A、 按要求把喷射器组件的接头安装在APU进气道内。
B、 按要求把作动器组件的喷嘴安装在APU进气道内。
C、 按要求把喷射器组件的喷嘴安装在APU进气道内。
答案:C
A、 按要求把喷射器组件的接头安装在APU进气道内。
B、 按要求把作动器组件的喷嘴安装在APU进气道内。
C、 按要求把喷射器组件的喷嘴安装在APU进气道内。
答案:C
A. The airline operator is irresponsible for ensuring that all airworthiness instructions are complied with and that the handing, servicing and maintenance of the airplane is done when required and according to the Federal Aviation Regularities.
B. The operator is responsible for ensuring that all airworthiness directives are observed and that the handling, servicing and maintenance of the airplane is done when required and in accordance with the Federal Aviation Regularities.
C. The operator has the duty ensuring that all airworthiness directives are compiled with and the handling, servicing and maintenance of the airplane is performed when needed and in accordance with the Federal Aviation Regularities.
A. to arrive at the incorrect value, set the switch to position 2
B. to get the correct value, set the switch to position 2
C. to get the incorrect value, set the switch to position 2
A. defects
B. Leakage
C. abrasive
A. For more information, refer as official reference books.
B. For more information, refer to official reference books.
C. More information referred to official reference books.
A. Do not enter the engine test area without approval.
B. Do not make entrance to the engine test area without approval.
C. Do not go into the engine test area without approval.
A. Examine the transformer of the floor panel.
B. Examine if the floor panel is laminated.
C. Examine the floor panel for deformation.
A. Not only the basic principle of the reciprocating engine is simple, and also the assembly.
B. The basic principle of a jet engine is simple, and so is its construction.
C. The basic principle of the propeller driven engine is simple, as well as the installation.
A. Put the end of the rod that has a screw pattern in the fitting.
B. Put the end of the rod that has a thread in the fitting.
C. Put the end of the rod that has a screw driver in the fitting.
A. Check the bypass valves.
B. Close the isolating valves.
C. Inspect the check valves.
A. 对裸露的金属区域进行临时保护。
B. 对铁质金属区域进行必要保护。
C. 对有色金属区域涂抹临时保护涂层。