APP下载
首页
>
财会金融
>
英语答案英语答案
搜索
英语答案英语答案
题目内容
(
单选题
)
305.The system to be tested operated abnormally during last flight leg.

A、 将要测试的这个系统在上个航段运转不正常。

B、 该系统要测试上一航段的不正常运行。

C、 在上一航段里该系统被测试为运行不正常。

答案:A

英语答案英语答案
2961.如需更改维修方案,应获得设计部门的批准。
https://www.shititong.cn/cha-kan/shiti/00059993-c629-5b9d-c057-47291d003a00.html
点击查看题目
2836.The engine compressor control system is used to both control the flow of air through the engine and facilitate the operation of variable stator blades,and is comprised of several components such as governors,valves,actuators,and linkages.
https://www.shititong.cn/cha-kan/shiti/00059993-c626-4d42-c057-47291d003a00.html
点击查看题目
2621.当你通过接近盖板接近后机身时。
https://www.shititong.cn/cha-kan/shiti/00059993-c624-783b-c057-47291d003a00.html
点击查看题目
1173.Clean the surface with a soap-and-water solution.
https://www.shititong.cn/cha-kan/shiti/00059993-c618-15c2-c057-47291d003a00.html
点击查看题目
2611.如果说明中有关于危险压力的警告,不要打开容器。
https://www.shititong.cn/cha-kan/shiti/00059993-c624-634f-c057-47291d003a00.html
点击查看题目
2182.Before disassembly,make sure that you release all the nitrogen pressure from the shock absorber.
https://www.shititong.cn/cha-kan/shiti/00059993-c620-ad9f-c057-47291d003a00.html
点击查看题目
2975.如需变更维修方案,须经设计部门批准。
https://www.shititong.cn/cha-kan/shiti/00059993-c629-7960-c057-47291d003a00.html
点击查看题目
2080.Put the adapter in position against its support.
https://www.shititong.cn/cha-kan/shiti/00059993-c61f-d3c8-c057-47291d003a00.html
点击查看题目
2626.作动筒与液压回油管路连通
https://www.shititong.cn/cha-kan/shiti/00059993-c624-81ed-c057-47291d003a00.html
点击查看题目
3252.当缩写词或符号作为计量单位时,将它和前面的数字计为一个单词。
https://www.shititong.cn/cha-kan/shiti/00059993-c62a-9684-c057-47291d003a00.html
点击查看题目
首页
>
财会金融
>
英语答案英语答案
题目内容
(
单选题
)
手机预览
英语答案英语答案

305.The system to be tested operated abnormally during last flight leg.

A、 将要测试的这个系统在上个航段运转不正常。

B、 该系统要测试上一航段的不正常运行。

C、 在上一航段里该系统被测试为运行不正常。

答案:A

分享
英语答案英语答案
相关题目
2961.如需更改维修方案,应获得设计部门的批准。

A. Get the approval of the design authority,whatever it is necessary to change the repair scheme.

B. Change the repair scheme,until getting the approval of the design authority.

C. If it is necessary to change the repair scheme,get the approval of the design authority.

https://www.shititong.cn/cha-kan/shiti/00059993-c629-5b9d-c057-47291d003a00.html
点击查看答案
2836.The engine compressor control system is used to both control the flow of air through the engine and facilitate the operation of variable stator blades,and is comprised of several components such as governors,valves,actuators,and linkages.

A. 发动机压缩机控制系统包括调速器、活门、作动器、杠杆等装置,可控制发动机里的空气流量和加速可变定子叶片的运行。

B. 发动机压气机控制系统可增加通过发动机的空气流量,部件包括调节器、活门、作动器、连杆等。

C. 发动机压气机控制系统能控制通过发动机的空气流量和可调静子叶片的操作。该系统包括调节器、活门、作动筒、连杆等部件。

D. C.发动机压气机控制系统能控制通过发动机的空气流量和可调静子叶片的操作。该系统包括调节器、活门、作动筒、连杆等部件。

https://www.shititong.cn/cha-kan/shiti/00059993-c626-4d42-c057-47291d003a00.html
点击查看答案
2621.当你通过接近盖板接近后机身时。

A. When you access to the rear fuselage through the access panel.

B. When you get to the aft aircraft body through the control panel.

C. As you reach to the aft part of the aircraft by the visit door.

https://www.shititong.cn/cha-kan/shiti/00059993-c624-783b-c057-47291d003a00.html
点击查看答案
1173.Clean the surface with a soap-and-water solution.

A. Clean the surface with a soap and clean a water solution.

B. Use a soap-and-water solution to clean the surface.

C. Use a soap to clean the surface and a water solution.

https://www.shititong.cn/cha-kan/shiti/00059993-c618-15c2-c057-47291d003a00.html
点击查看答案
2611.如果说明中有关于危险压力的警告,不要打开容器。

A. Do not open the container if you are instructed that high pressure is dangerous.

B. If it states on the container that the pressure inside is high,do not open it.

C. If the instructions give a warning about dangerous pressure,do not open the container.

https://www.shititong.cn/cha-kan/shiti/00059993-c624-634f-c057-47291d003a00.html
点击查看答案
2182.Before disassembly,make sure that you release all the nitrogen pressure from the shock absorber.

A. 装配之前,确保适当减少减震器里的压力。

B. 拆卸之前,确保释放减震器里的初始压力。

C. 分解之前,确保减震器里的所有氮气压力已释放。

https://www.shititong.cn/cha-kan/shiti/00059993-c620-ad9f-c057-47291d003a00.html
点击查看答案
2975.如需变更维修方案,须经设计部门批准。

A. If the repair scheme must be changed,the approval of the design authority is hardly got.

B. If the design authority need change the repair scheme,it can get the approval.

C. If it is necessary to change the repair scheme,get the approval of the design authority.

https://www.shititong.cn/cha-kan/shiti/00059993-c629-7960-c057-47291d003a00.html
点击查看答案
2080.Put the adapter in position against its support.

A. 将适配器及其支撑设备固定在位。

B. 将适配器靠在支柱上。

C. 将适配器与支柱接合在同一位置。

https://www.shititong.cn/cha-kan/shiti/00059993-c61f-d3c8-c057-47291d003a00.html
点击查看答案
2626.作动筒与液压回油管路连通

A. The operation rods are connected to the hydraulic feedback.

B. The operation barrels are connected to the hydraulic return.

C. The actuators are connected to the hydraulic return.

https://www.shititong.cn/cha-kan/shiti/00059993-c624-81ed-c057-47291d003a00.html
点击查看答案
3252.当缩写词或符号作为计量单位时,将它和前面的数字计为一个单词。

A. When a capital letter or a symbol is used for a unit of measurement,you should take it and the number before it as a word.

B. When used in measurement,the acronym or the symbol and the related number should be taken as a word.

C. When you write an abbreviation or a symbol for a unit of measurement,count it and the preceding number as one word.

https://www.shititong.cn/cha-kan/shiti/00059993-c62a-9684-c057-47291d003a00.html
点击查看答案
试题通小程序
试题通app下载