A、 NOTE: The manufacturer may have the option of including wiring schematic in Chapter 24,Chapter 91,or establish a separate Wiring Diagram Manual.
B、 NOTE: The manufacturer may have the option of including wiring schematic in Chapter 24,Chapter 91,or establish a separate Wiring Schematic Manual.
C、 NOTE: The manufacturer may have the option of including wiring diagrams in Chapter 24,Chapter 91,or establish a separate Wiring Diagram Manual.
答案:C
A、 NOTE: The manufacturer may have the option of including wiring schematic in Chapter 24,Chapter 91,or establish a separate Wiring Diagram Manual.
B、 NOTE: The manufacturer may have the option of including wiring schematic in Chapter 24,Chapter 91,or establish a separate Wiring Schematic Manual.
C、 NOTE: The manufacturer may have the option of including wiring diagrams in Chapter 24,Chapter 91,or establish a separate Wiring Diagram Manual.
答案:C
A. 在地面上的停放点贴上胶带。
B. 在地面上通过系留点贴上警示带。
C. 将绳索通过系留点连接到地面。
A. 有 24 片宽弦钛合金风扇叶片。
B. 有 24 片宽弦合金钢风扇叶片。
C. 有弦宽为 24 的钛合金风扇叶片。
A. 前、后货舱电子组件是相同的。
B. 前、后货舱电子组件是可识别的的。
C. 前、后客舱电子组件是可用的。
A. Use a simple verb to express the approved possibility if permitted.
B. If possible,use an approved simple verb to express.
C. If allowed,use a simple verb for approving.
A. 本规范第 0.9 部分要求的表格内容可以采用补充材料的日志(或清单)形式。
B. 本规范第 0.9 段要求的目录可以采用补充材料的日志(或清单)形式。
C. 本规范第 0.9 节要求,表格内容可以在补充材料的日志(或清单)中。
A. 如果这个部件应该纳入 CAP,那么使用最终数据做出判断。
B. 公司应利用现有数据判断该部件是否与 CAP 相关联。
C. 已用所得数据来确定是否应将该部件纳入 CAP。
A. 小心地把阀门组装在其位置上,并安装封圈和螺栓。
B. 小心地把阀门组件放置到位,并安装垫片和螺栓。
C. 小心地把组件阀门放置到位,并安装垫片和螺帽。
A. Examine the area that is around the drain holes for signs of corrosion.
B. Check the scavenge hole and areas around it for corrosion.
C. Make sure that there's no corrosion around the drain hole.
A. 拧紧螺栓时使用不同的措辞。
B. 使用不同的扳手拧紧螺栓。
C. 拧螺栓时使用不同的扭矩。
A. 本段还应说明,除已明确的检查项目外,适航指令可能要求执行其他检查项目。
B. 本段还应说明,除已完成的检查项目外,还应完成哪些适航指令可能要求执行的其他检查项目。
C. 本段还应说明其他适航指令要求执行的固定检查项目和其他检查项目。