52、A vSphere cluster has the following configuration: • Virtual machines (VMs) are running Production and Test workloads • vSphere Distributed Resource Scheduler (DRS) is enabled • There are no resource pools in the cluster Performance monitoring data shows that the Production workload VMs are not receiving their fully allocated memory when the vSphere cluster is fully utilized. A combination of which two steps could the administrator perform to ensure that the Production VMs are always guaranteed the full allocation of memory? (Choose two.)

A、 Assign a custom memory share value to the resource pool containing the Production VMs.

B、 Assign a memory reservation value to the resource pool containing the Production VMs.

C、 Create a parent resource pool for the Production VMs

D、 Create a sibling resource pool for each of the Production and Test VMs.

E、 Create a child resource pool for the Test VMs.

F、

G、

H、

I、

J、

答案:BD

解析:

英文知识复习题库
7、An administrator notices a performance issue in VMware vCenter To try and understand more about the performance issue, the administrator needs to gather more information about the vCenter database to eliminate a potential disk space issue.Which two tools can the administrator use? (Choose two.)
https://www.shititong.cn/cha-kan/shiti/000491c6-da97-6091-c0a9-459fb8cdb200.html
点击查看题目
73、An administrator is responsible for the management of a VMware vCenter instance that is currently experience performance issues. The administrator quickly identifies that the CPU and memory utilization of vCenter is consistently over 90%. Upon further analysis, it seems that the vpxd process is contributing significantly to the performance issue.(Choose four)
https://www.shititong.cn/cha-kan/shiti/000491c6-daab-d06d-c0a9-459fb8cdb200.html
点击查看题目
91、Which two tasks can be completed using vSphere LifeCycle Manager? (Choose two )
https://www.shititong.cn/cha-kan/shiti/000491c6-daae-7ec3-c0a9-459fb8cdb200.html
点击查看题目
43、An administrator needs to update a VMware vCenter instance to a newer minor release version. Due to restrictions within the environment, the vCenter instance does not have access to the Internet As a first step, the administrator downloads the required update on another machine. What are the next steps the administrator must perform to complete the update?
https://www.shititong.cn/cha-kan/shiti/00049244-4f89-6038-c070-20603eaf6c00.html
点击查看题目
31、An administrator remotely deploys VMware ESXi using an out of band management connection and now needs to complete the configuration of the management network so that the host is accessible through the vSphere Host Client.The following information has been provided to complete the configuration:•Host FQDN esxi01corp.local•Management VLAN ID: 10 DHCP: No•Management IP Address: 172.16.10.101/24•Management IP Gateway: 172.16.10.1. Corporate DNS Servers: 172 16.10.5, 172.16.10..6•DNS Domain: corp.local. In addition, all host configurations must also meet the following requirements:
•The management network must use only IPv4 network protocols.
•The management network must be fault tolerant
Which four high level tasks should the administrator complete in the Direct Console User Interface (DCUI) in order to meet the requirements and successfully log into the vSphere Host Client? (Choose four.)
https://www.shititong.cn/cha-kan/shiti/000491c6-daa1-aa63-c0a9-459fb8cdb200.html
点击查看题目
69、 An administrator set up the following configuration: • The distributed switch has four ESXi hosts, and each host has two 10 Gbps NICs. • In the Network I/O Control configuration, the amount of bandwidth reserved for virtual machine (VM) traffic if 4 Gbps. The administrator wants to guarantee that VMs in the Retail distributed port group can access 50 percent of the available reserved bandwidth for VM traffic. Given this scenario, what should the size (in Gbps ) of the Retail network resource pool be?
https://www.shititong.cn/cha-kan/shiti/00049244-4f96-5b92-c070-20603eaf6c00.html
点击查看题目
63、An administrator is working with VMware Support and Is asked to provide log bundles for the ESXI hosts in an environment.three options Joes the administrator have? (Choose three)
https://www.shititong.cn/cha-kan/shiti/000491c6-daa6-8a15-c0a9-459fb8cdb200.html
点击查看题目
4、An administrator is tasked with configuring remote direct memory access (RDMA) over Converged Ethernet v2 (RoCE v2).Which two types of adapters must the administrator configure? (Choose two.)
https://www.shititong.cn/cha-kan/shiti/000491c6-da96-e6b2-c0a9-459fb8cdb200.html
点击查看题目
82、What is the role of vSphere Distributed Services Engine?
https://www.shititong.cn/cha-kan/shiti/00049244-4f9d-39b4-c070-20603eaf6c00.html
点击查看题目
3、An administrator has a requirement to revert a running virtual machine to a previous snapshot after a failed attempt to upgrade an application. When the administrator originally took the snapshot, the following choices in the Take Snapshot dialog were made:• Snapshot the virtual machine's memory = false • Quiesce guest file system = false What will be the result of the administrator selecting the ‘Revert to Latest Snapshot? option to return the virtual machine to a previous snapshot? (Choose two.)
https://www.shititong.cn/cha-kan/shiti/000491c6-da96-51bc-c0a9-459fb8cdb200.html
点击查看题目
首页
>
外语语音
>
英文知识复习题库
题目内容
(
多选题
)
手机预览
英文知识复习题库

52、A vSphere cluster has the following configuration: • Virtual machines (VMs) are running Production and Test workloads • vSphere Distributed Resource Scheduler (DRS) is enabled • There are no resource pools in the cluster Performance monitoring data shows that the Production workload VMs are not receiving their fully allocated memory when the vSphere cluster is fully utilized. A combination of which two steps could the administrator perform to ensure that the Production VMs are always guaranteed the full allocation of memory? (Choose two.)

