APP下载
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
搜索
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
Try to confirm the effective date and revision number and date if applicable.

A、 必须找到生效日期、修订号和修订日期(如申请)。

B、 必须记录生效日期、生产号和修订日期(如适用)

C、 尝试确认生效日期、修订号和修订日期(如适用)。

答案:C

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
When the autopilot disengages, an aural warning is heard from the aural warning module.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f7-c619-c098-d34cb90f9100.html
点击查看题目
The section 12-10 of AMM describes replenishing. It provides instructions necessary for the replenishment of fuel , oil , hydraulic fluid , water, other fluids , tire pressure, etc…
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-c891-c098-d34cb90f9100.html
点击查看题目
This specification was developed by representatives of member companies of the General Aviation Manufacturers Association for use in preparing Manufacturers Maintenance Data, in manual form, that will serve as a guide for the maintenance of airplanes in a continuous airworthy condition.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f9-06a1-c098-d34cb90f9100.html
点击查看题目
This data sheet prescribes conditions and limitations under which the product for which the type certificate was issued meets the airworthiness requirements.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-1d49-c098-d34cb90f9100.html
点击查看题目
初始表面涂饰和新表面涂饰之间不应有视觉差异。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fd-0ee4-c098-d34cb90f9100.html
点击查看题目
Depressurize the reservoir with the manual bleed valve on the reservoir pressurization module.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f0-1f8d-c098-d34cb90f9100.html
点击查看题目
The adjustment/test description shall provide instructions for accomplishment of a test or check to assure the integrity as an operational component of a system, subsystem or unit assembly. Such tests or checks will vary in complexity and stringency according to the conditions under which the unit functions. It is not intended that a complex functional test of a complete system and its attendant closer tolerances be performed if the unit replaced reactiviates the system and operates within the confines of a go-no-go specification .
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3302-7cbe-c098-d34cb90f9100.html
点击查看题目
Probe the tube to find the blockage.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ef-350e-c098-d34cb90f9100.html
点击查看题目
A wire code consists of a circuit function code, wire number, wire segment letter and wire size.Frequently a suffix indicating ground ( N ) , phase (A, B, etc.) or thermocouple material(alumel, etc. ) is added.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fe-4b5d-c098-d34cb90f9100.html
点击查看题目
Definitions should be worded as simply as possible and must conform with the use of the defined terms in the Handbook.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f9-d72c-c098-d34cb90f9100.html
点击查看题目
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
手机预览
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402

Try to confirm the effective date and revision number and date if applicable.

A、 必须找到生效日期、修订号和修订日期(如申请)。

B、 必须记录生效日期、生产号和修订日期(如适用)

C、 尝试确认生效日期、修订号和修订日期(如适用)。

答案:C

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
相关题目
When the autopilot disengages, an aural warning is heard from the aural warning module.

A. 当自动驾驶连接时,能从口语警告模块听到口头警告。

B. 当自动飞行断开时,能从口语警告模块听到口头警告。

C. 当自动飞行断开时,能从听觉警告模块听到听觉警告。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f7-c619-c098-d34cb90f9100.html
点击查看答案
The section 12-10 of AMM describes replenishing. It provides instructions necessary for the replenishment of fuel , oil , hydraulic fluid , water, other fluids , tire pressure, etc…

A. AMM 的第 12章第10节是关于补给的。它提供了添加燃油、滑油、液压油、水、其他液体和轮胎充气等所需的说明。

B. AMM 的第 12章第10节是关于补液的。它提供了补给燃油、滑油、液压油、水、其他液体和轮胎压力等所需的说明。

C. AMM 的第 12章第10节是关于补液的。它提供了补给液压油、滑油、燃油、水、其他液体和轮胎压力等所需的说明。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-c891-c098-d34cb90f9100.html
点击查看答案
This specification was developed by representatives of member companies of the General Aviation Manufacturers Association for use in preparing Manufacturers Maintenance Data, in manual form, that will serve as a guide for the maintenance of airplanes in a continuous airworthy condition.

A. 本规范由通用航空制造商协会的成员公司代表制定,用于编制制造商维修数据,以手册的形式,作为飞机持续适航状态下的维修指南。

B. 本规范由通用航空制造商协会的成员代表撰写而成,旨在指导制造商编写用于飞机持续适航维护的《制造商维护资料 》手册。

C. 本规范由通用航空制造商协会的成员公司代表制定,用于以手册的形式,编制《制造商维修数据》,并作为飞机持续适航状态下的维修指南。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f9-06a1-c098-d34cb90f9100.html
点击查看答案
This data sheet prescribes conditions and limitations under which the product for which the type certificate was issued meets the airworthiness requirements.

