62.An architect is designing a new vSphere platform to meet a list of requirements from the security team.
Which two requirements would be classified as non-functional requirements? Choose two.

A、  Migration of virtual machines between hosts must be encrypted

B、  Log information must be verbose to support incident resolution

C、  Critical events generated within the platform must be logged to an external Syslog service

D、  Data integrity must be ensured

E、  A common content library must be maintained across all data centers

答案:AC

虚拟化高级试题题库4
71.During a transformation project kick-off meeting, an architect highlights specific areas on which to focus while developing the new conceptual design.
Which two of the listed statements are business requirements? Choose two.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-f870-c0f9-29e3bb5dbe00.html
点击查看题目
49.An architect is tasked with designing a new VMware software-defined data center ( ) solution for an online retail customer who has a primary and secondary data center as well as 10 distribution hubs.
The customer has provided the following business requirements to help inform the design:
The solution must support the running of up to 1,000 concurrent virtual machines across the primary and secondary data center.
The solution must support the running of up to 20 concurrent virtual machines in each distribution hub.
The solution must support the separation of management and lines-of-business application virtual machines.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-8340-c0f9-29e3bb5dbe00.html
点击查看题目
45.An architect is designing an environment for a retail customer. The design will use a single small vCenter Server Appliance and a cluster of eight ESXi hosts at a remote site. There is a single 10 GbE connected network at the remote site to support all management services. It is not possible to create additional management networks at the remote site. Virtual machine backups at the site will be dependent on the vCenter Server being available.
Which design decision should the architect make to maximize availability for backups?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-7788-c0f9-29e3bb5dbe00.html
点击查看题目
50.Which of the listed requirements would be classified as a recoverability non-functional requirement?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-8b10-c0f9-29e3bb5dbe00.html
点击查看题目
75.An architect is tasked with designing a greenfield VMware software-defined data center ( ) solution that will be used to deliver a private cloud service for a customer.


Given the information from the customer, which two would be classified as assumptions within the design? Choose two.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-0bf8-c0f9-29e3bb5dbe00.html
点击查看题目
6.An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe00.html
点击查看题目
1.An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image.

All hosts within the cluster have the same CPU and memory capacity.

Which ESXi deployment method should the architect use?

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-a880-c0f9-29e3bb5dbe00.html
点击查看题目
41.What is a benefit of using a scale-out method for handling vSphere cluster growth?
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-67e8-c0f9-29e3bb5dbe00.html
点击查看题目
70.An architect is tasked with expanding an existing VMware software-defined data center ( ) solution so that it can be used to deliver a virtual desktop infrastructure ( ) service off-shore development activities.
The production environment is currently delivered across two geographically dispersed data centers. The two data centers are currently connected to each other through multiple diversely routed, high bandwidth and low latency links. The current operations management components are deployed to a dedicated management cluster that is configured with N+1 redundancy. The current VMware software-defined data center ( ) has a monthly availability target of 99.5%, which includes all management components.
The customer requires that the new solution scale to support the concurrent running of 500 persistent virtual desktops. The virtual desktops must not share the same virtual infrastructure as existing virtual machines, but can be managed using the same VMware operations management components. Any new VDI service management components must be installed into the management cluster. There is no requirement to back up the virtual desktops because all relevant user data is stored centrally. The VDI service is providing business critical services and must have an availability target of 99.9%.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-f0a0-c0f9-29e3bb5dbe00.html
点击查看题目
13.A customer has six hosts available in a cluster. When running at full capacity, all virtual machines can be run on two hosts.
https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-df30-c0f9-29e3bb5dbe01.html
点击查看题目
首页
>
IT互联网
>
虚拟化高级试题题库4
题目内容
(
多选题
)
手机预览
虚拟化高级试题题库4

62.An architect is designing a new vSphere platform to meet a list of requirements from the security team.
Which two requirements would be classified as non-functional requirements? Choose two.

A、  Migration of virtual machines between hosts must be encrypted

B、  Log information must be verbose to support incident resolution

C、  Critical events generated within the platform must be logged to an external Syslog service

D、  Data integrity must be ensured

E、  A common content library must be maintained across all data centers

答案:AC

分享
虚拟化高级试题题库4
相关题目
71.During a transformation project kick-off meeting, an architect highlights specific areas on which to focus while developing the new conceptual design.
Which two of the listed statements are business requirements? Choose two.

A.   The project should use the existing storage devices within the data center

B.   Sites must support a network latency of less than 12 ms round-trip time (RTT)

C.   The solution must allow data replication between sites

D.   There is no budget specifically assigned for disaster recovery

E.   There must not be a single point of failure for the virtual infrastructure

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-f870-c0f9-29e3bb5dbe00.html
点击查看答案
49.An architect is tasked with designing a new VMware software-defined data center ( ) solution for an online retail customer who has a primary and secondary data center as well as 10 distribution hubs.
The customer has provided the following business requirements to help inform the design:
The solution must support the running of up to 1,000 concurrent virtual machines across the primary and secondary data center.
The solution must support the running of up to 20 concurrent virtual machines in each distribution hub.
The solution must support the separation of management and lines-of-business application virtual machines.