A、 Assign a custom memory share value to the resource pool containing the Production VMs.

B、 Assign a memory reservation value to the resource pool containing the Production VMs.

C、 Create a parent resource pool for the Production VMs

D、 Create a sibling resource pool for each of the Production and Test VMs.

E、 Create a child resource pool for the Test VMs.

F、

G、

H、

I、

J、

答案:BD

解析:

分享
英文知识复习题库
相关题目
7、An administrator notices a performance issue in VMware vCenter To try and understand more about the performance issue, the administrator needs to gather more information about the vCenter database to eliminate a potential disk space issue.Which two tools can the administrator use? (Choose two.)

A.  vCenter Management Interface (VAMI)

B.  Perfmon

C.  Df

D.  Esxtop

E.  vSphere Client

F.

G.

H.

I.

J.

解析:

https://www.shititong.cn/cha-kan/shiti/000491c6-da97-6091-c0a9-459fb8cdb200.html
点击查看答案
73、An administrator is responsible for the management of a VMware vCenter instance that is currently experience performance issues. The administrator quickly identifies that the CPU and memory utilization of vCenter is consistently over 90%. Upon further analysis, it seems that the vpxd process is contributing significantly to the performance issue.(Choose four)

A.  Gracefully shut down vCenter using the vSphere Client

B.  Enable CPU Hot add on the vCenter virtual machine.

C.  Power on the vCenter Server Appliance using the vSphere Host Client.

D.  Add a additional CPU and memory to the vCenter Server Appliance.

E.  Enable CPU an Memory Hot add on the vCenter virtual machine.

F.

G.

H.

I.

J.

解析:

https://www.shititong.cn/cha-kan/shiti/000491c6-daab-d06d-c0a9-459fb8cdb200.html
点击查看答案
91、Which two tasks can be completed using vSphere LifeCycle Manager? (Choose two )

A.  Manage the firmware lifecycle of ESXi hosts that are part of a managed cluster with a single image.

B.  Check that the ESXi hosts are compliant with the recommended baseline and update the hosts

C.  Upgrade VMware vCenter from version 7 to 8.

D.  Check the hardware compatibility of the hosts in a cluster against the VMware Compatibility Guide (VCG) using baselines.

E.  Manage the firmware lifecycle of ESXi hosts are part of a managed cluster using baselines

F.

G.

H.

I.

J.

解析:

https://www.shititong.cn/cha-kan/shiti/000491c6-daae-7ec3-c0a9-459fb8cdb200.html
点击查看答案
43、An administrator needs to update a VMware vCenter instance to a newer minor release version. Due to restrictions within the environment, the vCenter instance does not have access to the Internet As a first step, the administrator downloads the required update on another machine. What are the next steps the administrator must perform to complete the update?

A.  Place the update ISO file in a Virtual Machine File System (VMFS) datastore. Use the vSphere Client to select the update ISO file as the source for the update

B.  Mount the ISO update file to the CD-ROM drive of the vCenter instance Use the vCenter Management Interface to select the CD-ROM as the source for the update

C.  Place the ISO update file in a folder accessible to the vCenter instance over HTTPS. Use the vCenter Management Interface to select the update file as the source for the update

D.  Place the ZIP update file in a folder accessible to the vCenter instance over HTTPS Use the vSphere Client to select the update file as the source for the update

https://www.shititong.cn/cha-kan/shiti/00049244-4f89-6038-c070-20603eaf6c00.html
点击查看答案
31、An administrator remotely deploys VMware ESXi using an out of band management connection and now needs to complete the configuration of the management network so that the host is accessible through the vSphere Host Client.The following information has been provided to complete the configuration:•Host FQDN esxi01corp.local•Management VLAN ID: 10 DHCP: No•Management IP Address: 172.16.10.101/24•Management IP Gateway: 172.16.10.1. Corporate DNS Servers: 172 16.10.5, 172.16.10..6•DNS Domain: corp.local. In addition, all host configurations must also meet the following requirements:
•The management network must use only IPv4 network protocols.
•The management network must be fault tolerant
Which four high level tasks should the administrator complete in the Direct Console User Interface (DCUI) in order to meet the requirements and successfully log into the vSphere Host Client? (Choose four.)

A.  Set the value of the VMware ESXi Management Network VLAN ID to 10

B.  Configure at least two network adapters for the VMware ESXi Management Network

C.  Update the VMware ESXi Management Network IPv4 configuration to use a static IPv4 address

D.  Create a DNS A Record for the VMware ESXi host on the corporate DNS servers

E.  Disable IPv6 for the VMware ESXi Management Network

F.  Restore the original Management vSphere Standard Switch.

G.  Update the VMware ESXi Management Network DNS configuration to use the corporate DNS servers for ' names resolution

H.

