A、 综合模式接收机(MMR)将全部位置系统、时间和日期传送到正、副驾驶员时钟。
B、 多模式接收机(MMR)将全球定位系统时间和日期传送到正、副驾驶员时钟。
C、 多个模块接收机(MMR)发送卫星定位系统时间和日期传送到正、副驾驶员时钟。
答案:B
A、 综合模式接收机(MMR)将全部位置系统、时间和日期传送到正、副驾驶员时钟。
B、 多模式接收机(MMR)将全球定位系统时间和日期传送到正、副驾驶员时钟。
C、 多个模块接收机(MMR)发送卫星定位系统时间和日期传送到正、副驾驶员时钟。
答案:B
A. In such cases,the introduction should notice the systems related in the manual, manufacturers may also choose to group related systems where the simplicity of the product permits.
B. In such cases,the introduction should note the systems covered in the manual, manufacturers may also choose to group related systems where the simplicity of the product permits.
C. In such cases,the introduction should note the systems comprised in the manual, manufacturers may also choose to divide related systems if the product is simple enough.
A. 当释放液压时,活门按顺序打开。
B. 当液压被释放后,顺序活门移动到开位。
C. 当液压增压时,要按顺序移动来打开活门。
A. Use only the approved forms of verbs and adjectives.
B. Use only the permitted forms of verbs and adverbs.
C. Use only the applicable forms of adverbs and adjectives.
A. Most material of the radar scope is fiberglass.
B. Most of the material in the radome is fiberglass.
C. Most of the material in the radar cap is fiberglass.
A. 当结冰情况超过飞机及其防冰系统的认证能力时,此信息应结合其他信息一起用于判断结冰情况。
B. 这些信息应与其他信息同时显示,用于辅助判断结冰情况是否超出飞机及防冰系统的认证能力。
C. 应将此信息与帮助识别结冰情况的信息一起呈现,这种结冰情况可能超出飞机及其防冰系统的证实能力。
D. C.应将此信息与帮助识别结冰情况的信息一起呈现,这种结冰情况可能超出飞机及其防冰系统的证实能力。
A. Sudden changes in temperature can adjust the internal logic.
B. The internal logic adjusts to sudden changes in temperature.
C. The internal logic can be adjusted by sudden changes in temperature.
A. 描述飞机液压系统时,应描述主系统和辅助系统。
B. 描述飞机液压系统时,应描述主要系统和帮助系统。
C. 描述飞机液压系统时,应描述主要的辅助系统。
A. A hard landing may be the result of shock loading of the engine.
B. Shock loading of an engine may result in a heavy landing.
C. A heavy landing can cause shock loading of the engine.
A. 连接电源时,不要打开房间。
B. 连接电源时,不要打开房门。
C. 连接电源时,不要打开壳体。
A. Notes emphasize conditions such as operating procedures,inspection,repair or maintenance,etc.,which may be met as appropriate.
B. Notes emphasize the conditions of operation procedure,inspection,repair or maintenance,etc.,must be followed.
C. Conditions for operating procedures,inspection,repair or maintenance,etc.must be emphasized in the notes.