A、 For aircraft with a range of sophistic lor complex systems, a system-wide indexing approach is
recommended.
B、 For aircraft including an article of exquisite or complex systems, a whole system indexing way is intended,
C、 The aircraft which have a number of complicated or complex systems are suggested to use the full
system/chapter index method.
答案:C
A、 For aircraft with a range of sophistic lor complex systems, a system-wide indexing approach is
recommended.
B、 For aircraft including an article of exquisite or complex systems, a whole system indexing way is intended,
C、 The aircraft which have a number of complicated or complex systems are suggested to use the full
system/chapter index method.
答案:C
A. 在 STEMG 网站上的电子版的不一页也有改变的表格
B. 下一页有一份变更表,在 STEMG 网站上也有电子版的。
C. 下一页有一份已改变形式,也可以在 STEMG 网站上以电子格式提供。
A. The coating thickness must be more than 0.05mm and less than 0.06mm.
B. The thickness of the second coating layer must be 0.05mm and 0.06mm
C. The thickness of primer layer must be between 0.05 mm and 0.06 mm.
A. When you change a word, always assure that the alternative you choose does not change the sequence of
the sentence.
B. When you replace a word, always make sure that the alternative you select does not change the meaning
of the sentence.
C. When you exchange a word, always ensure that the alternative you pick does not change the order of the
sentence.
A. 、 lf the filters become clogged after an unusually short time, send them to the laboratory for analysis of the
contamination.
A. 每一个点处的宽度和深度值不能小于 30.
B. 每一个点处的宽深值不能大于 30.
C. 每一个点处的宽深比不少于 30
A. 拆卸较大的螺帽。
B. 安装较大的螺栓。
C. 组装较大的螺钉。
A. Alternatively, you can do test B.
B. Test A is irreplaceable.
C. Test A is the equivalent of test B.
A. After three full cycles, extend and retract the actuator.
B. You should extend and retract the actuator through three complete cycles.
C. Do nothing to the actuator after three complete cycles.
A. 用干净的棉布浸湿水后清除除污剂。
B. 用清水浸湿并清洗带有洗涤剂的干净棉布。
C. 用干净的棉布清除污渍,再用清水洗涤。
A. 对现有的分析进行了审查,以确定可能存在安全裕度较低的部件和区域
B. 从分析结果发现,有部件和相关区域显示出安全性能较低的迹象
C. 故障分析结果显示,某些部件和区域现有些安全指标达不到设计要求