APP下载
首页
>
财会金融
>
(英译汉)英语。翻译。汉语
搜索
(英译汉)英语。翻译。汉语
题目内容
(
单选题
)
Stop the test after 2 seconds.

A、 停止测试2秒钟

B、 2秒后启动测试

C、 2秒后终止测试

答案:C

(英译汉)英语。翻译。汉语
The Maintenance Manual and/or Maintenance Data furnished to the Purchaser at the time of aircraft delivery, or upon issuance of the first standard certificate of airworthiness, shall provide sufficient information to enable a qualified mechanic to inspect, troubleshoot, test, and repair or replace all systems and units considered by the manufacturer to be repairable or replaceable as a part of the normal maintenance procedures.
https://www.shititong.cn/cha-kan/shiti/00040595-c1b0-ac0b-c0da-3dc9e14ce300.html
点击查看题目
INSPECTION COMPLIANCE sets forth instructions regarding “when” an inspection is required and whether it is repetitive. Also state if additional repetitive inspections are required based on initial inspection results.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ae-6038-c0da-3dc9e14ce300.html
点击查看题目
Potable system is that portion of the system which is used to store and deliver fresh drinking water.
https://www.shititong.cn/cha-kan/shiti/00040595-c1af-a61f-c0da-3dc9e14ce300.html
点击查看题目
"Towing and Taxiing" also includes those instructions necessary to tow or push the aircraft in normal or abnormal conditions such as towing from soft ground and slippery or icy surfaces, with engines removed, or aircraft damaged.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ac-f01d-c0da-3dc9e14ce300.html
点击查看题目
The instruction to supply hydraulic power is on the bottom of the screen that shows the hydraulic power warning, you must scroll down the screen to see the instruction.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ab-0e19-c0da-3dc9e14ce300.html
点击查看题目
Remove the pin before you turn the pulley.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a3-f73f-c0da-3dc9e14ce300.html
点击查看题目
AC GENERATION includes items such as inverters, AC generators, control and regulating components, indicating systems, etc., all wiring to but not including main buses, as applicable.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ac-e001-c0da-3dc9e14ce300.html
点击查看题目
Always use these words with their approved meanings.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a5-12b8-c0da-3dc9e14ce300.html
点击查看题目
Both digits of Chapter Number in the Continuing Airworthiness Program lnspection number are determined by GAMA Specification No. 2 Numbering System.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ac-98ed-c0da-3dc9e14ce300.html
点击查看题目
This information shall be presented along with information to aid recognition of icing conditions which may exceed the certified capabilities of the aircraft and its ice protection system.
https://www.shititong.cn/cha-kan/shiti/00040595-c1b1-aa16-c0da-3dc9e14ce300.html
点击查看题目
首页
>
财会金融
>
(英译汉)英语。翻译。汉语
题目内容
(
单选题
)
手机预览
(英译汉)英语。翻译。汉语

Stop the test after 2 seconds.

A、 停止测试2秒钟

B、 2秒后启动测试

C、 2秒后终止测试

答案:C

(英译汉)英语。翻译。汉语
相关题目
The Maintenance Manual and/or Maintenance Data furnished to the Purchaser at the time of aircraft delivery, or upon issuance of the first standard certificate of airworthiness, shall provide sufficient information to enable a qualified mechanic to inspect, troubleshoot, test, and repair or replace all systems and units considered by the manufacturer to be repairable or replaceable as a part of the normal maintenance procedures.

A. 在航空器交付时或在签发第一份标准适航证时提供给买方的维修手册和/或维修数据,应包括足够的信息,使合格的机械师能够酌情检查、排除故障、测试、维修或更换制造商认为可维修或可更换的所有系统和组件,以此作为正常维修程序的一部分。

B. 在交付航空器时或在局方颁发标准适航证时,制造商向客户提供的维修手册和/或维修资料应包含足够的信息,以便合格的机械师在正常维护过程中能够检查、排除故障、测试、修理或更换所有可修理或可更换的系统和组件。

C. 在航空器交付时或在签发第一份标准适航证时提供给买方的维修手册和/或维修数据应提供足够的信息,使合格的机械师能够酌情检查、排除故障、测试、维修或更换制造商认为可作为正常维修程序一部分的所有系统和组件。

https://www.shititong.cn/cha-kan/shiti/00040595-c1b0-ac0b-c0da-3dc9e14ce300.html
点击查看答案
INSPECTION COMPLIANCE sets forth instructions regarding “when” an inspection is required and whether it is repetitive. Also state if additional repetitive inspections are required based on initial inspection results.

