APP下载
首页
>
财会金融
>
英语答案英语答案
搜索
英语答案英语答案
题目内容
(
单选题
)
970.将电缆的张力调整到恰当的值。

A、 Adjust the tension in the wires to the correct value.

B、 Adjust the tension in the cables to the correct value.

C、 Adjust the torque in the cables to the correct value.

答案:B

英语答案英语答案
1892.An “emergency” however,almost always involves a failure that requires immediate and rapid response,such as a total powerplant failure,fire or smoke,or rapid cabin decompression.
https://www.shititong.cn/cha-kan/shiti/00059993-c61e-49ef-c057-47291d003a00.html
点击查看题目
3000.然而,制造商可能会省略不适用于该产品的系统/章,或者在可行的情况下合并系统/章。
https://www.shititong.cn/cha-kan/shiti/00059993-c627-cbff-c057-47291d003a00.html
点击查看题目
2058.Fuel leaks can decrease engine performance.
https://www.shititong.cn/cha-kan/shiti/00059993-c61f-a6cb-c057-47291d003a00.html
点击查看题目
479.Remove burrs with rotary file in accordance with standard practices and SRM.
https://www.shititong.cn/cha-kan/shiti/00059993-c612-1e69-c057-47291d003a00.html
点击查看题目
85.Turn the knob to make the display go out of view.
https://www.shititong.cn/cha-kan/shiti/00059993-c60e-d8da-c057-47291d003a00.html
点击查看题目
78.More than one person is necessary for this procedure.
https://www.shititong.cn/cha-kan/shiti/00059993-c60e-c985-c057-47291d003a00.html
点击查看题目
746.制造商可能会省略不适用于其产品的系统。
https://www.shititong.cn/cha-kan/shiti/00059993-c614-88c5-c057-47291d003a00.html
点击查看题目
1319.Do not use metallic objects which could nick or damage the uplock spring surface.
https://www.shititong.cn/cha-kan/shiti/00059993-c619-7e7b-c057-47291d003a00.html
点击查看题目
763.收到,可以推出飞机。
https://www.shititong.cn/cha-kan/shiti/00059993-c614-ae7f-c057-47291d003a00.html
点击查看题目
897.旋转门把手直到下面的门被抬起。
https://www.shititong.cn/cha-kan/shiti/00059993-c615-d18e-c057-47291d003a00.html
点击查看题目
首页
>
财会金融
>
英语答案英语答案
题目内容
(
单选题
)
手机预览
英语答案英语答案

970.将电缆的张力调整到恰当的值。

A、 Adjust the tension in the wires to the correct value.

B、 Adjust the tension in the cables to the correct value.

C、 Adjust the torque in the cables to the correct value.

答案:B

分享
英语答案英语答案
相关题目
1892.An “emergency” however,almost always involves a failure that requires immediate and rapid response,such as a total powerplant failure,fire or smoke,or rapid cabin decompression.

A. However,an “emergency” almost always entails a failure that requires to respond immediately and rapidly,for example,the situations that a total powerplant fails,the fire or smoke occurs,or the cabin are depressurized rapidly.

B. An “emergency” however,almost always causes a malfunction that requests immediate and rapid response,such as the whole powerplant failure,fire or smoke,or rapid cabin pressurization.

C. However,an “emergency” is often related to a failure that demands respond simultaneously,such as the complete failure of the powerplant,fire or smoke,or rapid cabin warming.

https://www.shititong.cn/cha-kan/shiti/00059993-c61e-49ef-c057-47291d003a00.html
点击查看答案
3000.然而,制造商可能会省略不适用于该产品的系统/章,或者在可行的情况下合并系统/章。

A. However,manufacturers may omit System/Chapters that are not applicable to the product or combine Systems/Chapters where it is feasible.

B. However,manufacturers may adopt Systems/Chapters that are not applicable to the product or constitute Systems/Chapters when necessary.

C. However,operators may omit Systems/Chapters applicable to the product or constitute Systems/Chapters where practical.

https://www.shititong.cn/cha-kan/shiti/00059993-c627-cbff-c057-47291d003a00.html
点击查看答案
2058.Fuel leaks can decrease engine performance.

A. 燃油泄漏会导致发动机受损。

B. 发动机性能与燃油泄漏无关。

C. 燃油渗漏会降低发动机性能。

https://www.shititong.cn/cha-kan/shiti/00059993-c61f-a6cb-c057-47291d003a00.html
点击查看答案
479.Remove burrs with rotary file in accordance with standard practices and SRM.

A. 根据标准施工手册及结构修理手册里文件的要求除去划痕。

B. 根据标准施工手册及结构修理手册的要求用轮挫磨去毛刺。

C. 根据标准施工手册及结构修理手册的程序除去杂质。

https://www.shititong.cn/cha-kan/shiti/00059993-c612-1e69-c057-47291d003a00.html
点击查看答案
85.Turn the knob to make the display go out of view.

A. 转动凸轮以使显示器松脱。

B. 转动旋钮使显示消失。

C. 转动把手以使显示器不再显示。

https://www.shititong.cn/cha-kan/shiti/00059993-c60e-d8da-c057-47291d003a00.html
点击查看答案
78.More than one person is necessary for this procedure.

A. 本程序中要求不止一个人。

B. 对于本程序来说,更多的人员要求是必要的。

C. 执行本程序需要超过一个人。

https://www.shititong.cn/cha-kan/shiti/00059993-c60e-c985-c057-47291d003a00.html
点击查看答案
746.制造商可能会省略不适用于其产品的系统。

A. Manufacturers may optimize products that do not conform to their systems.

B. Manufacturers may omit systems not applicable to their product.

C. Manufacturers may object to products that are suitable for their systems.

https://www.shititong.cn/cha-kan/shiti/00059993-c614-88c5-c057-47291d003a00.html
点击查看答案
1319.Do not use metallic objects which could nick or damage the uplock spring surface.

A. 不要使用金属制品,可能会割到或损坏上位锁弹簧表面。

B. 不要使用金属物件,可能会割到或损坏上位锁弹簧表面。

C. 不要使用金属制品,可能会划伤或损坏上位锁弹簧表面。

https://www.shititong.cn/cha-kan/shiti/00059993-c619-7e7b-c057-47291d003a00.html
点击查看答案
763.收到,可以推出飞机。

A. Roger that,clear for dispatch.

B. Copy that,clear for pressing.

C. Roger,clear for pushback.

https://www.shititong.cn/cha-kan/shiti/00059993-c614-ae7f-c057-47291d003a00.html
点击查看答案
897.旋转门把手直到下面的门被抬起。

A. Turn the handle of the door until the lower gate is lifted.

B. For lowering the upper door,door handle should be turned.

C. The lever of door should be turned until the lower door opens.

https://www.shititong.cn/cha-kan/shiti/00059993-c615-d18e-c057-47291d003a00.html
点击查看答案
试题通小程序
试题通app下载