

答案:D

分享
英语刷题英语刷题
相关题目
Unscheduled maintenance checks include inspections and checks such as hard landing, turbulent air, lightning strike, overweight landing, bird strike, slush ingestion, maintenance checks prior to engine-out ferry, etc.

A. 非计划维护检查包括检查工作如硬着陆、气流颠簸、雷击、超重着陆、鸟击、泥沙积聚、发动机失效调机前的维护检查等。

B. 非计划维护检查包括检查工作如硬着陆、气流颠簸、雷击、超重着陆、鸟击、泥沙吸入、发动机失效调机前的维护检查等。

C. 非计划维护检查包括检查工作如硬着陆、气流颠簸、雷击、超重着陆、鸟击、泥沙吸入、预防发动机失效的维护检查等。

https://www.shititong.cn/cha-kan/shiti/00017884-8090-4f5e-c0a6-5ac6b1259100.html
点击查看答案
On a polished surface, this type of corrosion is first seen as a general dulling or etching of the surface and, if the attack is allowed to continue, the surface becomes rough and possibly frosted in appearance.

A. 在覆盖表层上,这种类型的腐蚀首先被视为表面的一般钝化或蚀刻,如果继续腐蚀,表面会变得粗糙并可能表现为磨砂外观。

B. 在抛光表面上,这种类型的腐蚀首先被视为表面的一般钝化或蚀刻,如果继续腐蚀,表面会变得粗糙并可能表现为磨砂外观。

C. 在抛光表面上,这种类型的腐蚀首先被视为表面的一般侵蚀或蚀刻,如果继续腐蚀,表面会变得粗糙并可能出现雾化。

https://www.shititong.cn/cha-kan/shiti/00017884-8090-4926-c0a6-5ac6b1259100.html
点击查看答案
(The bypass valve opens if the pressure exceeds 4000 psi.)

A. 旁通活门打开使压力达到4000psi

B. 用4000psi压力打开旁通活门

C. 当压力超过4000psi时旁通活门打开

D. 当压力低于4000psi时旁通活门关闭

https://www.shititong.cn/cha-kan/shiti/00017884-808e-af98-c0a6-5ac6b1259100.html
点击查看答案
(Fuel pressure driven actuator)

A. 由燃油压力控制的作动器

B. 由燃油压力驱动的作动器

C. 控制燃油压力的作动器

D. 对燃油施加压力的作动器

https://www.shititong.cn/cha-kan/shiti/00017884-808e-85d2-c0a6-5ac6b1259100.html
点击查看答案
When composite materials are cut or sanded, dust and loose particles are produced which are potential health hazards.

A. 在切割或打磨复合材料时,会产生对健康有潜在危险的灰尘和松动零件。

B. 在切割或打磨复合材料时,会产生对健康有潜在危险的粉尘和松动颗粒。

C. 在切割或打磨复合材料时,会产生致命的粉尘和松动颗粒。

https://www.shititong.cn/cha-kan/shiti/00017884-808f-6b5e-c0a6-5ac6b1259100.html
点击查看答案
The Cockpit Door Surveillance System (CDSS) can monitor the cockpit entrance, the left and right Door 1 areas.

A. 驾驶舱门监视系统(CDSS)能够监测驾驶舱内部、左1门/右1门区域的情况。

B. 驾驶舱门监视系统(CDSS)能够监测驾驶舱门口、左1门/右1门区域的情况。

C. 客舱门监视系统(CDSS)能够监测客舱门口、左1门/右1门区域的情况。

https://www.shititong.cn/cha-kan/shiti/00017884-808f-9551-c0a6-5ac6b1259100.html
点击查看答案
Put the wire bundle through an available cutout. Isolate the wires before you apply the seal. Wind the wire coil separators two to four turns around each wire.

A. 从可用穿孔穿过线束。 在应用封严之前隔离电线。将线圈分离器绕每根导线缠绕两到四圈。

B. 从可用穿孔穿过线束。 在应用封严之前抻直电线。将线圈分离器绕每根导线缠绕两到四圈。

C. 从可用切口穿过线束。 在应用封严之前隔离电线。将线圈分离器绕每根导线缠绕两到四圈。

https://www.shititong.cn/cha-kan/shiti/00017884-8090-42c2-c0a6-5ac6b1259100.html
点击查看答案
The effects of corrosion have not been considered in the rationale in selecting inspection times or in the effects on the fatigue stresses.

A. 腐蚀的影响没有考虑检查时间的选择或疲劳应力的影响。

B. 在选择检查时间或确定疲劳应力影响时,没有考虑腐蚀的影响。

C. 检查时间的选择或疲劳应力的影响没有作为考虑腐蚀影响的因素。

https://www.shititong.cn/cha-kan/shiti/00017884-808f-d43d-c0a6-5ac6b1259100.html
点击查看答案
Do not let the paint stripper touch fiberglass or seams of adhesive bonded parts. The paint stripper can cause damage to fiberglass or seams of adhesive bonded parts.

A. 不要让脱漆剂接触玻璃纤维或粘合部件的封严。脱漆剂会损坏玻璃纤维或粘合部件的封严。

B. 不要让脱漆剂接触玻璃纤维或粘合部件的漆面。脱漆剂会损坏玻璃纤维或粘合部件的漆面。

C. 不要让脱漆剂接触玻璃纤维或粘合部件的接缝。脱漆剂会损坏玻璃纤维或粘合部件的接缝。

https://www.shititong.cn/cha-kan/shiti/00017884-8090-5e9d-c0a6-5ac6b1259100.html
点击查看答案
(boroscope access ports)

A. 钻孔

B. 钻头

C. 孔探孔

D. 孔探仪

https://www.shititong.cn/cha-kan/shiti/00017884-808e-78b7-c0a6-5ac6b1259100.html
点击查看答案
试题通小程序
试题通app下载