I.

J.

解析:

https://www.shititong.cn/cha-kan/shiti/000491c6-daa1-aa63-c0a9-459fb8cdb200.html
点击查看答案
69、 An administrator set up the following configuration: • The distributed switch has four ESXi hosts, and each host has two 10 Gbps NICs. • In the Network I/O Control configuration, the amount of bandwidth reserved for virtual machine (VM) traffic if 4 Gbps. The administrator wants to guarantee that VMs in the Retail distributed port group can access 50 percent of the available reserved bandwidth for VM traffic. Given this scenario, what should the size (in Gbps ) of the Retail network resource pool be?

A. 40

B. 32

C. 8

D. 16

E.

F.

G.

H.

I.

J.

解析:解析: 4Gbps*8Nic=32Gbps*50%=16Gbps

https://www.shititong.cn/cha-kan/shiti/00049244-4f96-5b92-c070-20603eaf6c00.html
点击查看答案
63、An administrator is working with VMware Support and Is asked to provide log bundles for the ESXI hosts in an environment.three options Joes the administrator have? (Choose three)

A.  Generate a combined log bundle for all ESXI hosts using the vCenter Management Interface

B.  Generate a separate log bundle for each ESXI host using the vSphere Host Client.

C.  Generate a combined log bundle for all ESXI hosts using the vSphere Client.

D.  Generate a separate log bundle for each ESXI host using the vSphere Client.

E.  Generate a separate log bundle for each ESXI host using the vCenter Management Interface.

F.  Generate a combined log bundle for all ESXi hosts using the vSphere Host Client.

G.

H.

I.

J.

解析:解释选项B、C和D是正确的,因为它们是为使用不同接口的单个或多个ESXi主机生成日志包的有效方法。选项A和E不正确,因为它们不是使用vCenter管理界面为所有ESXi主机生成日志包的可能选项。选项F不正确,因为不可能使用vSphere Host Client为所有ESXi主机生成组合日志捆绑包。

https://www.shititong.cn/cha-kan/shiti/000491c6-daa6-8a15-c0a9-459fb8cdb200.html
点击查看答案
4、An administrator is tasked with configuring remote direct memory access (RDMA) over Converged Ethernet v2 (RoCE v2).Which two types of adapters must the administrator configure? (Choose two.)

A.  Paravirtual RDMA adapter

B.  RDMA network adapter

C.  Software iSCSi adapter

D.  Fibre Channel over Ethernet (FCoE) adapter

E.  Software NVMe over RDMA storage adapter

F.

G.

H.

I.

J.

解析:解析:: ESXi 7 and later supports RoCE v2 technology, which enables RDMA over an Ethernet network. Hosts use an RDMA network adapter installed on the host and a software NVMe over RDMA storage adapter.解释:ESXi 7及更高版本支持RoCE v2技术,该技术可通过以太网实现RDMA。主机使用安装在主机上的RDMA网络适配器和RDMA软件NVMe存储适配器。

https://www.shititong.cn/cha-kan/shiti/000491c6-da96-e6b2-c0a9-459fb8cdb200.html
点击查看答案
82、What is the role of vSphere Distributed Services Engine?

A.  Provide a live shadow Instance of a virtual machine (VM) that mirror, the primary VM to prevent data loss and downtime during outages

B.  Implement Quality of Service (QoS) on network traffic within a vSphert Distributed Switch

C.  Provide hardware accelerated data processing to boort infrastructure performance

D.  Redistribute virtual machines across vSphere cluster host affinity rules following host failures or during maintenance operations

解析:解析: The role of vSphere Distributed Services Engine is to provide hardware accelerated data processing to boost infrastructure performance by offloading network services from the CPU to the DPU.VSP here Distributed Services Engine的作用是提供硬件加速数据处理,通过将网络服务从CPU转移到DPU来提升基础架构性能。

https://www.shititong.cn/cha-kan/shiti/00049244-4f9d-39b4-c070-20603eaf6c00.html
点击查看答案
3、An administrator has a requirement to revert a running virtual machine to a previous snapshot after a failed attempt to upgrade an application. When the administrator originally took the snapshot, the following choices in the Take Snapshot dialog were made:• Snapshot the virtual machine's memory = false • Quiesce guest file system = false What will be the result of the administrator selecting the ‘Revert to Latest Snapshot? option to return the virtual machine to a previous snapshot? (Choose two.)

A.  The virtual machine will be restored to the parent snapshot

B.  The virtual machine will be restored in a powered off state

C.  The virtual machine will be restored to the child snapshot

D.  The virtual machine will be restored in a powered on state

E.  The virtual machine will be restored in a suspended state

F.

G.

H.

I.

J.

解析:

https://www.shititong.cn/cha-kan/shiti/000491c6-da96-51bc-c0a9-459fb8cdb200.html
点击查看答案
试题通小程序
试题通app下载