APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
620. Do test B as an alternative to test A

A、 Alternatively, you can do test B.

B、 Test A is irreplaceable.

C、 Test A is the equivalent of test B.

答案:A

设备系统操作理论翻译
36. Do not let the cable touch the floor and make sure the floor is not wet
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf3-a09a-c0b8-ef8d402da900.html
点击查看题目
1974. 等第一层油漆完全干透后再涂第二层。
https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-cacb-c0b8-ef8d402da900.html
点击查看题目
1873. 利用简化的原理图和图纸来解释系统的操作方法,包括使用过程中的警告装置和控制特点
https://www.shititong.cn/cha-kan/shiti/0009ffad-f680-596e-c0b8-ef8d402da900.html
点击查看题目
193. Mechanical power is produced by electric motors that are mainly used to drive pumps, for example, fuel and hydraulic pumps or to drive a vale to the commanded position in the fuel hydraulic or air conditioning system or to move mechanical parts like doors and cargo containers
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-920c-c0b8-ef8d402da900.html
点击查看题目
102. 因此,词组中的单词越多,理解起来就越困难
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-7531-c0b8-ef8d402da900.html
点击查看题目
1540. The table of contents in front of each chapter will list the items covered and the numbers assigned
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-2161-c0b8-ef8d402da900.html
点击查看题目
1462. The purpose of STE is to give technical writers guidelines on how to write technical texts in a clear, simple and unambiguous manner that readers throughout the world will find easy to understand
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-aa92-c0b8-ef8d402da900.html
点击查看题目
1197. 这些维护程序仅适用于主起落架。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-054f-c0b8-ef8d402da900.html
点击查看题目
330. Schedule the check of the tires at regular intervals
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-7692-c0b8-ef8d402da900.html
点击查看题目
1323. 如果由于腐蚀而无法拆卸螺栓,则使用渗透油。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-9742-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

620. Do test B as an alternative to test A

A、 Alternatively, you can do test B.

B、 Test A is irreplaceable.

C、 Test A is the equivalent of test B.

答案:A

设备系统操作理论翻译
相关题目
36. Do not let the cable touch the floor and make sure the floor is not wet

A. keep the cable hit the floor and make sure the floor is dry

B. Let the cable above the floor and assure the floor is moist

C. Do not let the cable touch the floor and make sure the floor is not moist

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf3-a09a-c0b8-ef8d402da900.html
点击查看答案
1974. 等第一层油漆完全干透后再涂第二层。

A. Wait for the paint to dry completely before polishing it again.

B. Do not apply the second layer of paint if the first layer has dried thoroughly.

C. Let the first layer of paint dry fully before you apply the second layer.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-cacb-c0b8-ef8d402da900.html
点击查看答案
1873. 利用简化的原理图和图纸来解释系统的操作方法,包括使用过程中的警告装置和控制特点

A. Making use of simplified schematics and drawings explain how this system operates, including warning devices and control features in use.

B. Use schematics and drawings as briefly explain the operation of the system, including warning devices and control features in use.

C. The simplified diagrams and drawings are the indication of the system operation including warning devices and control features in use.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f680-596e-c0b8-ef8d402da900.html
点击查看答案
193. Mechanical power is produced by electric motors that are mainly used to drive pumps, for example, fuel and hydraulic pumps or to drive a vale to the commanded position in the fuel hydraulic or air conditioning system or to move mechanical parts like doors and cargo containers

A. You can use electric motors to drive fuel and hydraulic pumps or to drive a valve to the commanded position in the fuel. hydraulic or air conditioning system or to move doors and cargo containers

B. Electric motor can drive fuel and hydraulic pumps or drive a valve to the commanded position in the fuel. hydraulic or air conditioning system or move mechanical parts like doors and cargo containers to produce mechanical power

C. Electric motor produce mechanical power and their main functions are to drive fuel and hydraulic pumps, to drive a valve to the commanded position and to move mechanical parts like doors and cargo containers

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-920c-c0b8-ef8d402da900.html
点击查看答案
102. 因此,词组中的单词越多,理解起来就越困难

A. Thus, the more words there are in a cluster, the more difficult it is to understand.

B. Therefore, the more words are there in a phrase, the more difficult it is to understand.

C. So, the more nouns in a phrase, the harder it is to understand.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-7531-c0b8-ef8d402da900.html
点击查看答案
1540. The table of contents in front of each chapter will list the items covered and the numbers assigned

A. 前面的每章目录将列出大量的项目和分配的数字。

B. 每章前面的目录将列出涵盖的项目和分配的编号。

C. 每章前面的内容将列出覆盖的项目和制定的编号。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-2161-c0b8-ef8d402da900.html
点击查看答案
1462. The purpose of STE is to give technical writers guidelines on how to write technical texts in a clear, simple and unambiguous manner that readers throughout the world will find easy to understand

A. The aim of STE is that readers all over the world can easily understand the technical texts and that writers who are responsible for preparing technical texts know how to prepare them in a easy method.

B. The objective of STE is to provide writers with general principles on how to prepare technical documents in a clear, simple and distinct manner That readers all over the world can easily understand.

C. The function of STE is to describe how to prepare technical texts in a easy. Clear and specific way and to allow readers all over the world to understand difficultly.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d7-aa92-c0b8-ef8d402da900.html
点击查看答案
1197. 这些维护程序仅适用于主起落架。

A. These procedures are applied to the nose landing gear only when maintained;

B. These procedures are used to maintain the main landing gear only;

C. These maintenance procedures are applicable to the main landing gear only;

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-054f-c0b8-ef8d402da900.html
点击查看答案
330. Schedule the check of the tires at regular intervals

A. Check the tires at regular period;

B. Check and replace tires at regular intervals;

C. Schedule the inflation of the tires at regular intervals;

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf7-7692-c0b8-ef8d402da900.html
点击查看答案
1323. 如果由于腐蚀而无法拆卸螺栓,则使用渗透油。

A. If you cannot remove a nut because of corrosion, apply penetrating oil.

B. If you cannot disassembly a bolt because of corrosion, use penetrating oil.

C. If you cannot remove a bolt because of corrosion, apply penetrating oil.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-9742-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载