A、 时间功能不累积小时。
B、 计时功能不累积小时。
C、 计时功能不计算小时"
答案:C
A、 时间功能不累积小时。
B、 计时功能不累积小时。
C、 计时功能不计算小时"
答案:C
A. 这些断流开关操作断流活门,断流活门是安定面配平控制模块的一部分,隔离到尾部的安定面配平组件的
液压动力
B. 这些切断活门由切断电门操作,切断电门是安定面配平控制模块的一部分,将液压动力隔离到尾部的安定
面配平组件。
C. 这些由关闭电门操作的切断阀门可以作为稳定器配平控制模块的一部分,隔离流到尾部的稳定器配平组件
的液压动力。
A. Restore sections that relate to certain types of trouble
B. Locate sections that relate in general types of trouble.
C. Recognize sections that lead to particular types of trouble.
A. Install packing and support rings on bearing Glide bearing into cylinder until it is bottomed.
B. Install packing and backward rings on bearing. Slash bearing into cylinder until the bottom is visible
C. Install packing and alternative rings on bearing. Skid bearing into cylinder until you see the bottom.
A. Procedures shall be omitted for coping with cases of smoke and/or fire in the cabin or from an engine in
the following fight segments.
B. Procedures shall be provided for accompany with cases of smoke and/or fire in the cabin or from an
engine in the following flight sectors.
C. Procedures shall be provided for coping with cases of smoke and/or fire in the cabin or from an engine in
the following flight phases.
A. The manufacturer may offer procedures to provide feedback on unairworthy conditions that were
discovered to be complied.
B. In order to discover any unairworthy conditions when compiling, the manufacturer shall comply with
certain procedures.
C. The manufacturer may set up 'procedures to feedback unairworthy conditions discovered when
complying.
A. 将备件送到修理厂。
B. 将零件送至大修商店。
C. 将部件送到大修车间。
A. Setting cable tension, flight control surfaces travel limits and stops are the main tasks of rigging.
B. Cable tension set, flight controls travel limits adjustment and travel stops set are the rigging procedures.
A. Examine and remove the parts that are damaged.
B. Examine the removed parts with damage.
C. Examine the removed parts for damage.
A. The component was damaged badly the repairing cost is over 60% of the total price. The workshop
suggests reporting as an unserviceable part.
B. The component was damaged heavily, the repairing cost is over 60% of the total price. The workshop
suggests scrapping.
C. The component was destroyed heavily, the repairing cost is 60% of the total price. The workshop suggests
segregation.
A. The pump is installed behind the hydraulic motor.
B. The gearbox is installed behind the pneumatic motor.
C. The hydraulic motor is installed behind the pump.