776、停止发动机启动程序。
A. Stop the engine run-up practice.
B. Stop the engine start procedure
C. Stop the engine ignition project.
https://www.shititong.cn/cha-kan/shiti/0005f400-4318-5a00-c0f5-18fb755e8802.html
点击查看答案
114、不锈钢接触镁、铝或镉金属时会导致它们腐蚀。
A. CRES causes magnesium, aluminum, or cadmium to corrode when it touches these metals.
B. Stainless steel corrodes once touching magnesium, aluminum or chromium metals.
C. Magnesium, aluminum, or chromium metals shall be protected from the corrosion caused by CRES.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-2a79-cbd0-c0f5-18fb755e8801.html
点击查看答案
807、Drains let fuel in the vent system return to the tanks
A. 排放管使通风系统的燃油返回油箱。
B. 将从排气系统返回油箱的燃油排出。
C. 排放通风系统里剩余燃油返回油箱。
https://www.shititong.cn/cha-kan/shiti/0005f3d5-2a7d-9878-c0f5-18fb755e8801.html
点击查看答案
928、Keep personnel away from the a aircraft when the thrust reverser deploys.
A. 当反推收回时,确保飞机远离人员
B. 当反推放出时,确保人员远离飞机
C. 当反推运动时,确保人员远离飞机
https://www.shititong.cn/cha-kan/shiti/0005f400-4319-2520-c0f5-18fb755e8802.html
点击查看答案
1129、Continuing Airworthiness Program Inspections usually consist of two
pages one text page and one illustration page.
A. 、持续权威程序测试通常由两页组成、 一个文本页和一个图解页
https://www.shititong.cn/cha-kan/shiti/0005f400-431a-cb00-c0f5-18fb755e8802.html
点击查看答案
355、 Adjust the linkage again after the inspection.
A. 检查后再次拉长连杆。
B. 测试后再次移动连杆。
C. 检查后再次调节连杆
https://www.shititong.cn/cha-kan/shiti/0005f3d5-2a7b-2390-c0f5-18fb755e8802.html
点击查看答案
230、lf you do not install the rigging pin, the elevators will move down when there is no pressure in the
system.
如果不安装索具销,电梯将在系统没有压力时向下移动。
A. After the system is pressurized, the elevators will drop down no matter where the rigging pin is installed.
B. Without the rigging pin, the elevators will go down when there is no pressure in the system.
C. The rigging pin can prevent
de-energized.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-2a7a-77b0-c0f5-18fb755e8802.html
点击查看答案
1052、To establish the basis for those item s to be included, the following assumptions have been made.
为了确定列入这些项目的基础,我们作了下列假设。
A. To found the basis for those items, the following conceptions have been made.
https://www.shititong.cn/cha-kan/shiti/0005f400-431a-6570-c0f5-18fb755e8802.html
点击查看答案
1197、 Print all pages except wiring diagrams and foldouts on both sides.
A. 双面打印除线路图和折页外的所有页。
B. 双面打印除线路图外的所有折页。
C. 除了折叠的线路图外,双面打印所有页面。
https://www.shititong.cn/cha-kan/shiti/0005f3d5-2a7f-caf8-c0f5-18fb755e8802.html
点击查看答案
261、此步骤仅适用于包括极少量铆钉的修理。
A. This procedure is only for repairs that include a very small number of screws.
B. This procedure is only for repairs that include a very small number of nuts.
C. This procedure is only for repairs that include a very small number of rivets.
https://www.shititong.cn/cha-kan/shiti/0005f3d5-2a7a-a2a8-c0f5-18fb755e8801.html
点击查看答案