APP下载
首页
>
财会金融
>
(英译汉)英语。翻译。汉语
搜索
(英译汉)英语。翻译。汉语
题目内容
(
单选题
)
This step makes sure that the fuel pump operates correctly.

A、 此步骤可以确保燃油泵工作正常。

B、 燃油泵必须要经过这个阶段才能正常工作。

C、 通过这个步骤保证燃料能够到泵的位置。

答案:A

(英译汉)英语。翻译。汉语
Outlets along the side walls and the center of the ceiling divide the air for symmetrical supply.
https://www.shititong.cn/cha-kan/shiti/00040595-c1aa-80e0-c0da-3dc9e14ce300.html
点击查看题目
That portion of the system which supports the nose of the aircraft while the aircraft is on the ground, including items such as shock struts, drag struts, doors, linkages, attach bolts, etc.
https://www.shititong.cn/cha-kan/shiti/00040595-c1af-957e-c0da-3dc9e14ce300.html
点击查看题目
Adjust the gyro accurately.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a3-ff6f-c0da-3dc9e14ce300.html
点击查看题目
Fuel system also includes integral and tip fuel tank leak detection and sealing. Does not include the structure of integral or tip fuel tanks and the fuel cell backing boards, and does not include fuel flow rate sensing, transmitting and/or indicating.
https://www.shititong.cn/cha-kan/shiti/00040595-c1b1-2b98-c0da-3dc9e14ce300.html
点击查看题目
All three bracket holes must align with the fuel tube.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ad-b45b-c0da-3dc9e14ce300.html
点击查看题目
A wire code consists of a circuit function code, wire number, wire segment letter and wire size. Frequently a suffix indicating ground ( N ) , phase (A, B, etc.) or thermocouple material (alumel, etc. ) is added.
https://www.shititong.cn/cha-kan/shiti/00040595-c1af-53f7-c0da-3dc9e14ce300.html
点击查看题目
Make sure that the nuts are tight.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a3-b2ac-c0da-3dc9e14ce300.html
点击查看题目
Temporarily attach the cable to the adjacent structure.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a7-d85e-c0da-3dc9e14ce300.html
点击查看题目
L1 entry door number 1 floor panel has a 1-inch notch 6 inches from the forward right edge.
https://www.shititong.cn/cha-kan/shiti/00040595-c1aa-7f10-c0da-3dc9e14ce300.html
点击查看题目
If the failure occurs regularly, do a system test.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a5-5171-c0da-3dc9e14ce300.html
点击查看题目
首页
>
财会金融
>
(英译汉)英语。翻译。汉语
题目内容
(
单选题
)
手机预览
(英译汉)英语。翻译。汉语

This step makes sure that the fuel pump operates correctly.

A、 此步骤可以确保燃油泵工作正常。

B、 燃油泵必须要经过这个阶段才能正常工作。

C、 通过这个步骤保证燃料能够到泵的位置。

答案:A

(英译汉)英语。翻译。汉语
相关题目
Outlets along the side walls and the center of the ceiling divide the air for symmetrical supply.

A. 空气沿着侧壁和顶板中央流出,分开并同时供气。

B. 出口在侧壁边缘和顶板中央分离空气,以便全面供气。

C. 沿侧壁和顶板中央的出口将空气分开均匀供气。

https://www.shititong.cn/cha-kan/shiti/00040595-c1aa-80e0-c0da-3dc9e14ce300.html
点击查看答案
That portion of the system which supports the nose of the aircraft while the aircraft is on the ground, including items such as shock struts, drag struts, doors, linkages, attach bolts, etc.

A. 当飞机在地面上时支撑飞机机头的那部分系统,包括减震支柱、阻力支柱、门、连接装置、固定螺栓等。

B. 当飞机在地面上时支撑飞机机头的那部分系统。包括刹车、浮子、门、轮胎、固定螺栓等。

C. 当飞机在地面上时支撑飞机机头的那部分系统。包括驱动机构、转向架饰件、门、跳板、上下门闩等。

https://www.shititong.cn/cha-kan/shiti/00040595-c1af-957e-c0da-3dc9e14ce300.html
点击查看答案
Adjust the gyro accurately.

A. 调整加速度计的精度。

B. 准确调整陀螺仪。

C. 调整罗盘的精度。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a3-ff6f-c0da-3dc9e14ce300.html
点击查看答案
Fuel system also includes integral and tip fuel tank leak detection and sealing. Does not include the structure of integral or tip fuel tanks and the fuel cell backing boards, and does not include fuel flow rate sensing, transmitting and/or indicating.

A. 燃油系统部分还包括整体和顶油箱泄露检测及密封作用。不包括的整体或顶尖油箱及燃料电池衬板的结构,也不包括燃料流速传感、传输和/或指示。

B. 燃油系统部分既包括整体和顶部油箱泄露检测及密封,还包括整体或顶部油箱及燃料电池板的结构。但是不包括燃料流速传感、传输和/或指示。

C. 燃油系统部分还包括整体油箱和翼尖油箱泄露检测及密封。不包括整体油箱或翼尖油箱结构及软油箱结构,也不包括燃油流量传感器、传输和/或指示部件。

https://www.shititong.cn/cha-kan/shiti/00040595-c1b1-2b98-c0da-3dc9e14ce300.html
点击查看答案
All three bracket holes must align with the fuel tube.

A. 所有三个螺栓孔必须与燃油管匹配。

B. 所有三个支架孔必须与燃油管对齐。

C. 所有三个支架孔必须与燃油管齐平。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ad-b45b-c0da-3dc9e14ce300.html
点击查看答案
A wire code consists of a circuit function code, wire number, wire segment letter and wire size. Frequently a suffix indicating ground ( N ) , phase (A, B, etc.) or thermocouple material (alumel, etc. ) is added.

A. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示地线(N)、相位(A、B等)或热电偶材料(铝镁合金等)。

B. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示接地(N)、阶段(A、B等)或热敏电门材料(铝镁合金等)。

C. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示地线(N)、相位(A、B等)或热敏电门材料(铝镁合金等)。

https://www.shititong.cn/cha-kan/shiti/00040595-c1af-53f7-c0da-3dc9e14ce300.html
点击查看答案
Make sure that the nuts are tight.

A. 确保螺钉稳固。

B. 确保螺母拧紧。

C. 确保螺栓牢固。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a3-b2ac-c0da-3dc9e14ce300.html
点击查看答案
Temporarily attach the cable to the adjacent structure.

A. 临时地将绳索连接到邻近的结构上。

B. 暂时地将挂钩连接到对应的结构上。

C. 稳固连接钢索到附近的结构上。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a7-d85e-c0da-3dc9e14ce300.html
点击查看答案
L1 entry door number 1 floor panel has a 1-inch notch 6 inches from the forward right edge.

A. 左1号登机门1号地板右前边缘有一条1英寸深6英寸长的凹陷。

B. 左1号登机门1号地板离右前边缘6英寸处有一条1英寸深的凹槽。

C. 左1号登机门有一块地板到右前边缘6英寸处有一条1英寸深的凹坑。

https://www.shititong.cn/cha-kan/shiti/00040595-c1aa-7f10-c0da-3dc9e14ce300.html
点击查看答案
If the failure occurs regularly, do a system test.

A. 如果故障频繁出现,进行系统测试。

B. 如果故障定期出现,进行系统测试。

C. 如果故障随机出现,进行操作测试。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a5-5171-c0da-3dc9e14ce300.html
点击查看答案
试题通小程序
试题通app下载