The installation changed the routing of the cable loom.

A、 The routing of the cable loom may have been altered by the installation.

B、 The routing of the cable loom may have been held by the installation.

C、 The routing of the cable loom may have been defended by the installation.

答案:A

(英译英)英语。翻译。英语
Solenoid valves shall be shown with a notation indicating whether the valve is spring-loaded to the open or closed position.
https://www.shititong.cn/cha-kan/shiti/00040660-8bff-576a-c0da-3dc9e14ce300.html
点击查看题目
Examine the drain holes for blockage.
https://www.shititong.cn/cha-kan/shiti/00040660-8bfe-710a-c0da-3dc9e14ce300.html
点击查看题目
Repeat application of clean solvent as necessary to remove oils.
https://www.shititong.cn/cha-kan/shiti/00040660-8bfe-65fa-c0da-3dc9e14ce300.html
点击查看题目
If the clearance dimension is out of tolerance, adjust the clearance dimension between the extend proximity sensor [44A] and the target [45]. Some of the ducts in the air distribution system are wrapped with insulation material.
https://www.shititong.cn/cha-kan/shiti/00040660-8bff-afb0-c0da-3dc9e14ce300.html
点击查看题目
Replace nuts and washers if removed during inspection.
https://www.shititong.cn/cha-kan/shiti/00040660-8bfd-5bc0-c0da-3dc9e14ce300.html
点击查看题目
Revisions are to be made consistent with the format of the specification using the provisions of FAR 21.50 as a basis.
https://www.shititong.cn/cha-kan/shiti/00040660-8bff-19b9-c0da-3dc9e14ce300.html
点击查看题目
Attach the two stringers together with rivets.
https://www.shititong.cn/cha-kan/shiti/00040660-8bfd-8681-c0da-3dc9e14ce300.html
点击查看题目
Do these steps to replace the light assembly.
https://www.shititong.cn/cha-kan/shiti/00040660-8bfd-b009-c0da-3dc9e14ce300.html
点击查看题目
Procedures for handling malfunctions or other abnormalities that are not of emergency nature, or involve a potential emergency that may be deferred may be included in this Section.
https://www.shititong.cn/cha-kan/shiti/00040660-8bff-2e86-c0da-3dc9e14ce300.html
点击查看题目
If the brackets are not damaged, continue the procedure.
https://www.shititong.cn/cha-kan/shiti/00040660-8bfe-87f8-c0da-3dc9e14ce300.html
点击查看题目
首页
>
财会金融
>
(英译英)英语。翻译。英语
题目内容
(
单选题
)
手机预览
(英译英)英语。翻译。英语

The installation changed the routing of the cable loom.

A、 The routing of the cable loom may have been altered by the installation.

B、 The routing of the cable loom may have been held by the installation.

C、 The routing of the cable loom may have been defended by the installation.

答案:A

(英译英)英语。翻译。英语
相关题目
Solenoid valves shall be shown with a notation indicating whether the valve is spring-loaded to the open or closed position.

A. Solenoid valves shall be shown with a notation. The notation indicates the spring is loaded by the valve to the open or closed position.

B. Solenoid valves shall be shown with a symbol. The valve indicates whether the valve is spring-loaded to the open or closed position.

C. Solenoid valves shall be shown with a mark. The mark indicates whether the valve is spring-loaded to the open or closed position.

https://www.shititong.cn/cha-kan/shiti/00040660-8bff-576a-c0da-3dc9e14ce300.html
点击查看答案
Examine the drain holes for blockage.

A. Inspect the drain holes for obstruction.

B. Check for the drain holes for abrasion.

C. Check the drain holes for leakage.

https://www.shititong.cn/cha-kan/shiti/00040660-8bfe-710a-c0da-3dc9e14ce300.html
点击查看答案
Repeat application of clean solvent as necessary to remove oils.

