APP下载
首页
>
财会金融
>
英语答案英语答案
搜索
英语答案英语答案
题目内容
(
单选题
)
2261.FAA should be contacted prior to any alterations on airplane to insure that airworthiness of the airplane is not violated.

A、 在飞机上进行任何修改之前应联系 FAA,以确保满足飞机的适航性。

B、 在飞机上进行任何改装之前应联系 FAA,以确保不会对飞机适航状态造成影响。

C、 指出在飞机上进行任何变更之前应联系 FAA,以确保满足飞机的适航性。

答案:B

英语答案英语答案
2916.移除螺钉、垫片和螺帽来断开链接到这个结构上的圆箍。
https://www.shititong.cn/cha-kan/shiti/00059993-c626-f320-c057-47291d003a00.html
点击查看题目
2561.将修理补片准确地贴在损坏的部位。
https://www.shititong.cn/cha-kan/shiti/00059993-c623-f787-c057-47291d003a00.html
点击查看题目
3047.松开减压器[7]上的转动螺母[10]和大气压力过滤器组件[1]两端的旁通阀[8]。
https://www.shititong.cn/cha-kan/shiti/00059993-c62a-0cfb-c057-47291d003a00.html
点击查看题目
2590.如果燃油样品中没有污染,则继续该程序。
https://www.shititong.cn/cha-kan/shiti/00059993-c624-368b-c057-47291d003a00.html
点击查看题目
2955.组件损坏严重,修理费用超过总价的 60%,车间建议报废。
https://www.shititong.cn/cha-kan/shiti/00059993-c629-4fe6-c057-47291d003a00.html
点击查看题目
2833.The engine power control system furnishes a means of controlling the main fuel control or coordinator,which includes controls to the propeller regulator on turbo-prop engines.
https://www.shititong.cn/cha-kan/shiti/00059993-c626-4771-c057-47291d003a00.html
点击查看题目
2105.Remove the detergent with a clean cotton wiper that is moist with water.
https://www.shititong.cn/cha-kan/shiti/00059993-c620-06e1-c057-47291d003a00.html
点击查看题目
972.给出继电器、二极管和系统其他部件的符号。
https://www.shititong.cn/cha-kan/shiti/00059993-c616-6d91-c057-47291d003a00.html
点击查看题目
810.遵守部件的拆卸程序。
https://www.shititong.cn/cha-kan/shiti/00059993-c615-16a8-c057-47291d003a00.html
点击查看题目
867.该规范给出了继电器、二极管和系统其他部件的符号。
https://www.shititong.cn/cha-kan/shiti/00059993-c615-91e0-c057-47291d003a00.html
点击查看题目
首页
>
财会金融
>
英语答案英语答案
题目内容
(
单选题
)
手机预览
英语答案英语答案

2261.FAA should be contacted prior to any alterations on airplane to insure that airworthiness of the airplane is not violated.

A、 在飞机上进行任何修改之前应联系 FAA,以确保满足飞机的适航性。

B、 在飞机上进行任何改装之前应联系 FAA,以确保不会对飞机适航状态造成影响。

C、 指出在飞机上进行任何变更之前应联系 FAA,以确保满足飞机的适航性。

答案:B

分享
英语答案英语答案
相关题目
2916.移除螺钉、垫片和螺帽来断开链接到这个结构上的圆箍。

A. Remove the bolt,washer,and nut to disconnect the bend clamp from the structure.

B. Remove the screw,washer,and nut to disconnect the short clamp from the structure.

C. Remove the screw,washer,and nut to disconnect the loop clamp from the structure.

https://www.shititong.cn/cha-kan/shiti/00059993-c626-f320-c057-47291d003a00.html
点击查看答案
2561.将修理补片准确地贴在损坏的部位。

A. Put the repair patch accurately on the damaged area.

B. Put the repair patch on the correct damaged area.

C. Correctly put the repair sealant on the damaged parts.

https://www.shititong.cn/cha-kan/shiti/00059993-c623-f787-c057-47291d003a00.html
点击查看答案
3047.松开减压器[7]上的转动螺母[10]和大气压力过滤器组件[1]两端的旁通阀[8]。

