APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
313. Make sure that the warning light comes on in less than 3 seconds

A、 Make sure that the warning light turns on within 3 seconds.

B、 Make sure that the warning light is on for at least 3 seconds.

C、 Make sure that the warning light is turned on in no more than 3 seconds.

答案:C

设备系统操作理论翻译
3040. You can gain access to the machinery by removing the cover
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-6122-c0b8-ef8d402da900.html
点击查看题目
924. Tank unit capacitance varies as a function of the fuel level in the tank
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-550a-c0b8-ef8d402da900.html
点击查看题目
1765. When you get access to the rear fuselage through the access panel, don’t use APU line
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-fcb8-c0b8-ef8d402da900.html
点击查看题目
965. Identify revisions, additions and deletions by a vertical line along the outside of the page opposite only that portion of the printed matter that was changed Identify a revision to an illustration with a vertical line in the left margin opposite the revised portion Show the date of the revision on each revised page
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-db5e-c0b8-ef8d402da900.html
点击查看题目
2630. 三台电脑收集数据并且汇集数据链到显示组件。
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69cf-e01a-c0b8-ef8d402da900.html
点击查看题目
1931. 你可以从ABC的经销商或工厂的客户服务代表那里获得适当的表格副本和需要填写的条目的说明。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-115b-c0b8-ef8d402da900.html
点击查看题目
2611. 若为活页,则每一页应注明修订日期和生效日期,或以其他方式标识修订状态
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69cf-a5ba-c0b8-ef8d402da900.html
点击查看题目
2665. 根据标准施工手册及AMM更换了机身站位360处损坏的卡箍,消除了导线束与该处地板梁切口相磨的情况。
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-7a07-c0b8-ef8d402da900.html
点击查看题目
2463. This section gives you the procedures for the disassembly
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-c084-c0b8-ef8d402da900.html
点击查看题目
579. Wire the cable to the structure
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3e-c9b5-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

313. Make sure that the warning light comes on in less than 3 seconds

A、 Make sure that the warning light turns on within 3 seconds.

B、 Make sure that the warning light is on for at least 3 seconds.

C、 Make sure that the warning light is turned on in no more than 3 seconds.

答案:C

设备系统操作理论翻译
相关题目
3040. You can gain access to the machinery by removing the cover

A. 可以通过拆下保护盖来接近机械装置

B. 重新安装保护盖来接近机械装置

C. 拆下保护盖来获得机器

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-6122-c0b8-ef8d402da900.html
点击查看答案
924. Tank unit capacitance varies as a function of the fuel level in the tank

A. Tank unit capacitance changes with the fuel level in the tank.

B. Tank unit capacitance changes the function of the fuel level in the tank.

C. A function of the fuel level in the tank is varied by tank unit capacitance.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-550a-c0b8-ef8d402da900.html
点击查看答案
1765. When you get access to the rear fuselage through the access panel, don’t use APU line

A. Don't handle the APU line, when you get close to the back fuselage

B. When you enter into the front fuselage through the access door, don't touch the APU line

C. Don't hold the APU line when you ap roach the aft fuselage through the access panel

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67e-fcb8-c0b8-ef8d402da900.html
点击查看答案
965. Identify revisions, additions and deletions by a vertical line along the outside of the page opposite only that portion of the printed matter that was changed Identify a revision to an illustration with a vertical line in the left margin opposite the revised portion Show the date of the revision on each revised page

A. Use a vertical line along the outside of the page to mark changes, additions, and deletions. Underline only the parts that was changed. Changes to the illustration are also identified with a vertical line to the left of the changed content. Every change should be dated.

B. Use a vertical line along the outside of the page to mark alterations, additions and deletions. Only changes are marked by a vertical line. Use a vertical line in the left margin of the illustration to indicate the changes. Every page should be dated for revision.

C. A vertical line along the outside of the page indicates that the content has been changed, added, and removed. Mark special parts that have been changed. Changes to the illustration can be indicated directly with a vertical line to the left of the content. Every date should be updated.

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b43-db5e-c0b8-ef8d402da900.html
点击查看答案
2630. 三台电脑收集数据并且汇集数据链到显示组件。

A. Three computers collect data and put them together on the data link to the display unit.

B. Three computers collect data and put them together on the data upload to the display unit

C. Three computers collect data and put them together on the data conveyed to the display unit.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69cf-e01a-c0b8-ef8d402da900.html
点击查看答案
1931. 你可以从ABC的经销商或工厂的客户服务代表那里获得适当的表格副本和需要填写的条目的说明。

A. Copies of the appropriate forms and a description of the entries to be completed are available to you from an ABC dealer or factory Customer Service Representative.

B. Copies of the proper forms and a description of the items to be completed are available to you from an ABC trader or Production Customer Service Representative.

C. The ABC trader or Production Customer Service Representative could provide the proper form copies and the description of the items to be accomplished available.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-115b-c0b8-ef8d402da900.html
点击查看答案
2611. 若为活页,则每一页应注明修订日期和生效日期,或以其他方式标识修订状态

A. If the manual is loose-leaf, each page should contain the date and effective revision date when revised, or otherwise be identified as to revision status.

B. If the manual is loose-leaf, each page should contain the date and effective revision reason when revised, or otherwise be identified as to revision status.

C. If the manual is loose-leaf, each page should contain the reason and effective revision date when revised, or otherwise be identified as to revision status.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69cf-a5ba-c0b8-ef8d402da900.html
点击查看答案
2665. 根据标准施工手册及AMM更换了机身站位360处损坏的卡箍,消除了导线束与该处地板梁切口相磨的情况。

A. Replace broken clamp with new clamp with reference to standard practices and AMM and relieve rubbing with the bundle at floor bar cut at body station 360.

B. Replaced broken clamp with a new clamp diminishing rubbing at floor beam cutout at body station 360 with reference to standard practices and AMM.

C. According to the standard practices and AMM, the damaged clamp at the body station360 was replaced to eliminate the friction between the wire bundle and the cutout of the floor beam at this place.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-7a07-c0b8-ef8d402da900.html
点击查看答案
2463. This section gives you the procedures for the disassembly

A. This procedure gives you the disassembly process.

B. You can find the procedures for disassembling in this section.

C. The assembly process can be found in this section.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-c084-c0b8-ef8d402da900.html
点击查看答案
579. Wire the cable to the structure

A. Attach the cable to the structurewith wire;

B. Make the wire and cable parallel to the structure;

C. Connect the wire of the cable to the structure;

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3e-c9b5-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载