A. Use the clean solvent again to leave the oils on the surface.

B. If necessary, clean the oils by applying clean solution.

C. Remove the oils, if necessary, by applying clean solvent again.

https://www.shititong.cn/cha-kan/shiti/00040660-8bfe-65fa-c0da-3dc9e14ce300.html
点击查看答案
If the clearance dimension is out of tolerance, adjust the clearance dimension between the extend proximity sensor [44A] and the target [45]. Some of the ducts in the air distribution system are wrapped with insulation material.

A. If the clearance dimension is not accurate, adjust the clearance dimension between the extend proximity sensor [44A] and the target [45]. Some of the ducts in the air distribution system are wrapped with insulation material.

B. Adjust the clearance dimension between the extend proximity sensor [44A] and the target [45] in case of the clearance dimension is out of tolerance. Some of the ducts in the air distribution system are wrapped with non-conductive material .

C. Adjust the clearance dimension between the extend proximity sensor [44A] and the target [45] until the clearance dimension is out of range. Some of the ducts in the air distribution system are wrapped with compound material.

https://www.shititong.cn/cha-kan/shiti/00040660-8bff-afb0-c0da-3dc9e14ce300.html
点击查看答案
Replace nuts and washers if removed during inspection.

A. During inspection, if the nuts and washers are removed, recheck them.

B. Take a good place for the nuts and washers removed during inspection.

C. If nuts and washers are removed during inspection, install the new ones.

解析:这道题是关于在检查过程中如果螺母和垫圈被移除应该怎么处理的问题。正确答案是C:如果在检查过程中螺母和垫圈被移除,应该安装新的螺母和垫圈。

举个生动的例子来帮助理解这个知识点:假设你正在检查一台机器,发现其中的螺母和垫圈已经磨损或者损坏了,这时候就需要将它们移除并安装新的螺母和垫圈。因为螺母和垫圈在机器中起着固定和缓冲的作用,如果它们磨损或者损坏了,就需要及时更换,以确保机器的正常运转和安全性。

https://www.shititong.cn/cha-kan/shiti/00040660-8bfd-5bc0-c0da-3dc9e14ce300.html
点击查看答案
Revisions are to be made consistent with the format of the specification using the provisions of FAR 21.50 as a basis.

A. By using the basic provisions of FAR 21.50, revisions become consistent with the format of the specification.

B. FAR 21.50 provisions are the basic to the revisions which are consistent with the format of the specification.

C. To make revisions consistent with the format of the specification, the provisions of FAR 21.50 should be adopted as a basis.

https://www.shititong.cn/cha-kan/shiti/00040660-8bff-19b9-c0da-3dc9e14ce300.html
点击查看答案
Attach the two stringers together with rivets.

A. Rivets can be used to separate the two stringers.

B. You can use two rivets to attach the stringers together.

C. Use rivets to connect the two stringers together.

https://www.shititong.cn/cha-kan/shiti/00040660-8bfd-8681-c0da-3dc9e14ce300.html
点击查看答案
Do these steps to replace the light assembly.

A. There are several steps to replace the light assembly.

B. The steps to replace the light assembly are not complicated.

C. The following steps are to change the light component.

https://www.shititong.cn/cha-kan/shiti/00040660-8bfd-b009-c0da-3dc9e14ce300.html
点击查看答案
Procedures for handling malfunctions or other abnormalities that are not of emergency nature, or involve a potential emergency that may be deferred may be included in this Section.

A. Procedures for handling malfunctions or other abnormalities that are not emergent, or potentially emergent may be delayed in this section.

B. This Section may cover procedures for handling malfunctions or other deviations that are not of emergency nature, or involve a potential emergency that may be handled later.

C. This Section may cover procedures for handling malfunctions or other deviations that are not emergent, or involve a potential emergency that may be deterred.

https://www.shititong.cn/cha-kan/shiti/00040660-8bff-2e86-c0da-3dc9e14ce300.html
点击查看答案
If the brackets are not damaged, continue the procedure.

A. In the case of damage to the brackets, continue the procedure.

B. In the absence of damage to the brackets, continue the procedure.

C. In the condition of damage to the brackets, continue the procedure.

https://www.shititong.cn/cha-kan/shiti/00040660-8bfe-87f8-c0da-3dc9e14ce300.html