11.An architect is reviewing a physical storage design. The customer has specified that storage DRS will be used for ease of operational management for capacity and performance
Which recommendation should the architect include in the design?

A、  Create smaller datastores to balance space with Storage DRS

B、  Use a larger number of storage profiles (varied disk speeds and RAID levels) to improve performance

C、  Create larger datastores to balance space with Storage DRS

D、  Create more datastores within each Storage DRS cluster to balance space and performance

答案:D

虚拟化高级试题题库4
59.Which two of the listed requirements would be classified as performance non-functional requirements?Choose two.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-ae38-c0f9-29e3bb5dbe01.html
点击查看题目
72.An architect is designing a VMware software-defined data center ( ) solution based on the following customer requirements:
The solution must initially support 1,000 virtual machines
The solution must scale to support the concurrent running of up to 5,000 virtual machines
The production environment should be delivered across two data centers
The solution should have a maximum tolerable downtime ( ) of four hours
The solution should have a monthly service availability target of 99.8%
Which two assumptions could the architect make based on the information from the customer to help size the solution? Choose two.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-fc58-c0f9-29e3bb5dbe00.html
点击查看题目
53.An architect is preparing a design for a customer. Based on requirements, the architect recommends an HCI-based infrastructure with all-flash architecture. During the assessment, it is confirmed that the network throughput generated by virtual machines does not exceed 150 Mb/s.
What is the minimum number and type of network adapters in each server that the architect can recommend to ensure requirements are met and there is no single point of failure?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-96c8-c0f9-29e3bb5dbe00.html
点击查看题目
1.An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image.

All hosts within the cluster have the same CPU and memory capacity.

Which ESXi deployment method should the architect use?

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-a880-c0f9-29e3bb5dbe00.html
点击查看题目
37.An architect is creating a network design for a new vSphere environment.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-5848-c0f9-29e3bb5dbe00.html
点击查看题目
29.During a requirements gathering workshop to design a physical to virtual migration, the customer provides the following information:
There is no physical firewall in the data center with no anticipated plans for a future network refresh.
Leveraging the virtual infrastructure to mitigate the lack of network security must be addressed in the design.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-3138-c0f9-29e3bb5dbe00.html
点击查看题目
24.branch sites connected to a single VMware vCenter Server within the primary data center. To allow for the use of existing automation scripts, there is a requirement to replicate the names of the virtual distributed port groups across all sites. The procurement team purchases licensing and there is no further budget allocated
Which design decision should the architect make to meet this requirement?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-19c8-c0f9-29e3bb5dbe00.html
点击查看题目
80.Which two statements are true about gathering functional business and application requirements? Choose two.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-2368-c0f9-29e3bb5dbe00.html
点击查看题目
78.An architect is designing a vSphere environment for a customer based on the following information:

The vSphere cluster will have three hosts only due to budget considerations.

A database cluster (node majority) consisting of three virtual machines will be running on the vSphere cluster.

Which two recommendations can the architect make so that the customer achieves the highest level of application availability while taking into consideration operational resiliency? Choose two.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-1b98-c0f9-29e3bb5dbe00.html
点击查看题目
19.During a requirements gathering workshop, the customer’s Chief Information Security Office ( CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:All operating system critical patches must be installed within 24 hours of release;All virtual machine templates must be updated every three months in line with company policy.

Which requirement classification is being gathered for the design documentation?

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-fe70-c0f9-29e3bb5dbe00.html
点击查看题目
首页
>
IT互联网
>
虚拟化高级试题题库4
题目内容
(
单选题
)
手机预览
虚拟化高级试题题库4

11.An architect is reviewing a physical storage design. The customer has specified that storage DRS will be used for ease of operational management for capacity and performance
Which recommendation should the architect include in the design?

A、  Create smaller datastores to balance space with Storage DRS

B、  Use a larger number of storage profiles (varied disk speeds and RAID levels) to improve performance

C、  Create larger datastores to balance space with Storage DRS

D、  Create more datastores within each Storage DRS cluster to balance space and performance

答案:D

分享
虚拟化高级试题题库4
相关题目
59.Which two of the listed requirements would be classified as performance non-functional requirements?Choose two.

A.   The vSphere platform must be able to provide a recovery time objective of 30 minutes

B.   The vSphere platform must be able to provide a minimum throughput of 400 MB/s

C.   The vSphere platform must be able to provide N+1 redundancy

D.   The vSphere platform must be able to provide a maximum read latency of 15 ms

E.   The vSphere platform must be able to provide a service-level agreement (SLA) of 99,9%

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-ae38-c0f9-29e3bb5dbe01.html
点击查看答案
72.An architect is designing a VMware software-defined data center ( ) solution based on the following customer requirements:
The solution must initially support 1,000 virtual machines
The solution must scale to support the concurrent running of up to 5,000 virtual machines
The production environment should be delivered across two data centers
The solution should have a maximum tolerable downtime ( ) of four hours
The solution should have a monthly service availability target of 99.8%
Which two assumptions could the architect make based on the information from the customer to help size the solution? Choose two.

