A、 Those units and components are responsible for storing and delivering fuel to the turbines system, including engine-driven fuel pumps, fuel tanks (airbags), valves, booster pumps, etc. and provide components for dumping fuel overboard.
B、 Those units and components are used to store and deliver fuel to the engine, including engine-driven fuel pumps, integral tanks (bladder), valves, boost pumps, etc., and those components which furnish a means of in-flight fuel dumping .
C、 Those units and components are designed to store and deliver fuel to the gas engine system, including engine-driven fuel pumps, fuel tanks (airbags), valves, booster pumps, etc. and units to pour fuel to the air.
答案:B
A、 Those units and components are responsible for storing and delivering fuel to the turbines system, including engine-driven fuel pumps, fuel tanks (airbags), valves, booster pumps, etc. and provide components for dumping fuel overboard.
B、 Those units and components are used to store and deliver fuel to the engine, including engine-driven fuel pumps, integral tanks (bladder), valves, boost pumps, etc., and those components which furnish a means of in-flight fuel dumping .
C、 Those units and components are designed to store and deliver fuel to the gas engine system, including engine-driven fuel pumps, fuel tanks (airbags), valves, booster pumps, etc. and units to pour fuel to the air.
答案:B
A. A surge tank drain single valve is on the outside fuel tank end rib in main tank 1 and main tank 2.
B. A surge tank drain one way value is on the inboard fuel tank end rib in main tank 1 and main tank 2.
C. A surge tank drain check valve is on the outboard fuel tank end rib in main tank 1 and main tank 2.
A. 接通断路器。
B. 打开电路接头。
C. 拔出跳开关。
A. Get approval for all modifications from the design authority.
B. The design department is irresponsible for approving the changes.
C. The arrangement has to be approved by the design department.
A. Each manufacturer is expected to abide by the Specification content and arrangement without any deviation in order to reasonably achieve the objectives of this Specification (enhance safety, reduce efforts, minimize costs).
B. It is mandatory that each manufacturer adhere to the Specification content and arrangement to achieve the objectives of this Specification (enhance safety, reduce efforts, minimize costs).
C. Each manufacturer is expected to adhere to the Specification content and arrangement reasonably so as to enhance safety, reduce efforts, and minimize costs which are the objectives of this Specification.
A. 如果RAT被撤回,缓慢并完全将其伸出,确保与其他部件衔接上。
B. 如果追踪到RAT,则缓慢并完全释放RAT,确保信号不与其他混淆。
C. 如果RAT是收回状态,缓慢和完全展开RAT,并确保它不碰到其他部件。
A. 保证表盘上的示数符合坦克的特性。
B. 确保面板上的显示符合罐内的性质。
C. 确保仪表上的指示与油箱内的油量一致。
A. Documents must be temporarily edible.
B. Documents must be readily revisable.
C. Documents must be permanently durable.
A. The user of this schematic diagram is the mechanic.
B. The user of this schematic diagram is the pilot.
C. The user of this schematic diagram is the flight attendant.
A. You need to open the cargo door when the windspeed exceeds 30 knots.
B. Wait for the wind speed to increase to over 30 knots before opening the cargo door.
C. You are allowed to open the cargo door when the wind speed reduces to less than 30 knots.
A. Apply two kindreds of protective compound to shield the sealant from any harm caused by hydraulic fluid.
B. In order to prevent damage to the sealant from hydraulic fluid, it is necessary to apply two layers of protective compound.
C. To prevent hydraulic fluid from drowning the sealant, it is recommended to apply two layers of protective compound.