A. “检查合规性”规定了关于“何时”需要检查的说明,是否为重复性检查。同时说明是否需要根据初步检查结果进行额外的重复检查。

B. “检查合规性”给出了关于“何时”需要检查的说明,是否属于重复性检查。同时说明是否需要根据初始检查结果进行额外的重复检查。

C. “检查合规性”用于描述某检查需要实施的时间以及是否属于重复性检查,并说明是否需要基于初始检查结果进行额外的重复检查。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ae-6038-c0da-3dc9e14ce300.html
点击查看答案
Potable system is that portion of the system which is used to store and deliver fresh drinking water.

A. 饮用水系统是系统中用于储存新鲜饮用水和洗涤用水的那部分。

B. 饮用水系统是系统中用于储存和输送新鲜饮用水的那部分。

C. 饮用水系统是系统中用于输送新鲜饮用水和废水的那部分。

https://www.shititong.cn/cha-kan/shiti/00040595-c1af-a61f-c0da-3dc9e14ce300.html
点击查看答案
"Towing and Taxiing" also includes those instructions necessary to tow or push the aircraft in normal or abnormal conditions such as towing from soft ground and slippery or icy surfaces, with engines removed, or aircraft damaged.

A. “拖动与滑行”中还包括如何在正常和如在软地面、湿滑或结冰的道面,发动机不在翼或飞机受损等非正常情况下拖动和滑行的说明。

B. “拖动与滑行”中还包括如何在正常和如在软地面、湿滑或结冰的道面,发动机不在翼或飞机受损等非正常情况下拖飞机或推飞机的说明。

C. “拖动与滑行”中还包括如何在正常和如在软地面、湿滑或结冰的道面,发动机不在翼等非正常情况下拖飞机或推飞机, 否则飞机将受损的说明。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ac-f01d-c0da-3dc9e14ce300.html
点击查看答案
The instruction to supply hydraulic power is on the bottom of the screen that shows the hydraulic power warning, you must scroll down the screen to see the instruction.

A. 提供液压动力的说明在显示液压动力警告的屏幕底部,你必须向下滚动屏幕才能看到说明。

B. 液压动力供给说明在屏幕底部显示液压动力警告,你必须向下滚动屏幕才能看到说明。

C. 你必须向下滚动屏幕才能看到液压动力供给指令,因为指令在显示警告的屏幕底部。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ab-0e19-c0da-3dc9e14ce300.html
点击查看答案
Remove the pin before you turn the pulley.

A. 转动滑轮之前,拆下销子。

B. 转动扇形盘之前,取下销子。

C. 转动轮毂之前,拆下销子。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a3-f73f-c0da-3dc9e14ce300.html
点击查看答案
AC GENERATION includes items such as inverters, AC generators, control and regulating components, indicating systems, etc., all wiring to but not including main buses, as applicable.

A. 交流发电系统包括变流器、交流发电机、控制和调节组件, 指示系统,连到主汇流条的导线,但主汇流条不包括在内。

B. 交流发电系统包括变流器、交流发电机、控制和调节组件, 指示系统,连到上述部件的导线,但主汇流条不包括在内。

C. 交流发电系统包括整流器、交流发电机、控制和调节组件, 指示系统,连到上述部件的导线,但主汇流条不包括在内。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ac-e001-c0da-3dc9e14ce300.html
点击查看答案
Always use these words with their approved meanings.

A. 避免使用这些词来表达他们论证过的意思。

B. 一定要使用这些词的批准的意思。

C. 一定要用这些词来表达他们认可的方法。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a5-12b8-c0da-3dc9e14ce300.html
点击查看答案
Both digits of Chapter Number in the Continuing Airworthiness Program lnspection number are determined by GAMA Specification No. 2 Numbering System.

A. 《持续适航维修大纲》检查文件编号中系统代号的两位数字应使用GAMA第2号规范的编号体系。

B. 在《持续适航维修大纲》检查文件编号中,代表章号的两位数字应遵循GAMA 第2号规范的编号体系。

C. 《持续适航维修大纲》检查文件编号中的两个数字应由GAMA第2号规范中的编号系统决定。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ac-98ed-c0da-3dc9e14ce300.html
点击查看答案
This information shall be presented along with information to aid recognition of icing conditions which may exceed the certified capabilities of the aircraft and its ice protection system.

A. 当结冰情况超过飞机及其防冰系统的认证能力时,此信息应结合其他信息一起用于判断结冰情况。

B. 这些信息应与其他信息同时显示,用于辅助判断结冰情况是否超出飞机及防冰系统的认证能力。

C. 应将此信息与帮助识别结冰情况的信息一起呈现,这种结冰情况可能超出飞机及其防冰系统的证实能力。

https://www.shititong.cn/cha-kan/shiti/00040595-c1b1-aa16-c0da-3dc9e14ce300.html
点击查看答案
试题通小程序
试题通app下载