A.   The number of vSphere hosts in a cluster

B.   The average resource utilization of a virtual machine

C.   The size (CPU/RAM/storage) of the average virtual machine

D.   The guest operating system for each virtual machine

E.   The size (CPU/RAM/storage) of the vSphere hosts

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-fc58-c0f9-29e3bb5dbe00.html
点击查看答案
53.An architect is preparing a design for a customer. Based on requirements, the architect recommends an HCI-based infrastructure with all-flash architecture. During the assessment, it is confirmed that the network throughput generated by virtual machines does not exceed 150 Mb/s.
What is the minimum number and type of network adapters in each server that the architect can recommend to ensure requirements are met and there is no single point of failure?

A.   Two 1 GbE network adapters per server

B.   Four 1 GbE network adapters per server

C.   Four 10 GbE network adapters per server

D.   Two 10 GbE network adapters per server

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-96c8-c0f9-29e3bb5dbe00.html
点击查看答案
1.An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image.

All hosts within the cluster have the same CPU and memory capacity.

Which ESXi deployment method should the architect use?

A.   Stateless cached vSphere Auto Deploy

B.   Stateless vSphere Auto Deploy

C.   Manual install of each ESXi host with an image from USB

D.   Stateful vSphere Auto Deploy

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-a880-c0f9-29e3bb5dbe00.html
点击查看答案
37.An architect is creating a network design for a new vSphere environment.

A.   Use different logical networks to ensure traffic is isolated with separate VLANs

B.   Use Network I/O Control and ensure appropriate share value is defined for different types of traffic giving priority to the virtual machines traffic

C.   Use two dedicated virtual switches with a single adapter each, dedicating one virtual switch for Management, vMotion, vSAN and Fault Tolerance traffic, and the second one for virtual machine traffic

D.   Use a NIC teaming policy based on the physical NIC load

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-5848-c0f9-29e3bb5dbe00.html
点击查看答案
29.During a requirements gathering workshop to design a physical to virtual migration, the customer provides the following information:
There is no physical firewall in the data center with no anticipated plans for a future network refresh.
Leveraging the virtual infrastructure to mitigate the lack of network security must be addressed in the design.

A.   Split the virtual machines into several VLANs
Use tag actions

B.   Create port groups with different names and same VLAN IDs

C.   Enable traffic filtering and marking
Use allow or drop actions

D.   Disable traffic filtering and marking
Use tag actions

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-3138-c0f9-29e3bb5dbe00.html
点击查看答案
24.branch sites connected to a single VMware vCenter Server within the primary data center. To allow for the use of existing automation scripts, there is a requirement to replicate the names of the virtual distributed port groups across all sites. The procurement team purchases licensing and there is no further budget allocated
Which design decision should the architect make to meet this requirement?

A.   A new vCenter Server will be deployed for each branch site

B.   A new host and cluster folder will be created for each branch site

C.   The automation script will be updated to reflect unique naming for each site

D.   A new virtual data center will be created for each branch site

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-19c8-c0f9-29e3bb5dbe00.html
点击查看答案
80.Which two statements are true about gathering functional business and application requirements? Choose two.

A.   It focuses on functional requirements with C-level stakeholders

B.   It leverages a single set of questions for all stakeholders

C.   It might require multiple rounds of stakeholder interviews

D.   It builds stakeholder consensus

E.   It is a non-iterative process

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-2368-c0f9-29e3bb5dbe00.html
点击查看答案
78.An architect is designing a vSphere environment for a customer based on the following information:

The vSphere cluster will have three hosts only due to budget considerations.

A database cluster (node majority) consisting of three virtual machines will be running on the vSphere cluster.

Which two recommendations can the architect make so that the customer achieves the highest level of application availability while taking into consideration operational resiliency? Choose two.

A.   Create VM-VM anti-affinity rules

B.   Set das.respectvmvmantiaffinityrules to false

C.   Create VM-Host anti-affinity rules

D.   Disable vSphere HA during maintenance

E.   Set das.ignoreinsufficienthbdatastore to true

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-1b98-c0f9-29e3bb5dbe00.html
点击查看答案
19.During a requirements gathering workshop, the customer’s Chief Information Security Office ( CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:All operating system critical patches must be installed within 24 hours of release;All virtual machine templates must be updated every three months in line with company policy.

Which requirement classification is being gathered for the design documentation?

A.   Security

B.   Manageability

C.   Recoverability

D.   Availability