APP下载
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
搜索
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
If the drain hole is clogged, clean it.

A、 If the drain hole is blocked, clean it.

B、 If the drain hole is leaked, clean it.

C、 If the drain hole is locked, clean it.

答案:A

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
Manually override the start sequence.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ee-102e-c098-d34cb90f9100.html
点击查看题目
如果故障频繁发生,则进行系统测试。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f2-42f4-c098-d34cb90f9100.html
点击查看题目
如需更改维修方案,应获得设计部门的批准。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3303-d1fd-c098-d34cb90f9100.html
点击查看题目
通过持续适航的过程, 几乎组成飞机的每个部件都会涉及某种形式的保存,检查,预防性维修,翻修,修理或者更换件活动。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-5a56-c098-d34cb90f9100.html
点击查看题目
控制杆的向前移动必须是缓慢而连续的。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-cf90-c098-d34cb90f9100.html
点击查看题目
当安装分配器时,不要移动计时器。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-88bf-c098-d34cb90f9100.html
点击查看题目
Make a selection from the available shims to get the correct thickness.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fd-7cb2-c098-d34cb90f9100.html
点击查看题目
Remove the rigging pins and equipment that prevent free movement of the control surfaces.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f5-815a-c098-d34cb90f9100.html
点击查看题目
Remove the test cap on the control pressure sense line from the Precooler Control Valve to the 3908 sensor and make sure air flows out of the test port.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-211a-c098-d34cb90f9100.html
点击查看题目
Make sure that the airflow is not more than 10 liters/minute.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fc-8034-c098-d34cb90f9100.html
点击查看题目
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
手机预览
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402

If the drain hole is clogged, clean it.

A、 If the drain hole is blocked, clean it.

B、 If the drain hole is leaked, clean it.

C、 If the drain hole is locked, clean it.

答案:A

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
相关题目
Manually override the start sequence.

A. 人工超控起动顺序。

B. 按手册重写起动顺序。

C. 手动覆盖起动序列。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ee-102e-c098-d34cb90f9100.html
点击查看答案
如果故障频繁发生,则进行系统测试。

A. If the failure takes place occasionally, the system need to be tested.

B. If there is a failure that seldom take place, do a system test.

C. If the failure occurs frequently, do a system test.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f2-42f4-c098-d34cb90f9100.html
点击查看答案
如需更改维修方案,应获得设计部门的批准。

A. Get the approval of the design authority,whatever it is necessary to change the repair scheme.

B. Change the repair scheme, until getting the approval of the design authority.

C. If it is necessary to change the repair scheme, get the approval of the design authority.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3303-d1fd-c098-d34cb90f9100.html
点击查看答案
通过持续适航的过程, 几乎组成飞机的每个部件都会涉及某种形式的保存,检查,预防性维修,翻修,修理或者更换件活动。

A. After a continued airworthiness process,almost every component composed of an airplane is involved in some form of preservation,inspection,preventative maintenance, overhaul,repair, and/or replacement activity.

B. Through a continuing airworthiness process, virtually every component comprising an airplane is involved in some form of preservation,inspection,preventative maintenance,overhaul, repair, and/or replacement activity.

C. Through a continuing airworthiness process, substantially every component of an airplane is excluded in some type of preservation,inspection,preventative maintenance, overhaul,repair, and/or replacement activity.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-5a56-c098-d34cb90f9100.html
点击查看答案
控制杆的向前移动必须是缓慢而连续的。

A. The forward movement of the control lever must be slow and continuous.

B. The control lever must be kept moving forward slowly and abruptly.

C. You must continuously slow down the forward movement of the control lever .

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-cf90-c098-d34cb90f9100.html
点击查看答案
当安装分配器时,不要移动计时器。

A. When installing the distributor, refrain from changing the timing.

B. Ensure that you do not adjust the timing to install the distributor.

C. Do not move the timing when you install the distributor.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-88bf-c098-d34cb90f9100.html
点击查看答案
Make a selection from the available shims to get the correct thickness.

A. 选择适用的垫圈,确定恰当的尺寸。

B. 挑选适用的调整片以确保厚度合适。

C. 从可用的垫片中进行选择,以获得正确的厚度。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fd-7cb2-c098-d34cb90f9100.html
点击查看答案
Remove the rigging pins and equipment that prevent free movement of the control surfaces.

A. 拆除校装销和设备,以阻止控制舵面的自由运动。

B. 拆除校装销,安装能够阻止控制舵面自由移动的设备。

C. 拆除能够阻止控制舵面自由移动的校装销和设备。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f5-815a-c098-d34cb90f9100.html
点击查看答案
Remove the test cap on the control pressure sense line from the Precooler Control Valve to the 3908 sensor and make sure air flows out of the test port.

A. Remove the test cap between the Precooler Control Valve and the 3908 sensor on the control pressure sense line and ensure that there is air flowing out of the port.

B. From precooler control valve to 3908 sensor, remove the sense line test cap, make certain that the air flows from the test hub.

C. The purpose of the test cap removal from the Precooler Control Valve to the 3908 sensor is to guarantee that there is airflow at the test port.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-211a-c098-d34cb90f9100.html
点击查看答案
Make sure that the airflow is not more than 10 liters/minute.

A. 确保气流不低于10升/分钟。

B. 确保空气流量为10升/分钟。

C. 确保气流不超过10升/分钟。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fc-8034-c098-d34cb90f9100.html
点击查看答案
试题通小程序
试题通app下载