A、 IAS shall be monitored continuously until the end of the test.
B、 Monitor the speed indication as long as the test continues.
C、 Monitor the speed indication continuously until the end of the test.
答案:C
A、 IAS shall be monitored continuously until the end of the test.
B、 Monitor the speed indication as long as the test continues.
C、 Monitor the speed indication continuously until the end of the test.
答案:C
A. 电源系统描述的是发电、控制和通过汇流条向其他系统提供交流/直流电的电气组件和部件,包括发电机、继电器、变流器、电瓶等
B. 电源系统描述的是发电、控制和通过汇流条向其他系统提供交流/直流电的电气组件和部件,包括发电机、接触器、变流器、电瓶等
C. 电源系统描述的是发电、控制和通过汇流条向其他系统提供交流/直流电的电气组件和部件,包括发电机、接触器、整流器、电瓶等
A. 一定不要有漏洞。
B. 确保没有遗漏。
C. 确保没有泄漏。
A. Use the upper latch mechanism to lock the lower display unit in the middle.
B. The latch mechanism at the top is used to secure the center display unit on the bottom.
C. The center lower display unit is installed with the latch mechanism at the top.
A. The safety procedures are supplied by the manufacturer.
B. Safety procedures are to be supplied to the manufacturer.
C. Safety procedures are provided for manufacturers to follow.
A. 为飞机延长停场周期做准备。
B. 为飞机长时间停用做准备。
C. 准备好飞机做保留故障处理。
A. Do not apply too much composite on the blanket.
B. Do not apply too much adhesive on the gasket.
C. Do not apply too much compound on the gasket.
A. 《持续适航维修大纲》检查文件编号中系统代号的两位数字应使用GAMA第2号规范的编号体系。
B. 在《持续适航维修大纲》检查文件编号中,代表章号的两位数字应遵循GAMA 第2号规范的编号体系。
C. 《持续适航维修大纲》检查文件编号中的两个数字应由GAMA第2号规范中的编号系统决定。
A. The Preface has been neglected in the sample CAP in Section III and the necessary information has resumed in the Objectives.
B. The Preface has been deleted in the sample CAP in Section III and the necessary information has been excluded in the Objectives.
C. The Preface has been canceled in the sample CAP in Section III and the necessary information has been covered in the Objectives.
A. 包含飞机持续适航维修程序的主要文件是《飞机维护手册》(《持续适航文件(ICA)》)。根据本规范编制的文件是补充性要求,应与飞机维护手册一并使用。
B. 包含飞机持续适航维修程序的主要文件是《飞机的维护手册》(《持续适航文件(ICA)》)。按照本规范编写的文件是对该维修手册的补充,也是为了与该维修手册一起使用。
C. 包含飞机持续适航维修程序的主要文件是《飞机的维护手册》(《持续适航文件(ICA)》)。根据本规范编制的文件补充了该维护手册,并设计用于该维护手册。
A. The computer consumes the energy based on these values calculations.
B. The computer calculates the energy consumption from these values.
C. The computer counts these values based on the energy costs.