A、 Make sure that the warranty life of the material is not expanded.
B、 Make sure that the retirement period of the material is not exceeded.
C、 Make sure that the shelf life of the material is not expired.
答案:C
A、 Make sure that the warranty life of the material is not expanded.
B、 Make sure that the retirement period of the material is not exceeded.
C、 Make sure that the shelf life of the material is not expired.
答案:C
A. 将P5-5板上的备用电源电门设置到关位。
B. 将备用电源开关安装到P5-5板上并设置到关位。
C. 将P5-5板上的气动电源电门设置到关位。
A. The primary cause of valve failure is contamination of the hydraulic fluid.
B. The primary cause of valve failure is poisonousness of the hydraulic fluid.
C. The primary element of valve failure is contamination of the hydraulic fluid.
A. Obey the procedure if there is no debris in the oil sample.
B. If the fuel is not polluted, go on with the procedure.
C. If there is no contamination in the fuel sample, continue the procedure.
A. Many readers have little knowledge of English. Complex sentence structure and the large number of meanings and antonyms that many English words have can cause misconception.
B. Many readers have a limited knowledge of English. Complex sentence structure and the large number of meanings and synonyms that many English words have can cause confusion.
C. Many readers have a little knowledge of English. Complex sentence structure and the large number of meanings and homonyms that many English words have can cause frustration.
A. Do not extend or retract landing gear above this speed.
B. Do not lower or retract landing gear exceed this speed.
C. Do not lower or lift landing gear within this speed.
A. Upon designed and approved, a complete maintenance procedures must be established. This procedure must provide in clear, easy language to people who need it.
B. Upon design and approval, the establishment of complex maintenance procedures is a must. This procedure must provide a clear, precise language to those who need it.
C. Once designed and approved, the establishment of thorough maintenance procedures is a must. This procedure must be available in clear, concise language to those who need it.
A. 螺柱的凹陷不得超过5mm。
B. 螺柱的突起不得超过5mm。
C. 螺纹的长度不得超过5mm。
A. That portion of the system is used to perform the cranking portion of the starting operation.
B. That portion of the system is used to perform the igniting portion of the starting operation.
C. That portion of the system is used to perform the cranking portion of the igniting operation.
A. 在航空器交付时或在签发第一份标准适航证时提供给买方的维修手册和/或维修数据,应包括足够的信息,使合格的机械师能够酌情检查、排除故障、测试、维修或更换制造商认为可维修或可更换的所有系统和组件,以此作为正常维修程序的一部分。
B. 在交付航空器时或在局方颁发标准适航证时,制造商向客户提供的维修手册和/或维修资料应包含足够的信息,以便合格的机械师在正常维护过程中能够检查、排除故障、测试、修理或更换所有可修理或可更换的系统和组件。
C. 在航空器交付时或在签发第一份标准适航证时提供给买方的维修手册和/或维修数据应提供足够的信息,使合格的机械师能够酌情检查、排除故障、测试、维修或更换制造商认为可作为正常维修程序一部分的所有系统和组件。
A. The portion of the system is used to eliminate or prevent the formation of ice on all airfoil surfaces, including wings and airfoil sections of the empennage.
B. The portion of the system is used to dispel or get rid of ice gathering on some aircraft surfaces, including wings and empennage surfaces.
C. The portion of the system is used to eliminate or forbid ice forming on outside parts of all airfoils, including the airfoils of wings and empennage.