APP下载
首页
>
在校教育
>
噜啦啦噜啦噜啦啦啦啦啦啦1
搜索
噜啦啦噜啦噜啦啦啦啦啦啦1
题目内容
(
单选题
)
437.当使用该组件前,需先进行特定的测试程序。

A、 Before you accept the unit, do the functional test procedure.

B、 Before you accept the unit, do the operational test procedure.

C、 Before you accept the unit, do the specified test procedure.

答案:C

噜啦啦噜啦噜啦啦啦啦啦啦1
655.Put a transparent sheet of plastic on the surface.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f16-faf8-c0f5-18fb755e8800.html
点击查看题目
134.Remove one of the four bolts.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-8538-c0f5-18fb755e8802.html
点击查看题目
414.Text shall be as brief and concise as practicable.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-9b68-c0f5-18fb755e8802.html
点击查看题目
160.所有的修改都要得到设计部门的批准。
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-ac48-c0f5-18fb755e8800.html
点击查看题目
677.调整倾斜仪,直到气泡在中心。
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f17-1e20-c0f5-18fb755e8801.html
点击查看题目
470.Move the lever rearward.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d5-7550-c0f5-18fb755e8800.html
点击查看题目
751.Preparation of Technical Data for certain chapters in the Maintenane
Manual require joint contribution and close coordination between the
manufacturer of the airframe and the manufacturer of various other
components used in making the completed airplane.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d7-1360-c0f5-18fb755e8800.html
点击查看题目
383.The maximum permitted difference is 5 mm.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-7458-c0f5-18fb755e8800.html
点击查看题目
204.当拉下低位的轴承时,可以看到低位的封圈。
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-eac8-c0f5-18fb755e8802.html
点击查看题目
473.A list of Page Effectivity should be provided in the front of each
Manual and can be combined with the Table of Contents, or in front of
each System/Chapter.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-f540-c0f5-18fb755e8801.html
点击查看题目
首页
>
在校教育
>
噜啦啦噜啦噜啦啦啦啦啦啦1
题目内容
(
单选题
)
手机预览
噜啦啦噜啦噜啦啦啦啦啦啦1

437.当使用该组件前,需先进行特定的测试程序。

A、 Before you accept the unit, do the functional test procedure.

B、 Before you accept the unit, do the operational test procedure.

C、 Before you accept the unit, do the specified test procedure.

答案:C

噜啦啦噜啦噜啦啦啦啦啦啦1
相关题目
655.Put a transparent sheet of plastic on the surface.

A.  在表面盖上一层塑料传输板。

B.  在表面放置塑料材料板。

C.  在表面覆盖一层透明的塑料膜。

https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f16-faf8-c0f5-18fb755e8800.html
点击查看答案
134.Remove one of the four bolts.

A.  拆卸一个螺栓。

B.  拆卸四个螺栓。

C.  拆卸四个螺栓中的一个。

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-8538-c0f5-18fb755e8802.html
点击查看答案
414.Text shall be as brief and concise as practicable.

A.  文本应尽可能简单易懂。

B.  文本可以尽量简单易懂。

C.  文本应该尽可能简明扼要。

https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-9b68-c0f5-18fb755e8802.html
点击查看答案
160.所有的修改都要得到设计部门的批准。

A.  all approval must be approved by the Design Authority.

B.  get approval for all modifications from the design authority.

C.  get approval for all modifications from the production authority.

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-ac48-c0f5-18fb755e8800.html
点击查看答案
677.调整倾斜仪,直到气泡在中心。

A.  Adjust the clinometer until the bubble is in the center.

B.  Adjust the thermometer until the bubble is in the center.

C.  Adjust the hygrometer until the bubble is in the center.

https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f17-1e20-c0f5-18fb755e8801.html
点击查看答案
470.Move the lever rearward.

A.  向前旋转手柄

B.  向后移动水平面

C.  向后移动手柄

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d5-7550-c0f5-18fb755e8800.html
点击查看答案
751.Preparation of Technical Data for certain chapters in the Maintenane
Manual require joint contribution and close coordination between the
manufacturer of the airframe and the manufacturer of various other
components used in making the completed airplane.

A.  维修手册中某些章节的技术资料的编写,需要机身制造商和用于制造整架飞机
的各种其他部件的制造商共同奉献和密切计划。

B.  维修手册中某些章节的技术资料的编写,需要机身制造商和整机其他各制造商
共同奉献和密切计划。

C.  维修手册中某些章节的技术资料的编写,需要机身制造商和用于制造整机的各
种其他部件的制造商共同合作和密切协调。

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d7-1360-c0f5-18fb755e8800.html
点击查看答案
383.The maximum permitted difference is 5 mm.

A.  最小允许误差 5 毫米。

B.  最大允许误差 5 毫米。

C.  最大容差 5 毫米。

https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-7458-c0f5-18fb755e8800.html
点击查看答案
204.当拉下低位的轴承时,可以看到低位的封圈。

A.  the lower seal comes into view when you pull the lower bearing down.

B.  The lower seal shows as the lower bearing is pulled down.

C.  The lower seal appears as the up bearing is pulled down.

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-eac8-c0f5-18fb755e8802.html
点击查看答案
473.A list of Page Effectivity should be provided in the front of each
Manual and can be combined with the Table of Contents, or in front of
each System/Chapter.

A.  应在每本手册的后面提供页面有效性列表,也可与目录结合,或在每个系统/
章节的前面。

B.  应在每本手册的前面提供页面有效性列表,也可与目录结合,或在每个系统/
章节的后面。

C.  应在每本手册的前面提供页面有效性列表,也可与目录结合,或在每个系统/
章节的前面。

https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-f540-c0f5-18fb755e8801.html
点击查看答案
试题通小程序
试题通app下载