APP下载
首页
>
财会金融
>
英语答案英语答案
搜索
英语答案英语答案
题目内容
(
单选题
)
1829.经 FAA 批准的“适航限制”应作为单独文件,除需包含在《维护手册》中外,还需纳入《飞行员操作手册》的“限制部分”中。

A、 The FAA-Approved Airworthiness Limitations shall be prepared as a separate document for inclusion in the Maintenance Manual and for insertion in the “Limitations Section” of the Pilot's Operating Handbook.

B、 FAA-approved Airworthiness Restrictions should be prepared as a separate document and included in the “Restrictions Section” of the Maintenance Manual and the Pilot’s Operating Manual.

C、 The airworthiness restrictions approved by FAA should be prepared as separate documents and included in the "Limitations" section of the Maintenance Manual and the "Pilot Operations Manual".

答案:A

英语答案英语答案
1887.Differences in the fuel/water sample and the ability of the detection kits to consistently measure the level of microbial growth make it important to retest and verify test results.
https://www.shititong.cn/cha-kan/shiti/00059993-c61e-4006-c057-47291d003a00.html
点击查看题目
280.Carefully remove the trim cover from the adhesive tape.
https://www.shititong.cn/cha-kan/shiti/00059993-c610-7614-c057-47291d003a00.html
点击查看题目
896.安全程序由制造商提供。
https://www.shititong.cn/cha-kan/shiti/00059993-c615-cf20-c057-47291d003a00.html
点击查看题目
32 章展示。
https://www.shititong.cn/cha-kan/shiti/00059993-c61a-22b8-c057-47291d003a00.html
点击查看题目
1104.Ground service bus has no power with external power available.
https://www.shititong.cn/cha-kan/shiti/00059993-c617-83f1-c057-47291d003a00.html
点击查看题目
338.The laptop has these primary parts:
https://www.shititong.cn/cha-kan/shiti/00059993-c610-ec6f-c057-47291d003a00.html
点击查看题目
1639.Micro-switches in the actuator de-energize it at the end of travel.
https://www.shititong.cn/cha-kan/shiti/00059993-c61c-2803-c057-47291d003a00.html
点击查看题目
519.The number 4 bearing holds the rear of the N2 shaft.
https://www.shititong.cn/cha-kan/shiti/00059993-c612-6f2c-c057-47291d003a00.html
点击查看题目
2869.最大着陆重量是着陆触地所批准的最大重量。
https://www.shititong.cn/cha-kan/shiti/00059993-c628-9813-c057-47291d003a00.html
点击查看题目
3040.螺旋桨的大修必须在一个合格的车间按照螺旋桨制造商提供的资料来完成。
https://www.shititong.cn/cha-kan/shiti/00059993-c628-2191-c057-47291d003a00.html
点击查看题目
首页
>
财会金融
>
英语答案英语答案
题目内容
(
单选题
)
手机预览
英语答案英语答案

1829.经 FAA 批准的“适航限制”应作为单独文件,除需包含在《维护手册》中外,还需纳入《飞行员操作手册》的“限制部分”中。

A、 The FAA-Approved Airworthiness Limitations shall be prepared as a separate document for inclusion in the Maintenance Manual and for insertion in the “Limitations Section” of the Pilot's Operating Handbook.

B、 FAA-approved Airworthiness Restrictions should be prepared as a separate document and included in the “Restrictions Section” of the Maintenance Manual and the Pilot’s Operating Manual.

C、 The airworthiness restrictions approved by FAA should be prepared as separate documents and included in the "Limitations" section of the Maintenance Manual and the "Pilot Operations Manual".

答案:A

分享
英语答案英语答案
相关题目
1887.Differences in the fuel/water sample and the ability of the detection kits to consistently measure the level of microbial growth make it important to retest and verify test results.

A. Retesting and reviewing test results are optional due to discrepancies in the fuel/water sample and the ability of the detection kits to continuously measure the level of microbial growth.

B. It is very important to do the test again and confirm test results because of differences in the fuel/water sample and the ability of the detection kits to continuously measure the level ofmicrobial growth.

C. It is mandatory to retest and evaluate test results to make sure the differences in the fuel/water sample and the ability of the detection kits to witness the level of microbial growth.

D. C.It is mandatory to retest and evaluate test results to make sure the differences in the fuel/water sample and the ability of the detection kits to witness the level of microbial growth.

https://www.shititong.cn/cha-kan/shiti/00059993-c61e-4006-c057-47291d003a00.html
点击查看答案
280.Carefully remove the trim cover from the adhesive tape.

A. 小心地取出配平盖板内的备份磁带。

B. 小心地从胶带上拆除装饰盖。

C. 小心地移除调整片,用其他的带子盖上。

https://www.shititong.cn/cha-kan/shiti/00059993-c610-7614-c057-47291d003a00.html
点击查看答案
896.安全程序由制造商提供。

A. The safety procedures are supplied by the manufacturer.

B. Safety procedures are to be supplied to the manufacturer.

C. Safety procedures are provided for manufacturers to follow.

https://www.shititong.cn/cha-kan/shiti/00059993-c615-cf20-c057-47291d003a00.html
点击查看答案
32 章展示。
https://www.shititong.cn/cha-kan/shiti/00059993-c61a-22b8-c057-47291d003a00.html
点击查看答案
1104.Ground service bus has no power with external power available.

A. Ground service bus has no power,but the external power can be supplied.

B. Ground service bus is not energized with external power.

C. Ground service bus ispower off when external power is supplied.

https://www.shititong.cn/cha-kan/shiti/00059993-c617-83f1-c057-47291d003a00.html
点击查看答案
338.The laptop has these primary parts:

A. 笔记本电脑有以下主要部件

B. 笔记本电脑有以下初级部件

C. 笔记本电脑有以下仿制部件

https://www.shititong.cn/cha-kan/shiti/00059993-c610-ec6f-c057-47291d003a00.html
点击查看答案
1639.Micro-switches in the actuator de-energize it at the end of travel.

A. 到达行程末端后作动筒中的微小电门会衔接。

B. 在旅程结束后作动筒中的微小电门会断开。

C. 到达行程末端后作动筒中的微动电门断开。

https://www.shititong.cn/cha-kan/shiti/00059993-c61c-2803-c057-47291d003a00.html
点击查看答案
519.The number 4 bearing holds the rear of the N2 shaft.

A. 4 个轴承支撑 N2 轴的后部。

B. 第 4 号轴承支撑 N2 轴的后部。

C. 第 4 号轴承支持 N2 轴的前部。

https://www.shititong.cn/cha-kan/shiti/00059993-c612-6f2c-c057-47291d003a00.html
点击查看答案
2869.最大着陆重量是着陆触地所批准的最大重量。

A. Maximum Landing Weight is maximum weight supplied for the landing contact.

B. Minimum Landing Weight is minimum weight provided for the landing touchdown.

C. Maximum Landing Weight is maximum weight approved for the landing touchdown.

https://www.shititong.cn/cha-kan/shiti/00059993-c628-9813-c057-47291d003a00.html
点击查看答案
3040.螺旋桨的大修必须在一个合格的车间按照螺旋桨制造商提供的资料来完成。

A. Propellers must be overhauled in a satisfactory shop which should be supplied by the propeller manufacturer in accordance with data.

B. Overhaul of propellers and the shop must meet the data of the propeller manufacturer.

C. Overhaul of propellers must be accomplished in a qualified shop in accordance with data supplied by the propeller manufacturer.

https://www.shititong.cn/cha-kan/shiti/00059993-c628-2191-c057-47291d003a00.html
点击查看答案
试题通小程序
试题通app下载