APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
124. Blind rivet is a special rivet used in a sheet metal structure that can be installed when there is access to only one side of the metal

A、 Blind rivet is a special rivet used in a sheet metal structure that can be installed when either side of the metal can get access to.

B、 Blind rivet is a special rivet used in a sheet metal structure that can be installed when neither side of the metal can get access to.

C、 Blind rivet is used in a sheet metal structure because there is not enough space to both sides of the metal.

答案:C

设备系统操作理论翻译
1410. Care must be taken not to damage the firewall cover
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-09c6-c0b8-ef8d402da900.html
点击查看题目
1826. The Hydraulic Power Transfer Unit system is a hydraulic motor-pump assembly that supplies alternative pressure to leading edge flaps and slats and auto slat system if system B is de-pressurized
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-c2e4-c0b8-ef8d402da900.html
点击查看题目
2373. In designing schematic diagrams, it may be necessary to compromise between detail that is necessary to make the diagram self-explanatory, and simplicity that is essential for ease of reading and understanding
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44be-a3e0-c0b8-ef8d402da900.html
点击查看题目
2647. When it is necessary to order any wire bundles from Boeing, operators should provide the base wire bundle number (61-30396 in this case) and tail number of the airplane where the bundle is to be installed on
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-3f90-c0b8-ef8d402da900.html
点击查看题目
2004. 该规范给出了继电器、二极管和系统其他部件的符号。
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-9946-c0b8-ef8d402da900.html
点击查看题目
393. A list of Page Effectivity should be provided in the front of each Manual and can be combined with the Table of Contents,or in front of each System/Chapter
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-3dbf-c0b8-ef8d402da900.html
点击查看题目
1957. Remove the rigging pins and equipment that prevent free movement of the control surfaces
https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-924f-c0b8-ef8d402da900.html
点击查看题目
2328. The distribution system has these functions
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bd-e635-c0b8-ef8d402da900.html
点击查看题目
204. An “emergency” however, almost always involves a failure that requires immediate and rapid response, such as a total powerplant failure, fire or smoke, or rapid cabin decompression
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-b503-c0b8-ef8d402da900.html
点击查看题目
1306. Located in the flange connecting the generator and drive assemblies, ports make oil flow between the constant speed drive and the generator possible
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-61a5-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

124. Blind rivet is a special rivet used in a sheet metal structure that can be installed when there is access to only one side of the metal

A、 Blind rivet is a special rivet used in a sheet metal structure that can be installed when either side of the metal can get access to.

B、 Blind rivet is a special rivet used in a sheet metal structure that can be installed when neither side of the metal can get access to.

C、 Blind rivet is used in a sheet metal structure because there is not enough space to both sides of the metal.

答案:C

设备系统操作理论翻译
相关题目
1410. Care must be taken not to damage the firewall cover

A. 必须要注意不要损坏防火墙罩。

B. 小心损坏火墙盖子

C. 核心必须要带走以不损坏防火墙罩。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-09c6-c0b8-ef8d402da900.html
点击查看答案
1826. The Hydraulic Power Transfer Unit system is a hydraulic motor-pump assembly that supplies alternative pressure to leading edge flaps and slats and auto slat system if system B is de-pressurized

A. 如果B系统释压,液压动力传感组件系统就是一个提供备用压力到前缘襟翼和缝翼以及自动缝翼系统的液压马达泵组件。

B. 液压动力转换组件系统是一个液压马达泵组件,在系统B释压时,为前缘襟翼和缝翼以及自动缝翼系统提供备用压力。

C. 如果B系统增压,液压动力传感组件系统就是一个提供备用压力到前缘襟翼和缝翼以及自动缝翼系统的液压马达泵组件。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-c2e4-c0b8-ef8d402da900.html
点击查看答案
2373. In designing schematic diagrams, it may be necessary to compromise between detail that is necessary to make the diagram self-explanatory, and simplicity that is essential for ease of reading and understanding

A. Schematic diagram designers may make a compromise so as to add more details to make the diagram self-explanatory and keep its simplicity at the same time for ease of reading and understanding.

