APP下载
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
搜索
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
交换1、2号计算机,然后再做测试。

A、 Replace the No. 1 and No. 2 computers. Then do the test again.

B、 Interchange the No. 1 and No. 2 computers. Then do the test again.

C、 Repair the No. 1 and No. 2 computers. Then do the test again.

答案:B

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
如果两个表上读数不一致, 再做一次测试。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-0733-c098-d34cb90f9100.html
点击查看题目
Do not exceed this speed or Mach Number except in smooth air and then only with caution.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fe-9ab5-c098-d34cb90f9100.html
点击查看题目
The oil debris monitor is used to sense the size and quantity of ferrous and non-ferrous metal in the scavenge oil system.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f8-0397-c098-d34cb90f9100.html
点击查看题目
Subparagraphs and other pertinent information, such as a list of figures, may be shown in the table of contents of the section.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f0-456f-c098-d34cb90f9100.html
点击查看题目
尽管如此,各制造商仍应遵循相同的基本系统和主题安排顺序,即使某些系统可能在不适用时被省略。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-ec8d-c098-d34cb90f9100.html
点击查看题目
调整卡箍,直到有足够的摩擦力将其固定到位。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f3-7377-c098-d34cb90f9100.html
点击查看题目
Examine the drain holes for blockage.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f5-0817-c098-d34cb90f9100.html
点击查看题目
Remove all the rigging pins and equipment that prevent free movement of the control surfaces.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fd-8dfe-c098-d34cb90f9100.html
点击查看题目
不定期维修检查是指制造商认为特殊或不寻常的情况下对飞机、其系统和组件进行的维修检查和检验,这些检查和检验与上文-10规定的时限无关。
https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-5675-c098-d34cb90f9100.html
点击查看题目
Do these two steps at the same time.
https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ef-1517-c098-d34cb90f9100.html
点击查看题目
首页
>
财会金融
>
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
题目内容
(
单选题
)
手机预览
民用航空器维修人员执照英语参考试题-共3257题(核对版)202402

交换1、2号计算机,然后再做测试。

A、 Replace the No. 1 and No. 2 computers. Then do the test again.

B、 Interchange the No. 1 and No. 2 computers. Then do the test again.

C、 Repair the No. 1 and No. 2 computers. Then do the test again.

答案:B

民用航空器维修人员执照英语参考试题-共3257题(核对版)202402
相关题目
如果两个表上读数不一致, 再做一次测试。

A. If the two indications do not agree, do the test again.

B. If there is a conflict between the two indications, repeat the test.

C. If the two indicators show any conflict, repeat the test.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3300-0733-c098-d34cb90f9100.html
点击查看答案
Do not exceed this speed or Mach Number except in smooth air and then only with caution.

A. 不要超过这个速度或马赫数,但当空气平稳时仅仅小心操作就足够了。

B. 除非在平稳的空气中谨慎操作,否则不得超过此速度或马赫数。

C. 不要超过这个马赫数的速度,除非接受警戒只在平稳的空气中操作。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fe-9ab5-c098-d34cb90f9100.html
点击查看答案
The oil debris monitor is used to sense the size and quantity of ferrous and non-ferrous metal in the scavenge oil system.

A. 油屑监测器用于监控除油系统中黑色金属和有色金属屑的大小和质量。

B. 磁屑探测器用于探测排油系统中含铁和不含铁金属的尺寸和数量。

C. 油屑探测器用于检测回油系统中黑色金属和有色金属的尺寸和数量。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f8-0397-c098-d34cb90f9100.html
点击查看答案
Subparagraphs and other pertinent information, such as a list of figures, may be shown in the table of contents of the section.

A. 子段落和其从属信息,如图表列表,会显示在本部分的内容清单中。

B. 在本部分的目录中会展示次段落的相应信息,譬如数据列表。

C. 分段和其它相关信息,例如图表清单,可在本节的目录中显示。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f0-456f-c098-d34cb90f9100.html
点击查看答案
尽管如此,各制造商仍应遵循相同的基本系统和主题安排顺序,即使某些系统可能在不适用时被省略。

A. However, manufacturers are following the same fundamental systems and sequence of subject arrangements even if some systems, which are not available, may be bypassed.

B. Nevertheless, each manufacturer is expected to follow the same sequence of basic system and subject arrangements even though some systems may be omitted when not applicable.

C. Even so, all manufacturers are expected to submit to the same arrangements of main systems and subject sequences even though certain systems would be ignored when not applicable.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-ec8d-c098-d34cb90f9100.html
点击查看答案
调整卡箍,直到有足够的摩擦力将其固定到位。

A. If there is sufficient friction to keep it in position, adjust the clamp.

B. Adjust the clip until there is sufficient friction to keep it in position.

C. Adjust the clamp until there is sufficient friction to keep it in position.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f3-7377-c098-d34cb90f9100.html
点击查看答案
Examine the drain holes for blockage.

A. Inspect the drain holes for obstruction.

B. Check for the drain holes for abrasion.

C. Check the drain holes for leakage.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32f5-0817-c098-d34cb90f9100.html
点击查看答案
Remove all the rigging pins and equipment that prevent free movement of the control surfaces.

A. 拆除所有阻止操纵舵面自由移动的校装销和设备。

B. 拆下所有的插钉和设备使操纵舵面自由移动。

C. 拆下所有的开口销,并移走防止操纵舵面自由移动的设备。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32fd-8dfe-c098-d34cb90f9100.html
点击查看答案
不定期维修检查是指制造商认为特殊或不寻常的情况下对飞机、其系统和组件进行的维修检查和检验,这些检查和检验与上文-10规定的时限无关。

A. Unscheduled maintenance checks are those maintenance checks and inspections on the aircraft, its systems and units which are recognized by the manufacturer as special or unusual conditions which are not related to the time limits specified in -10 above.

B. For the unscheduled maintenance checks and inspections of aircraft, aircraft systems and components, the manufacturer shall not include special or unusual conditions from the time limits specified in -10.

C. If the unscheduled maintenance checks and inspections on the aircraft, its systems and units are special or unusual conditions, the time limits specified in -10 shall be referred to by the manufacturer's.

https://www.shititong.cn/cha-kan/shiti/0005eb2d-3305-5675-c098-d34cb90f9100.html
点击查看答案
Do these two steps at the same time.

A. 分步执行这两个步骤。

B. 依次执行这两个程序。

C. 同时做这两个步骤。

https://www.shititong.cn/cha-kan/shiti/0005eb2d-32ef-1517-c098-d34cb90f9100.html
点击查看答案
试题通小程序
试题通app下载