APP下载
首页
>
财会金融
>
英语答案英语答案
搜索
英语答案英语答案
题目内容
(
单选题
)
1384.Operation time must be 28 to 40 seconds in either direction and operation current must not exceed 0.5 A.

A、 作动时间必须在 28 至 40 秒之间,在某个方向作动电流不得超过 0.5 安培。

B、 指令要求作动时间必须在 28 至 40 秒之间,且作动电流不得少于 0.5 安培。

C、 在任何一个方向上作动的时间必须在 28 至 40 秒之间,且作动电流不得超过 0.5 安培。

答案:C

英语答案英语答案
1214.The flap angles are specified in Table 1.
https://www.shititong.cn/cha-kan/shiti/00059993-c618-9301-c057-47291d003a00.html
点击查看题目
191.Basically,writers can use the approved words in the dictionary as a core vocabulary.
https://www.shititong.cn/cha-kan/shiti/00059993-c60f-b962-c057-47291d003a00.html
点击查看题目
2720.雷达罩的状况对其性能有着重要的影响。
https://www.shititong.cn/cha-kan/shiti/00059993-c625-4651-c057-47291d003a00.html
点击查看题目
2970.当输入杆在 5 毫米到 10 毫米之间时,测量活塞的伸长。
https://www.shititong.cn/cha-kan/shiti/00059993-c629-6f01-c057-47291d003a00.html
点击查看题目
2300.A wire code consists of a circuit function code,wire number,wire segment letter and wire size.Frequently a suffix indicating ground ( N ) ,phase (A,B,etc.) or thermocouple material (alumel,etc.) is added.
https://www.shititong.cn/cha-kan/shiti/00059993-c621-a4f0-c057-47291d003a00.html
点击查看题目
115.Put the end of rod that has a thread in the fitting.
https://www.shititong.cn/cha-kan/shiti/00059993-c60f-1c7f-c057-47291d003a00.html
点击查看题目
1213.Calculate the quantity of fuel necessary for the flight.
https://www.shititong.cn/cha-kan/shiti/00059993-c618-90d9-c057-47291d003a00.html
点击查看题目
795.操作标牌应列出清单或配图解说明。
https://www.shititong.cn/cha-kan/shiti/00059993-c614-f698-c057-47291d003a00.html
点击查看题目
26.The abnormalities to be included in this section shall be determined by the handbook producer.
https://www.shititong.cn/cha-kan/shiti/00059993-c610-d465-c057-47291d003a00.html
点击查看题目
1035.These tests shall be self-contained.
https://www.shititong.cn/cha-kan/shiti/00059993-c616-f2c9-c057-47291d003a00.html
点击查看题目
首页
>
财会金融
>
英语答案英语答案
题目内容
(
单选题
)
手机预览
英语答案英语答案

1384.Operation time must be 28 to 40 seconds in either direction and operation current must not exceed 0.5 A.

A、 作动时间必须在 28 至 40 秒之间,在某个方向作动电流不得超过 0.5 安培。

B、 指令要求作动时间必须在 28 至 40 秒之间,且作动电流不得少于 0.5 安培。

C、 在任何一个方向上作动的时间必须在 28 至 40 秒之间,且作动电流不得超过 0.5 安培。

答案:C

分享
英语答案英语答案
相关题目
1214.The flap angles are specified in Table 1.

A. The flap angles can not be found in Table 1.

B. The flap angles are stated in Table 1.

C. In Table 1,there are no flap angles.

https://www.shititong.cn/cha-kan/shiti/00059993-c618-9301-c057-47291d003a00.html
点击查看答案
191.Basically,writers can use the approved words in the dictionary as a core vocabulary.

A. 基本上,作者可以使用字典中已批准的词汇作为核心词。

B. 在主要部分中,作者可以使用字典中已认可的词汇作为核心词。

C. 在基础部分中,作者可以使用字典中已核实过的词汇作为核心词。

https://www.shititong.cn/cha-kan/shiti/00059993-c60f-b962-c057-47291d003a00.html
点击查看答案
2720.雷达罩的状况对其性能有着重要的影响。

A. The condition of the radome is very important for its performance.

B. The condition of the antenna influences its properties greatly.

C. The condition of the radar has an important effect on its characteristics.

https://www.shititong.cn/cha-kan/shiti/00059993-c625-4651-c057-47291d003a00.html
点击查看答案
2970.当输入杆在 5 毫米到 10 毫米之间时,测量活塞的伸长。

A. When the movement of input rod is ranged from 5 to 10 mm,measure the piston retraction.

B. When the input lever is between 5 and 10 mm,measure the piston extension.

C. When the interval of input shaft changes between 5 and 10 mm,measure the expansion of the piston.

https://www.shititong.cn/cha-kan/shiti/00059993-c629-6f01-c057-47291d003a00.html
点击查看答案
2300.A wire code consists of a circuit function code,wire number,wire segment letter and wire size.Frequently a suffix indicating ground ( N ) ,phase (A,B,etc.) or thermocouple material (alumel,etc.) is added.

A. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示地线(N)、相位(A、B 等)或热电偶材料(铝镁合金等)。

B. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示接地(N)、阶段(A、B 等)或热敏电门材料(铝镁合金等)。

C. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示地线(N)、相位(A、B 等)或热敏电门材料(铝镁合金等)。

https://www.shititong.cn/cha-kan/shiti/00059993-c621-a4f0-c057-47291d003a00.html
点击查看答案
115.Put the end of rod that has a thread in the fitting.

A. 将螺纹杆放入接头中

B. 将杆的一端缠上线放入接头中

C. 将杆的螺纹端放入接头中

https://www.shititong.cn/cha-kan/shiti/00059993-c60f-1c7f-c057-47291d003a00.html
点击查看答案
1213.Calculate the quantity of fuel necessary for the flight.

A. Estimate the quality of fuel used for the flight.

B. Compute the quantity of fuel required for the flight.

C. Evaluate the quantity of fuel in the flight.

https://www.shititong.cn/cha-kan/shiti/00059993-c618-90d9-c057-47291d003a00.html
点击查看答案
795.操作标牌应列出清单或配图解说明。

A. Operational Tags need to be listed or made a legend.

B. Operating Placards shall be listed or illustrated.

C. Operation Instructions have to be listed or mapped out.

https://www.shititong.cn/cha-kan/shiti/00059993-c614-f698-c057-47291d003a00.html
点击查看答案
26.The abnormalities to be included in this section shall be determined by the handbook producer.

A. 本节中包含的异常应由手册编写者确定。

B. 手册的起草者可以将异常情况编入此章节。

C. 手册的生产商可以根据异常情况决定是否将其编入此章节。

https://www.shititong.cn/cha-kan/shiti/00059993-c610-d465-c057-47291d003a00.html
点击查看答案
1035.These tests shall be self-contained.

A. These tests shall be independent.

B. These tests shall be self-locking.

C. These tests shall be comprehensive.

https://www.shititong.cn/cha-kan/shiti/00059993-c616-f2c9-c057-47291d003a00.html
点击查看答案
试题通小程序
试题通app下载