A、 The vSphere hosting platform and all PCI application virtual machines must be assessed against Payment Card Industry (PCI) Data Security Standard compliance
B、 The vSphere hosting platform and all PCI application virtual machines must be assessed for SOX compliance.
C、 The vSphere hosting platform and all PCI application virtual machine network traffic must be routed via NSX-T.
D、 The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.
答案:D
A、 The vSphere hosting platform and all PCI application virtual machines must be assessed against Payment Card Industry (PCI) Data Security Standard compliance
B、 The vSphere hosting platform and all PCI application virtual machines must be assessed for SOX compliance.
C、 The vSphere hosting platform and all PCI application virtual machine network traffic must be routed via NSX-T.
D、 The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.
答案:D
A. Two
B. Three
C. One
D. None
A. Five
B. Six
C. Four
D. Seven
A. Separate Distributed Virtual Switches (DVS)
B. Private VLANs (PVLAN)
C. Virtual Guest Tagging (VGT)
D. vSwitch VLAN Tagging (VST)
A. Site Recovery Manager
B. Snapshots
C. vSAN Metro Cluster
D. vSphere Data Protection
E. vStorage APIs for Array Integration (VAAI)
A. A design diagram illustrating the configuration and specific attributes, such as IP addresses
B. A list of requirements, constraints, and risks
C. A solution architecture diagram with the components and data flow
D. An entity relationship diagram describing upstream and downstream dependencies for specific service components
A. The system must perform virtual machine backups through an API.
B. Virtual machines must be patched within one month of the patch release date.
C. Virtual machines must be restarted within 30 minutes of a host failure.
D. The system must be able to scale to support 500 concurrent virtual machines.
A. Manageability
B. Performance
C. Availability
D. Recoverability
A. Three
B. Five
C. Four
D. Two
解析:解析:CPU: (60+60*0.45)/36 =2.4,RAM: (1152+1152*0.45)/512 = 3.2
A. Use Route Based on Physical NIC Load
B. Use Network I/O Control with Shares.
C. Use Network I/O Control with Reservation.
D. Use Link Aggregation Control Protocol (LACP).
E. Use Network I/O Control with Limits.
A. Work with the build team to create a local content library for each vSphere environment. Import the OVF images when new image are published to the repository.
B. Create a local content library for the primary vSphere environment in each data center.Create a subscribed content library for each additional vSphere environment in each data center. Configure the content library to download content automatically.
C. Work with the build team to automate a JSON-based manifest to the repository when changes occur in the repository. Create a subscribed content library for each vSphere environment. Configure the content library to download content when needed.
D. Work with the build team to automate a JSON-based manifest to the repository when changes occur in the repository.Create a subscribed content library for each vSphere environment.Configure the content library to download content automatically.