A. Loosen the cross nuts [10] on reducer [7] and standby valve [8] on each end of air pressure filter assembly [1].

B. Loosen the swivel nuts [10] on reducer [7] and bypass valve [8] on each end of air pressure filter assembly [1].

C. Loosen the cotter nuts [10] on reducer [7] and bypass valve [8] on each end of air pressure filter assembly [1].

https://www.shititong.cn/cha-kan/shiti/00059993-c62a-0cfb-c057-47291d003a00.html
点击查看答案
2590.如果燃油样品中没有污染,则继续该程序。

A. Obey the procedure if there is no debris in the oil sample.

B. If the fuel is not polluted,go on with the procedure.

C. If there is no contamination in the fuel sample,continue the procedure.

https://www.shititong.cn/cha-kan/shiti/00059993-c624-368b-c057-47291d003a00.html
点击查看答案
2955.组件损坏严重,修理费用超过总价的 60%,车间建议报废。

A. The component was damaged badly,the repairing cost is over 60% of the total price.The workshop suggests reporting as an unserviceable part.

B. The component was damaged heavily; the repairing cost is over 60% of the total price.The workshop suggests scrapping.

C. The component was destroyed heavily; the repairing cost is60% of the total price.The workshop suggests segregation.

https://www.shititong.cn/cha-kan/shiti/00059993-c629-4fe6-c057-47291d003a00.html
点击查看答案
2833.The engine power control system furnishes a means of controlling the main fuel control or coordinator,which includes controls to the propeller regulator on turbo-prop engines.

A. 发动机功率控制系统可以控制主燃油控制器或调节器,包括涡轮螺旋桨发动机上螺旋桨调速器的控制装置。

B. 发动机功率控制是控制主燃油控制器或协调器装置的系统部分,包括涡桨发动机螺旋桨调节器的控制装置。

C. 发动机功率控制系统提供了一种控制主燃油控制或协调器的方法,包括对涡桨发动机螺旋桨调节器的控制。

D. C.发动机功率控制系统提供了一种控制主燃油控制或协调器的方法,包括对涡桨发动机螺旋桨调节器的控制。

https://www.shititong.cn/cha-kan/shiti/00059993-c626-4771-c057-47291d003a00.html
点击查看答案
2105.Remove the detergent with a clean cotton wiper that is moist with water.

A. 用干净的棉布浸湿水后清除除污剂。

B. 用清水浸湿并清洗带有洗涤剂的干净棉布。

C. 用干净的棉布清除污渍,再用清水洗涤。

https://www.shititong.cn/cha-kan/shiti/00059993-c620-06e1-c057-47291d003a00.html
点击查看答案
972.给出继电器、二极管和系统其他部件的符号。

A. Gives the symbols for resistors,diodes,and other parts of the system.

B. Gives the symbols for relays,resistors,and other parts of the system.

C. Gives the symbols for relays,diodes,and other parts of the system.

https://www.shititong.cn/cha-kan/shiti/00059993-c616-6d91-c057-47291d003a00.html
点击查看答案
810.遵守部件的拆卸程序。

A. Obey the removal tasks for the components.

B. Follow the installation procedures for the components.

C. Obey the removal procedures for the components.

https://www.shititong.cn/cha-kan/shiti/00059993-c615-16a8-c057-47291d003a00.html
点击查看答案
867.该规范给出了继电器、二极管和系统其他部件的符号。

A. The specification gives the symbols for relays,diodes,and other parts of the system.

B. The specification gives the requirement for markings on relay,triode and other parts of the system.

C. The specification excludes symbols for relays,diodes,and other system parts.

https://www.shititong.cn/cha-kan/shiti/00059993-c615-91e0-c057-47291d003a00.html
点击查看答案
试题通小程序
试题通app下载