A、 Adapt the pressure connection to the pitot head.
B、 Adjust the pressure connection to the pilot head.
C、 Absorb the pressure connection to the pitot port.
答案:A
A、 Adapt the pressure connection to the pitot head.
B、 Adjust the pressure connection to the pilot head.
C、 Absorb the pressure connection to the pitot port.
答案:A
A. Entrance Stairs or step are connected with entrance doors and move
accordingly.
B. Entrance Stairs or step are integrated with entrance doors and operate
together.
C. Although entrance Stairs or step operate together with entrance doors,
they are not integrated.
A. You may use alerts and cautions to emphasize some important places.
B. The important parts must be highlighted by using the warnings,cautions
and notes.
C. Warning,cautions and notes may be used to highlight or emphasize
important points.
A. 在小型永久装订的手册里,制造商有权利从各个页面中省略制造商的标头,
出版物标题,飞机型号以及发行和修订日期或代码。
B. 在小型暂时装订的手册里,制造商有资格从各个页面中省略制造商的标头,
出版物标题,飞机型号以及发行和修订日期或代码。
C. 在小型永久装订的手册里,制造商可以选择从各个页面中省略制造商的标头,
出版物标题,飞机型号以及发行和修订日期或代码。
A. Copy density should be the same throught the page.
B. Copy density must be different throught the page.
C. Density of copy must be different throught the page.
A. THINK
B. SUSPECT
C. CONSIDER
A. 通常,当在章节末尾或出版物的后部增加页面--不影响手册中的页面时--必
须准备修订版。
B. 通常,当在章节一端或出版物的背面增加页面--不影响手册中的页面时--必
须随时准备修订版。
C. 通常,当在章节末尾或出版物的背面增加页面--不影响手册中已经存在的页
面时--必须准备修订版。
A. 在施工中,所有测量单位必须与手册中给出的一致。
B. 在施工中,所有测量单位应该与手册中给出的一致。
C. 在施工中,手册中给出的测量单位必须一致。
A. 顺时针方向转动螺栓。
B. 顺时针方向转动盖子。
C. 逆时针方向转动盖子。
A. This work is applicable to horizontal installations.
B. This work is applicable to direction installations.
C. This work is applicable to vertical installations.