B. In designing schematic diagrams, It may be necessary to pay attention to both detail that is necessary to make the diagram self-explanatory and simplicity that is essential for ease of reading and understanding.

C. Detail makes the diagram self-explanatory. Simplicity makes it easy to read and understand is necessary to consider both of them and make a compromise if needed when designing schematic diagrams.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44be-a3e0-c0b8-ef8d402da900.html
点击查看答案
2647. When it is necessary to order any wire bundles from Boeing, operators should provide the base wire bundle number (61-30396 in this case) and tail number of the airplane where the bundle is to be installed on

A. If ordering any wire bundles from Boeing is mandatory, operators has the right to purchase the bundles from other supplier and ask them to provide the base wire bundle number (61-30396in this case) and tail number of the airplane.

B. It is a necessity for the operators to provide the base wire bundle number (61-30396 in this case) and tail number of the airplane on which the bundle is to be installed if ordering any wire bundles from Boeing is necessary.

C. Operators should provide the number (61-30396 in this case) of the airplane where the bundles are to be installed on if ordering any wire bundles from Boeing is necessary.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-3f90-c0b8-ef8d402da900.html
点击查看答案
2004. 该规范给出了继电器、二极管和系统其他部件的符号。

A. The specification gives the symbols for relays, diodes, and other parts of the system.

B. The specification gives the requirement for markings on relay, triode and other parts of the system.

C. The specification excludes symbols for relays, diodes, and other system parts.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-9946-c0b8-ef8d402da900.html
点击查看答案
393. A list of Page Effectivity should be provided in the front of each Manual and can be combined with the Table of Contents,or in front of each System/Chapter

A. 应在每本手册的后面提供页面有效性列表,也可与目录结合,或在每个系统/章节的前面。

B. 应在每本手册的前面提供页面有效性列表,也可与目录结合,或在每个系统/章节的后面。

C. 应在每本手册的前面提供页面有效性列表,也可与目录结合,或在每个系统/章节的前面。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-3dbf-c0b8-ef8d402da900.html
点击查看答案
1957. Remove the rigging pins and equipment that prevent free movement of the control surfaces

A. 拆除校装销和设备,以阻止控制舵面的自由运动

B. 拆除校装销,安装能够阻止控制舵面自由移动的设备

C. 拆除能够阻止控制舵面自由运动的校装销和设备

https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-924f-c0b8-ef8d402da900.html
点击查看答案
2328. The distribution system has these functions

A. 供给系统有这些用处。

B. 分散系统有这些功能。

C. 分配系统有这些功能。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bd-e635-c0b8-ef8d402da900.html
点击查看答案
204. An “emergency” however, almost always involves a failure that requires immediate and rapid response, such as a total powerplant failure, fire or smoke, or rapid cabin decompression

A. 不论怎样的“危机”大多数总是会出现需要马上快速反应的故障,比如全动力故隐着火或烟雾,或者客舱的快速释压。

B. 可是一个“危急情况”几乎总伴随着故障,需要立即快速反馈,比如一个动力装置故障,着火或烟雾,或快速客舱减压。

C. 然而,”紧急情况”几乎总是涉及需要立即和快速响应的故障如整个动力装置失效,火灾或烟雾,或座舱快速失压。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-b503-c0b8-ef8d402da900.html
点击查看答案
1306. Located in the flange connecting the generator and drive assemblies, ports make oil flow between the constant speed drive and the generator possible

A. 位于连接发电机和驱动组件的法兰上的端口,使滑油在恒定转速驱动器和可用发电机之间流动。

B. 位于连接发电机和驱动组件的连接处的端口,使滑油产生了在变速驱动器和发电机之间流动的可能性。

C. 端口位于连接发电机和驱动组件的法兰上,使滑油可以在恒速驱动器和发电机之间流动。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-61a5-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载