APP下载
首页
>
在校教育
>
噜啦啦噜啦噜啦啦啦啦啦啦1
搜索
噜啦啦噜啦噜啦啦啦啦啦啦1
题目内容
(
单选题
)
90.Never Exceed Speed or Mach Number is the speed limit that may not be
exceeded at any time.

A、 Never Exceed Speed or Mach Number is the speed limit that can never
be exceeded at any time.

B、 Never Exceed Speed or Mach Number is the speed limitation that will
be excessivety at any time.

C、 Never Exceed Speed or Mach Number is the speed limit that may be
surpassed at any time.

答案:A

噜啦啦噜啦噜啦啦啦啦啦啦1
164.若必须靠近发动机排气口,做好耳朵防护措施。
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-b030-c0f5-18fb755e8801.html
点击查看题目
130.If there is no hydraulic power to extend the nose gear,the weight
of the gear and the airstream pushes the nose gear into the extended
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f14-0140-c0f5-18fb755e8800.html
点击查看题目
339.The adjustment test description shall provide instructions for
accomplishment of a test or check to assure the integrity as an
operational component of a system, subsystem or unit assembly.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d4-b5e8-c0f5-18fb755e8801.html
点击查看题目
473.A list of Page Effectivity should be provided in the front of each
Manual and can be combined with the Table of Contents, or in front of
each System/Chapter.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d5-7938-c0f5-18fb755e8801.html
点击查看题目
390.If you cannot push a needle or equivalent through the inspection hole,
then rod eye is deep enough.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-7c28-c0f5-18fb755e8800.html
点击查看题目
269.High-time airplanes, disassembled for major overhaul, were inspected
to assist in selecting inspection items.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d4-4c70-c0f5-18fb755e8802.html
点击查看题目
68.Such inserts in the text shall be short and concise and be used to
emphasize important and critical instructions.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-17d8-c0f5-18fb755e8801.html
点击查看题目
2.Wherever the CAP is directed to a specific part or component, It is
implied that the Inspection will include observation and evaluation of
the surrounding area of parts and equipment.
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d2-a2a8-c0f5-18fb755e8801.html
点击查看题目
707.Add a washer if necessary.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f17-4918-c0f5-18fb755e8802.html
点击查看题目
401.这项工作适用于垂直安装。
https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d5-0fc0-c0f5-18fb755e8800.html
点击查看题目
首页
>
在校教育
>
噜啦啦噜啦噜啦啦啦啦啦啦1
题目内容
(
单选题
)
手机预览
噜啦啦噜啦噜啦啦啦啦啦啦1

90.Never Exceed Speed or Mach Number is the speed limit that may not be
exceeded at any time.

A、 Never Exceed Speed or Mach Number is the speed limit that can never
be exceeded at any time.

B、 Never Exceed Speed or Mach Number is the speed limitation that will
be excessivety at any time.

C、 Never Exceed Speed or Mach Number is the speed limit that may be
surpassed at any time.

答案:A

噜啦啦噜啦噜啦啦啦啦啦啦1
相关题目
164.若必须靠近发动机排气口,做好耳朵防护措施。

A.  if you must go near the engine exhaust, use ear protection.

B.  if you must go to the engine exhaust, use ear protection.

C.  if it is necessary to approach the engine exhaust, do ear protection.

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-b030-c0f5-18fb755e8801.html
点击查看答案
130.If there is no hydraulic power to extend the nose gear,the weight
of the gear and the airstream pushes the nose gear into the extended
https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f14-0140-c0f5-18fb755e8800.html
点击查看答案
339.The adjustment test description shall provide instructions for
accomplishment of a test or check to assure the integrity as an
operational component of a system, subsystem or unit assembly.

A.  调节测试说明应提供完成测试或检查的指示,以确保作为系统、子系统或单
元组件的操作性部件的完整性。

B.  调整测试描述应该提供指导来完成测试或检查,来保证整个操作组件的系统、
子系统或组件装配。

C.  为确保整合系统、子系统和单元组件的运行,调整测试的说明应该提供指示
来完成测试或检查。

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d4-b5e8-c0f5-18fb755e8801.html
点击查看答案
473.A list of Page Effectivity should be provided in the front of each
Manual and can be combined with the Table of Contents, or in front of
each System/Chapter.

A.  应在每本手册的后面提供页面有效性列表,也可与目录结合,或在每个系统/
章节的前面。

B.  应在每本手册的前面提供页面有效性列表,也可与目录结合,或在每个系统/
章节的后面。

C.  应在每本手册的前面提供页面有效性列表,也可与目录结合,或在每个系统/
章节的前面。

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d5-7938-c0f5-18fb755e8801.html
点击查看答案
390.If you cannot push a needle or equivalent through the inspection hole,
then rod eye is deep enough.

A.  如果不能将针或校准销推入检查孔,则表示杆眼足够深。

B.  如果不能将针或检查销推入检查孔,则表示杆眼足够深。

C.  如果不能将针或类似物推入检查孔,则表示杆眼足够深。

https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f15-7c28-c0f5-18fb755e8800.html
点击查看答案
269.High-time airplanes, disassembled for major overhaul, were inspected
to assist in selecting inspection items.

A.  对于使用时间长的飞机,大修时分解进行检查,以协助选择检查项目。

B.  为了大修而拆卸的长时间使用飞机,应被检查以协助选择检查项目

C.  为了协助选择检查项目,应检查并拆卸使用时间长的飞机进行大修

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d4-4c70-c0f5-18fb755e8802.html
点击查看答案
68.Such inserts in the text shall be short and concise and be used to
emphasize important and critical instructions.

A.   文中此类插入语应简短明了并用于强调重要和关键的指示。

B.   文中此类插图应简单具体并用于强调重要和关键的指示。

C.   文中此类插入语必须简短明了并用于强调重要和批评性的指示。

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d3-17d8-c0f5-18fb755e8801.html
点击查看答案
2.Wherever the CAP is directed to a specific part or component, It is
implied that the Inspection will include observation and evaluation of
the surrounding area of parts and equipment.

A.   因 CAP 是针对特定的零件或部件,可得知检查将包括对零件和设备周围区域
的观察和评估。

B.   由于 CAP 是针对特定的零件或部件,可推测出检查将包括对零件和设备周围
区域的观察和评估。

C.   只要 CAP 是针对特定的零件或部件,就意味着检查将包括对零件和设备周围
区域的观察和评估。

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d2-a2a8-c0f5-18fb755e8801.html
点击查看答案
707.Add a washer if necessary.

A.  按需增加一个螺帽。

B.  如果必要,增加一个垫圈。

C.  必须增加一个垫圈。

https://www.shititong.cn/cha-kan/shiti/0005f3d5-4f17-4918-c0f5-18fb755e8802.html
点击查看答案
401.这项工作适用于垂直安装。

A.  This work is applicable to horizontal installations.

B.  This work is applicable to direction installations.

C.  This work is applicable to vertical installations.

https://www.shititong.cn/cha-kan/shiti/0005f3fe-c6d5-0fc0-c0f5-18fb755e8800.html
点击查看答案
试题通小程序
试题通app下载