A、 Install a new gasket on the flange.
B、 Install a new washer on the fixture.
C、 Install a new basket on the fitting.
答案:A
A、 Install a new gasket on the flange.
B、 Install a new washer on the fixture.
C、 Install a new basket on the fitting.
答案:A
A. 风扇为带有整体式感应电动机的单级风扇,每个风扇各有一个单向活门并作为一个组件安装。
B. 风扇作为单级风扇和整体电动机各有一个单向活门并作为一个组件安装。
C. 风扇是单级风扇,整体传动电动机,电机各自有一个单向活门并作为一个组件安装。
A. 确保静压管没有堵塞。
B. 确保皮托管没有堵塞。
C. 确保排气管没有渗漏。
A. This section includes limitations adapted by the airworthiness authority.
B. The limitations included in this Section are approved by the airworthinessauthority.
C. The limitations included in this Section are adopted by the airworthiness authority.
A. If there are metal fragments in the liquid sample, replace the pump.
B. If there are only small metal particles in the solid sample, replace the pump.
C. If there are metal particles in the sample solids, replace the pump.
A. After 10 flight cycles or 25 flight hours, which comes first, the rod end bearing shall be discarded if its wear is greater than 0.010 inch of diameter.
B. If the rod end bearing wear is greater than 0.010 inch in radial play, reject it within next 10 flight cycles or 25 flight hours whichever comes first.
C. Destroy the rod end bearing during 10 flight cycles or 25 flight hours when its wear is more than 0.010 inch of its radius, whichever comes first.
A. Clean the surface to make sure that the sealing is satisfactory.
B. Clean surfaces to ensure the bonding as required.
C. Clean the surface to make sure that the bond is satisfactory.
A. Cut the shim to the correct size.
B. Trim the washer to the correct size.
C. Cut the patch to the correct dimension.
A. Any anomaly should be reported to ABC, through the Condition Reporting System, so that additions and/or revisions can be made to the CAP where deemed necessary.
B. Report any abnormality to ABC by the Condition Reporting System to verify supplement and/or revisions needed as necessary to the CAP.
C. ABC shall receive the anomalies report from the Condition Reporting System for CAP to add and/or revise as necessary.
A. 机身上固定位置安装的门,包括结构件、闩锁机构、把手、衬板等。
B. 在机身内的固定分隔板上装置的门。包括结构件、锁紧机构、手柄、内衬等物品。
C. 安装在机身内固定隔板上的门。包括结构件、抛锁机构、把手、内衬等组成部分。
A. Make sure you press the switch when you hear the boarding music.
B. Make sure you press the switch after you hear the boarding music.
C. Make sure that you hear the boarding music after you push the button.