A.   All business application virtual machines can be deployed into a single cluster within the primary datacenter.

B.   Each distribution hub should be configured with a backup device.

C.   The wide area network has sufficient bandwidth to support centralized management.

D.   Each cluster will have a minimum of four hosts.

G.  iven the information from the customer, which assumption should the architect include in the design?

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-8340-c0f9-29e3bb5dbe00.html
点击查看答案
45.An architect is designing an environment for a retail customer. The design will use a single small vCenter Server Appliance and a cluster of eight ESXi hosts at a remote site. There is a single 10 GbE connected network at the remote site to support all management services. It is not possible to create additional management networks at the remote site. Virtual machine backups at the site will be dependent on the vCenter Server being available.
Which design decision should the architect make to maximize availability for backups?

A.   vCenter Server High Availability will be configured.

B.   The vCenter Server Appliance will be protected with vSphere Fault Tolerance.

C.   The cluster will be configured to use vSphere DRS in fully automated mode.

D.   The cluster will be configured with vSphere HA and set to restart virtual machines based on guest operating system heartbeat monitoring.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-7788-c0f9-29e3bb5dbe00.html
点击查看答案
50.Which of the listed requirements would be classified as a recoverability non-functional requirement?

A.   The platform must be integrated with existing change control policies.

B.   The platform must be able to support a maximum tolerable downtime (MTD) of 30 minutes.

C.   Maintenance windows must be scheduled to take place monthly during an established overnight period.

D.   The platform must be available 24 hours a day, 7 days a week with the exception of scheduled downtime.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-8b10-c0f9-29e3bb5dbe00.html
点击查看答案
75.An architect is tasked with designing a greenfield VMware software-defined data center ( ) solution that will be used to deliver a private cloud service for a customer.


Given the information from the customer, which two would be classified as assumptions within the design? Choose two.

A.   The backup service will store data in a secure facility

B.   The backup service has sufficient capacity for the new requirements

C.   The customer will update their hardware standard to support rack mount servers

D.   All virtual machines will be deployed with the same resource profile for production and development

E.   The clusters will have a minimum redundancy of N+1

G.

https://www.shititong.cn/cha-kan/shiti/0005ee2e-7230-0bf8-c0f9-29e3bb5dbe00.html
点击查看答案
6.An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?

A.   Large

B.   Small

C.   X-Large

D.   Medium

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-bff0-c0f9-29e3bb5dbe00.html
点击查看答案
1.An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image.

All hosts within the cluster have the same CPU and memory capacity.

Which ESXi deployment method should the architect use?

A.   Stateless cached vSphere Auto Deploy

B.   Stateless vSphere Auto Deploy

C.   Manual install of each ESXi host with an image from USB

D.   Stateful vSphere Auto Deploy

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722e-a880-c0f9-29e3bb5dbe00.html
点击查看答案
41.What is a benefit of using a scale-out method for handling vSphere cluster growth?

A.   An increase in the recovery time objective (RTO) for the cluster

B.   Faster to reach the limit of virtual machines per host

C.   An overall reduction in the license costs for the cluster

D.   Less potential impact to virtual machines during a single host failure

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-67e8-c0f9-29e3bb5dbe00.html
点击查看答案
70.An architect is tasked with expanding an existing VMware software-defined data center ( ) solution so that it can be used to deliver a virtual desktop infrastructure ( ) service off-shore development activities.
The production environment is currently delivered across two geographically dispersed data centers. The two data centers are currently connected to each other through multiple diversely routed, high bandwidth and low latency links. The current operations management components are deployed to a dedicated management cluster that is configured with N+1 redundancy. The current VMware software-defined data center ( ) has a monthly availability target of 99.5%, which includes all management components.
The customer requires that the new solution scale to support the concurrent running of 500 persistent virtual desktops. The virtual desktops must not share the same virtual infrastructure as existing virtual machines, but can be managed using the same VMware operations management components. Any new VDI service management components must be installed into the management cluster. There is no requirement to back up the virtual desktops because all relevant user data is stored centrally. The VDI service is providing business critical services and must have an availability target of 99.9%.

A.   The existing virtual infrastructure has sufficient capacity to host the new VDI workloads

B.   The existing operations monitoring tools have sufficient capacity to monitor the new VDI services

C.   The existing management cluster has enough available capacity to host any VDI service management component

D.   The management cluster has N+1 redundancy

E.   The VDI service has a higher service-level agreement (SLA) than the operations management SLA

https://www.shititong.cn/cha-kan/shiti/0005ee2e-722f-f0a0-c0f9-29e3bb5dbe00.html
点击查看答案
13.A customer has six hosts available in a cluster. When running at full capacity, all virtual machines can be run on two hosts.

A.   Two

B.   Three

C.   One

D.   None