APP下载
首页
>
财会金融
>
(英译汉)英语。翻译。汉语
搜索
(英译汉)英语。翻译。汉语
题目内容
(
单选题
)
At approximately 300 knots, the light comes on.

A、 灯只会在300节速度下亮起。

B、 在超过300节的速度时,灯会亮起。

C、 在大约300节的时候灯就会亮。

答案:C

(英译汉)英语。翻译。汉语
This procedure gives two methods for the temporary repair of the water tubes.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ab-30f1-c0da-3dc9e14ce300.html
点击查看题目
The manufacturer's maintenance data shall include directions as to who and how to contact technical personnel at the manufacturer plant ,for assistance in repairing and replacing items damaged and not covered by a standard repair.
https://www.shititong.cn/cha-kan/shiti/00040595-c1af-55d4-c0da-3dc9e14ce300.html
点击查看题目
Cut the cable into three equal lengths.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a6-5865-c0da-3dc9e14ce300.html
点击查看题目
When the hydraulic pressure is released, the sequence valve moves to the open position.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a9-1f79-c0da-3dc9e14ce300.html
点击查看题目
In such a case, the Title Page and the Table of Contents pages preceding each section of the Document must bear the actual date of issue.
https://www.shititong.cn/cha-kan/shiti/00040595-c1ab-fcac-c0da-3dc9e14ce300.html
点击查看题目
Terms that contain a capital letter plus a noun, or a number plus a noun usually describe the shape or configuration of something.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a9-41a1-c0da-3dc9e14ce300.html
点击查看题目
Make an analysis of the oil.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a4-bc4c-c0da-3dc9e14ce300.html
点击查看题目
You can replace a large number of units during engine installation.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a5-b891-c0da-3dc9e14ce300.html
点击查看题目
Phase letter "V" shall be used as a suffix on the cable identification code to identify the ungrounded wire or cable that is in a single-phase system.
https://www.shititong.cn/cha-kan/shiti/00040595-c1af-16fd-c0da-3dc9e14ce300.html
点击查看题目
Send five copies of the defect report to the engineering authority.
https://www.shititong.cn/cha-kan/shiti/00040595-c1a9-29a6-c0da-3dc9e14ce300.html
点击查看题目
首页
>
财会金融
>
(英译汉)英语。翻译。汉语
题目内容
(
单选题
)
手机预览
(英译汉)英语。翻译。汉语

At approximately 300 knots, the light comes on.

A、 灯只会在300节速度下亮起。

B、 在超过300节的速度时,灯会亮起。

C、 在大约300节的时候灯就会亮。

答案:C

(英译汉)英语。翻译。汉语
相关题目
This procedure gives two methods for the temporary repair of the water tubes.

A. 本程序给出了用于水管临时修理的两种方法。

B. 本程序给出了水管的永久修理方法。

C. 本程序详细阐述了两种方法来解决水管的修理。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ab-30f1-c0da-3dc9e14ce300.html
点击查看答案
The manufacturer's maintenance data shall include directions as to who and how to contact technical personnel at the manufacturer plant ,for assistance in repairing and replacing items damaged and not covered by a standard repair.

A. 制造商的维修文件中应包含制造厂的技术人员的联系方法,以便在修理和更换受损部件方面和超出标准修理的部分提供帮助。

B. 制造商的维修记录应包括制造商厂的技术人员的联系方法,以便了解在标准修理范围之外修理和更换受损部件方面的信息。

C. 制造商的维修文件中应包含如何制造厂的技术人员的指令,以便在修理和更换受损部件方面和超出标准修理的部分提供帮助

https://www.shititong.cn/cha-kan/shiti/00040595-c1af-55d4-c0da-3dc9e14ce300.html
点击查看答案
Cut the cable into three equal lengths.

A. 将钢索拼成三段那么高。

B. 将电缆剪成三等份那么宽。

C. 将钢索剪成等长的三段。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a6-5865-c0da-3dc9e14ce300.html
点击查看答案
When the hydraulic pressure is released, the sequence valve moves to the open position.

A. 当释放液压时,活门按顺序打开。

B. 当液压被释放后,顺序活门移动到开位。

C. 当液压增压时,要按顺序移动来打开活门。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a9-1f79-c0da-3dc9e14ce300.html
点击查看答案
In such a case, the Title Page and the Table of Contents pages preceding each section of the Document must bear the actual date of issue.

A. 在此种情况下,文件的标题页和目录页必须遵循每一部分给出实际出版日期。

B. 在此种情况下,文件每一部分之前的标题页和目录页必须标明实际出版日期。

C. 在此种情况下,标题和目录页要放在文档每个部分之前,并必须给出实际出版日期。

https://www.shititong.cn/cha-kan/shiti/00040595-c1ab-fcac-c0da-3dc9e14ce300.html
点击查看答案
Terms that contain a capital letter plus a noun, or a number plus a noun usually describe the shape or configuration of something.

A. 包含大写字母加名词或数字加名词的术语,通常用于描述某物的形状或结构。

B. 包含大写字母加名词或数字加名词的条款,通常用于描述某事的形式或特性。

C. 项目首字母加名词或者数字加名词的,通常要描述某物的外形和构造。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a9-41a1-c0da-3dc9e14ce300.html
点击查看答案
Make an analysis of the oil.

A. 滑油必须要分析。

B. 对滑油进行分析。

C. 已经分析了滑油。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a4-bc4c-c0da-3dc9e14ce300.html
点击查看答案
You can replace a large number of units during engine installation.

A. 你需要在安装发动机时更换大量零件。

B. 更换发动机时,你可以安装大量部件。

C. 在发动机安装时可能更换大量部件。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a5-b891-c0da-3dc9e14ce300.html
点击查看答案
Phase letter "V" shall be used as a suffix on the cable identification code to identify the ungrounded wire or cable that is in a single-phase system.

A. V是一个用来表示阶段的字母,在单向系统的导线识别码中表示非接地导线。

B. V是一个用来表示相位的字母,在单相系统的导线识别码中表示非接地导线。

C. V是一个用来表示相序的字母,在单向系统的导线识别码中表示非接地导线。

https://www.shititong.cn/cha-kan/shiti/00040595-c1af-16fd-c0da-3dc9e14ce300.html
点击查看答案
Send five copies of the defect report to the engineering authority.

A. 将五份缺陷报告送到工程主管部门。

B. 将五份无损报告送到发动机权威人士。

C. 将五份探测报表送到主管工程师。

https://www.shititong.cn/cha-kan/shiti/00040595-c1a9-29a6-c0da-3dc9e14ce300.html
点击查看答案
试题通小程序
试题通app下载