APP下载
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
搜索
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
Do not disassemble or repair igniter plugs.

A、 不要组装或修理点火嘴。

B、 不要拆解或修理点火嘴。

C、 不要组装或更换点火嘴。

答案:B

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
列出每个故障的可能原因的第一步是显示系统的哪些部分可能出现故障。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-f715-c098-d34cb90f9100.html
点击查看题目
In order to achieve the objectives of this Specification (enhance safety, reduce efforts, minimize costs), each manufacturer is expected to reasonably adhere to the Specification content and arrangement.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-2c81-c098-d34cb90f9100.html
点击查看题目
Clean the inner surface of the container.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ed-cb8f-c098-d34cb90f9100.html
点击查看题目
Corrosion can have many causes.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32eb-22ae-c098-d34cb90f9100.html
点击查看题目
时钟通过CLOCK跳开关从28伏直流热电瓶汇流条中获取电源。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f3-bbd5-c098-d34cb90f9100.html
点击查看题目
修订日期应显示在每一修订页上。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3303-1514-c098-d34cb90f9100.html
点击查看题目
The recirculation system uses a fan to move air from the passenger compartment to the main distribution manifold. This system reduces the amount of air necessary for the packs to supply.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f8-3d25-c098-d34cb90f9100.html
点击查看题目
The installation changed the routing of the cable loom.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f5-26a8-c098-d34cb90f9100.html
点击查看题目
Disassemble this unit into two parts.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ec-44e3-c098-d34cb90f9100.html
点击查看题目
将修理补片准确地贴在损坏的部位。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-945c-c098-d34cb90f9100.html
点击查看题目
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
手机预览
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402

Do not disassemble or repair igniter plugs.

A、 不要组装或修理点火嘴。

B、 不要拆解或修理点火嘴。

C、 不要组装或更换点火嘴。

答案:B

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
相关题目
列出每个故障的可能原因的第一步是显示系统的哪些部分可能出现故障。

A. The first step in listing possible causes of each trouble is to show what sections of the system may be at fault.

B. Listing possible causes of each trouble is the first step to show what sections of the system may be failure.

C. The first step in listing which parts of the system are likely to fail is to show the possible causes of each failure.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-f715-c098-d34cb90f9100.html
点击查看答案
In order to achieve the objectives of this Specification (enhance safety, reduce efforts, minimize costs), each manufacturer is expected to reasonably adhere to the Specification content and arrangement.

A. Each manufacturer is expected to abide by the Specification content and arrangement without any deviation in order to reasonably achieve the objectives of this Specification (enhance safety, reduce efforts, minimize costs).

B. It is mandatory that each manufacturer adhere to the Specification content and arrangement to achieve the objectives of this Specification (enhance safety, reduce efforts, minimize costs).

C. Each manufacturer is expected to adhere to the Specification content and arrangement reasonably so as to enhance safety, reduce efforts, and minimize costs which are the objectives of this Specification.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-2c81-c098-d34cb90f9100.html
点击查看答案
Clean the inner surface of the container.

A. 清洁容器的内表面。

B. 清洁包括表面在内的容器。

C. 从里清洁容器表面。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ed-cb8f-c098-d34cb90f9100.html
点击查看答案
Corrosion can have many causes.

A. 防腐可能有很多原因。

B. 腐蚀可能有很多原因。

C. 腐蚀可能有很多防腐措施。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32eb-22ae-c098-d34cb90f9100.html
点击查看答案
时钟通过CLOCK跳开关从28伏直流热电瓶汇流条中获取电源。

A. The clocks get power from the 28v AC hot battery bus and via the CLOCK circuit breaker.

B. The clocks get power from the 28v dc hot battery bus through the CLOCK circuit breaker.

C. The clocks is through the CLOCK circuit breaker powered from the 28v dc hot battery bus.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f3-bbd5-c098-d34cb90f9100.html
点击查看答案
修订日期应显示在每一修订页上。

A. The data of the revision shall be shown on each printed page.

B. The date of the revision shall be shown on each revised page.

C. The time of the reserve shall be shown on each revised page.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3303-1514-c098-d34cb90f9100.html
点击查看答案
The recirculation system uses a fan to move air from the passenger compartment to the main distribution manifold. This system reduces the amount of air necessary for the packs to supply.

A. 循环系统使用一个风扇使空气进入客舱支配总管。这个系统降低了空调组件的供气量。

B. 回流系统使用一个风扇使客舱空气进入混合总管。这个系统减少所需供气空调组件的数量。

C. 再循环系统使用一个风扇使客舱空气进入分配总管。这个系统减少空调组件所需供气量。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f8-3d25-c098-d34cb90f9100.html
点击查看答案
The installation changed the routing of the cable loom.

A. The routing of the cable loom may have been altered by the installation.

B. The routing of the cable loom may have been held by the installation.

C. The routing of the cable loom may have been defended by the installation.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f5-26a8-c098-d34cb90f9100.html
点击查看答案
Disassemble this unit into two parts.

A. 将这个单元拆分为两部分。

B. 将这个单元重组成两部分。

C. 将这个部分拆分为两单元。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ec-44e3-c098-d34cb90f9100.html
点击查看答案
将修理补片准确地贴在损坏的部位。

A. Put the repair patch accurately on the damaged area.

B. Put the repair patch on the correct damaged area.

C. Correctly put the repair sealant on the damaged parts.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-945c-c098-d34cb90f9100.html
点击查看答案
试题通小程序
试题通app下载