APP下载
首页
>
财会金融
>
英语答案英语答案
搜索
英语答案英语答案
题目内容
(
单选题
)
829.将其中一个空调组件电门置于“高流量”位。

A、 Set the air conditioning switch to the up position.

B、 Place an air conditioning switch above the normal position.

C、 Put one of the pack switches in the HIGH position.

答案:C

英语答案英语答案
364.If the failure occurs regularly,do a system test.
https://www.shititong.cn/cha-kan/shiti/00059993-c611-2409-c057-47291d003a00.html
点击查看题目
1962.Remove wing-fuselage attach fairings.
https://www.shititong.cn/cha-kan/shiti/00059993-c61e-debc-c057-47291d003a00.html
点击查看题目
2470.改变频率并记录结果。
https://www.shititong.cn/cha-kan/shiti/00059993-c623-059f-c057-47291d003a00.html
点击查看题目
1225.Continuing Airworthiness Program lnspections usually consist of two pages: one text page and one illustration page.
https://www.shititong.cn/cha-kan/shiti/00059993-c618-aaed-c057-47291d003a00.html
点击查看题目
2948.确保液压油箱内的液压油高于最低液面。
https://www.shititong.cn/cha-kan/shiti/00059993-c627-365a-c057-47291d003a00.html
点击查看题目
2100.A dedicated tool is necessary for the installation of the unit.
https://www.shititong.cn/cha-kan/shiti/00059993-c61f-fc5d-c057-47291d003a00.html
点击查看题目
605.Do not use verbs that are general and vague.
https://www.shititong.cn/cha-kan/shiti/00059993-c613-27f3-c057-47291d003a00.html
点击查看题目
2270.Revisions to a drawing are necessitated by changes in dimensions,design,or materials.When drawings contain such corrections,attention is directed to the changes by lettering or numbering them and listing those changes against the symbol in a revision block."
https://www.shititong.cn/cha-kan/shiti/00059993-c621-66d8-c057-47291d003a00.html
点击查看题目
33.The precision of this adjustment is important.
https://www.shititong.cn/cha-kan/shiti/00059993-c60e-478e-c057-47291d003a00.html
点击查看题目
285.If the test does not give satisfactory results,do the fault isolation procedure.
https://www.shititong.cn/cha-kan/shiti/00059993-c610-8113-c057-47291d003a00.html
点击查看题目
首页
>
财会金融
>
英语答案英语答案
题目内容
(
单选题
)
手机预览
英语答案英语答案

829.将其中一个空调组件电门置于“高流量”位。

A、 Set the air conditioning switch to the up position.

B、 Place an air conditioning switch above the normal position.

C、 Put one of the pack switches in the HIGH position.

答案:C

分享
英语答案英语答案
相关题目
364.If the failure occurs regularly,do a system test.

A. 如果故障频繁出现,进行系统测试。

B. 如果故障定期出现,进行系统测试。

C. 如果故障随机出现,进行操作测试。

https://www.shititong.cn/cha-kan/shiti/00059993-c611-2409-c057-47291d003a00.html
点击查看答案
1962.Remove wing-fuselage attach fairings.

A. 拆下机翼以及机身所有连接整流罩。

B. 拆下翼身整流罩。

C. 拆下机翼连接整流罩。

https://www.shititong.cn/cha-kan/shiti/00059993-c61e-debc-c057-47291d003a00.html
点击查看答案
2470.改变频率并记录结果。

A. Record the results if the frequency changes.

B. Alter the phase and record the results.

C. Change the frequency and record the results.

https://www.shititong.cn/cha-kan/shiti/00059993-c623-059f-c057-47291d003a00.html
点击查看答案
1225.Continuing Airworthiness Program lnspections usually consist of two pages: one text page and one illustration page.

A. 持续权威程序测试通常由两页组成:一个文本页和一个图解页。

B. 持续适航工作检查总是包含两页:一个文本页和一个描述页。

C. 持续适航程序检查通常包括两页:一个文本页和一个图解页。

https://www.shititong.cn/cha-kan/shiti/00059993-c618-aaed-c057-47291d003a00.html
点击查看答案
2948.确保液压油箱内的液压油高于最低液面。

A. Make sure that the oil in the hydraulic tank is above the minimum lever.

B. Make sure that the fluid in the hydraulic reservoir is above the minimum level.

C. Make sure that the fluid in the fuel reservoir is below the maximum level.

https://www.shititong.cn/cha-kan/shiti/00059993-c627-365a-c057-47291d003a00.html
点击查看答案
2100.A dedicated tool is necessary for the installation of the unit.

A. 维修这个组件需要校准过的工具。

B. 安装这个组件需要专用工具。

C. 组件的安装需要精确的工具。

https://www.shititong.cn/cha-kan/shiti/00059993-c61f-fc5d-c057-47291d003a00.html
点击查看答案
605.Do not use verbs that are general and vague.

A. 不要使用综合的和粗俗的词语。

B. 不要使用笼统和含义模糊的词语。

C. 不要使用简略和含义模糊的形容词。

https://www.shititong.cn/cha-kan/shiti/00059993-c613-27f3-c057-47291d003a00.html
点击查看答案
2270.Revisions to a drawing are necessitated by changes in dimensions,design,or materials.When drawings contain such corrections,attention is directed to the changes by lettering or numbering them and listing those changes against the symbol in a revision block."

A. 由于尺寸、设计或器材的变化,需要对绘图进行修改。当绘图上有这样的修改时,要注意对字母和数字进行的修改,并在修改栏的符号上列出这些修改。

B. 由于尺寸、设计或材料的变化,需要对图纸进行修改。当图纸上有这样的修改时,要注意用字母或编号标出这些修改,并在修改栏里对照符号列出这些修改。

C. 由于尺寸、设计或材料的变化,需要对图纸进行修改。当图纸上有这样的修改时,要注意对字母和数字进行的修改,并在修改栏的符号上列出这些修改。

D. C.由于尺寸、设计或材料的变化,需要对图纸进行修改。当图纸上有这样的修改时,要注意对字母和数字进行的修改,并在修改栏的符号上列出这些修改。

https://www.shititong.cn/cha-kan/shiti/00059993-c621-66d8-c057-47291d003a00.html
点击查看答案
33.The precision of this adjustment is important.

A. 这种调整的精度很重要。

B. 这种调整的范围很重要。

C. 这种测试的精度很重要。

https://www.shititong.cn/cha-kan/shiti/00059993-c60e-478e-c057-47291d003a00.html
点击查看答案
285.If the test does not give satisfactory results,do the fault isolation procedure.

A. 试验结果表明,需要实施故障识别程序。

B. 如果测试没有给出满意的结果,执行故障隔离程序。

C. 如果测试结果不满足,启动故障探测程序。

https://www.shititong.cn/cha-kan/shiti/00059993-c610-8113-c057-47291d003a00.html
点击查看答案
试题通小程序
试题通app下载