A、 See the graphics for information of the solenoid valves which shall contain a note indicating the position
of the valve(weather spring-loaded to its open or closed position).
B、 Solenoid valves indicated on the schematic shall have a notation indicating when the valve shall be
spring-loaded to the open or closed position.
C、 Solenoid valves shall be indicated on the schematic and shall include a notation indicating whether the valve is spring-loaded to the open or closed position.
答案:C
A、 See the graphics for information of the solenoid valves which shall contain a note indicating the position
of the valve(weather spring-loaded to its open or closed position).
B、 Solenoid valves indicated on the schematic shall have a notation indicating when the valve shall be
spring-loaded to the open or closed position.
C、 Solenoid valves shall be indicated on the schematic and shall include a notation indicating whether the valve is spring-loaded to the open or closed position.
答案:C
A. 应描述系统中每个组件的功能、操作以及位置。
B. 系统中每个组件的目的、操作应和位置一样被描述。
C. 系统中每个组件的功能和构成应被描述得和位置一样好。
A. Grab a plier to release the clips.
B. Grab a screwdriver to release the bolts.
C. Grab a screwdriver to release the clips.
A. 每本手册都应有一份“飞机称重表格”,其中包括飞机剖面图,显示称重点的位置(使用顶升点或起落架)。
B. 飞机称重表格”应包含在每本手册中,其中包括飞机平面图,显示称重点相对基准线的位置(使用顶升点或底盘)。
C. 每本手册都应有一份“飞机称重表格”,其中包括飞机侧视图,显示称重点相对基准线的位置(使用顶升点或起落架)。
A. 尽管飞机在生产是已经强调了技术文件的作用,在实际使用 ABC 会继续提供必要的支持,厂方会一直保持
对维修技术和零部件方面的支持
B. 尽管飞机在生产完成出厅,在技术文体方面给子了技术支持,当飞机投入实际使用中,ABC 还将+直保持
对维修技术和零部件方前的支持
C. 尽管本文件中提到的飞机已经停产,ABC/将按照我们规定的公司政策一如既往地支持它们、厂方在规定的
政策范围内保持技术支持和零部件支持
A. 如燃油面涨到通气油箱高度,则燃油将从通风口中排出。
B. 如燃油水平在通气油箱有充足高度,则燃油将从通风扇中排出。
C. 如燃油油位在通气油箱中足够高,则燃油将从通风扇中排出。
A. The fragile connector is usually closed. 易碎连接器通常是闭合的
B. The quick-break switch is normally in the off position.
C. The frangible fitting is a normally closed valve.
A. 用真空清洁器和刷子清洁设备的内部及其底座。
B. 用真空清洁器和刷子清洁设备的外表面以及安装架。
C. 真空清洁设备及硬件设施的表面涂层。
A. Be careful when you put your hand onto printed circuit boards.
B. Be careful when you get close to printed circuit boards.
C. Be careful when you remove printed circuit boards.
A. Remove the sleeve to tighten the sliding tube.
B. Remove the sleeve to install the sliding tube
C. Remove the sleeve to free the sliding tube.
A. 在左边空白处用黑色垂直线或用“手形指示”来标记确定插图的修改部分。
B. 用与修改部分相对的左边空白处的黑色垂直线或用“手形指示”来确定插图的修改。
C. 用左边空白处的黑色水平方向直线或用“手形指示”来确定插图的修改。