A、 如果部件跌落,有可能会造成轻微的损坏。
B、 如果部件掉落,可能会造成永久性的损坏。
C、 部件永久性的损坏可能是由掉落造成的
答案:B
A、 如果部件跌落,有可能会造成轻微的损坏。
B、 如果部件掉落,可能会造成永久性的损坏。
C、 部件永久性的损坏可能是由掉落造成的
答案:B
A. Materials used to repair layered structures must keep the rigidity,gravity,aerodynamic or electronic properties of the original assembly.
B. The materials used in the repair of laminate structures must preserve the strength,weight,aerodynamic characteristics,or electrical properties of the original assembly.
C. Materials that are used for fixing the layer structures must maintain the intensity,weight,aerodynamic or electrical properties of the original assembly.
A. Such tests or checks will be completed according to the conditions.
B. Such tests or checks will be very complex according to the conditions.
C. Such tests or checks will be different in complexity according to the conditions.
A. 确保你安装的 LVDT 端头或轴不是弯曲的。如果你安装了端头或轴是弯曲的 LVDT,那么可能造成指示错误或设备损坏。
B. 当需要安装 LVDT 时,你要确保其支架或轴的端头不是弯曲的。如果它们是弯曲的,就会使指示出现错误或损坏设备。
C. 安装 LVDT 时,确保不要将 LVDT 的杆端头或轴弯曲。如果你弄弯了杆端头或轴,有可能会造成错误的指示或损坏设备。
A. Landing gear position has no effect on stall speeds.
B. The position of the landing gear doesn't influence the surging speed.
C. The idle speed is not effected by the landing gear position.
A. irworthiness Section must set forth each mandatory replacement time,structural inspection interval,and related structural inspection procedurerequired for type certification." A.“适航性”部分必须规定每个强制性更换时间、结构检查间隔以及与型号认证有关的相关结构检查程序。
B. ”适航性”部分必须规定与型号合格证取证要求的每个强制性更换时间、结构检查间隔以及结构检查程序。
C. “适航性“部分必须规定每个强制性更换时间、结构检查间隔以及与取型号合格证有关的相关结构检查程序。
A. Procedures contain tasks that give instructions on how to perform them.
B. Procedures contain general instructions that show you how to do tasks.
C. Procedures contain instructions that tell you how to do a task.
A. It is not recommended that we remove the damage prior to submitting information to Boeing,such as dents on metallic and composite structures,and delamination or punctures to composite structure.
B. If the removal of dents on metallic and composite structures,and delamination or punctures to composite structure is approved by SRM,CMM,or SB,it is preferable to remove the damage prior to submitting information to Boeing.
C. It is recommended that we remove the damage prior to submitting information to Boeing,such as dents on metallic and composite structures,and delamination orpunctures to composite structure.
D. C.It is recommended that we remove the damage prior to submitting information to Boeing,such as dents on metallic and composite structures,and delamination orpunctures to composite structure.
A. Make sure that the quality of fuel in the reservoir is not more than 500 liters.
B. Make sure that the quantity of fuel in the tank is not more than 500 liters.
C. Make sure that the quality of oil in the tank is not more than 500 liters.
A. It is the responsibility of the operator to ensure that alternative tools or equipment can work well and are dangerous to the parts and personnel as the ones specified in the procedure if you use them.
B. If alternative tools or equipment are used,the operator must ensure that they can play the same role and are as safe as the tools or equipment specified in the procedure to the parts and personnel.
C. If the manufacturer can make sure that alternative tools or equipment can meet the requirement and are as safe to the parts and equipment as the ones specified in the procedure,you can use them.
A. If your decision is not to change the unit,monitor its temperature at least 15 rotations.
B. If you decide not to renew the unit,supervise its temperature at least 15 periods.
C. If your decision is not to replace the unit,monitor its temperature for a minimum of 15 cycles.