A. This data sheet defines that the product, published by the type certificate, satisfies the airworthiness necessities complying with the conditions and limitations.

B. The product, for which the type certificate was approved, should reach the airworthiness requirements within conditions and limitations stipulating by this data sheet.

C. This data sheet regulates conditions and limitations of the airworthiness demands that the product, which has the qualified type certificate, should fulfill.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fb-1d49-c098-d34cb90f9100.html
点击查看答案
初始表面涂饰和新表面涂饰之间不应有视觉差异。

A. Visual difference is acceptable between the previous surface and the new surface.

B. There should be no visual difference between the initial surface finish and the new surface finish.

C. It is forbidden to have acoustic difference between the former surface finish and the new surface finish.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fd-0ee4-c098-d34cb90f9100.html
点击查看答案
Depressurize the reservoir with the manual bleed valve on the reservoir pressurization module.

A. 油箱泄压可以参考油箱增压组件的手册。

B. 用油箱增压组件上的手动引气活门给油箱泄压。

C. 手动引气活门可用来为管路加压。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f0-1f8d-c098-d34cb90f9100.html
点击查看答案
The adjustment/test description shall provide instructions for accomplishment of a test or check to assure the integrity as an operational component of a system, subsystem or unit assembly. Such tests or checks will vary in complexity and stringency according to the conditions under which the unit functions. It is not intended that a complex functional test of a complete system and its attendant closer tolerances be performed if the unit replaced reactiviates the system and operates within the confines of a go-no-go specification .

A. 在调试/测试的描述中应提供完成测试或检查的说明,以确保作为一个系统、子系统组件、工作部件的完整性。这样的测试或检查将根据部件运行的条件而在复杂度和严格度上有所不同。如果更换的部件使系统重新启动并在“是/否"规范的限制范围内运行,就不需要进行完整系统的复杂功能测试和更严格的容限测试。

B. 在调试/测试的描述中应提供完成测试或检查的说明,以确保作为一个系统、子系统或组件的一个工作部件的完整性。这样的测试或检查将根据部件运行的条件而在复杂度和严格度上有所不同。如果更换的部件使系统重新启动并在“是/否”规范的限制范围内运行,就不需对整个系统做复杂的功能测试和更严格的容限测试。

C. 在调试/测试的描述中应提供完成测试或检查的说明,以确保作为一个系统、子系统组件、工作部件的完整性。这样的测试或检查将根据部件运行的条件而在复杂度和严格度上有所不同。如果更换的部件使系统重新启动并在“是/否"规范的限制范围内运行,就不需要对整个系统做复杂的功能测试和进一步的容限测试。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3302-7cbe-c098-d34cb90f9100.html
点击查看答案
Probe the tube to find the blockage.

A. 使用探针检查管子以找出堵塞物。

B. 检查探头以确定是否堵塞。

C. 仔细检查管道以清除堵塞。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ef-350e-c098-d34cb90f9100.html
点击查看答案
A wire code consists of a circuit function code, wire number, wire segment letter and wire size.Frequently a suffix indicating ground ( N ) , phase (A, B, etc.) or thermocouple material(alumel, etc. ) is added.

A. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示地线(N)、相位(A、B等)或热电偶材料(铝镁合金等)。

B. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示接地(N)、阶段(A、B等)或热敏电门材料(铝镁合金等)。

C. 电线代码由电路功能代码、电线编号、电线段字母和电线尺寸组成。通常会添加后缀,表示地线(N)、相位(A、B等)或热敏电门材料(铝镁合金等)。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fe-4b5d-c098-d34cb90f9100.html
点击查看答案
Definitions should be worded as simply as possible and must conform with the use of the defined terms in the Handbook.

A. 定义措辞应尽可能简单,并必须符合手册中所定义的术语的使用。

B. 定义应尽可能简单地被记录,且必须保证手册中已定义术语的使用。

C. 定义应尽可能用词简单,且必须强制使用手册中规定的术语。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f9-d72c-c098-d34cb90f9100.html
点击查看答案
试题通小程序
试题通app下载