A、 Functional test is the determination that a system or component performs the required procedures in all respects accordance with the minimum acceptable system or component design specifications.
B、 Functional test is that procedure required to ascertain that a system or unit is functioning in all aspects in accordance with minimum acceptable system or unit design specifications.
C、 Functional testing is the procedure requested to determine that a system or component operates in all respects according to the minimum unsanctioned system or component design specification.
答案:B
A、 Functional test is the determination that a system or component performs the required procedures in all respects accordance with the minimum acceptable system or component design specifications.
B、 Functional test is that procedure required to ascertain that a system or unit is functioning in all aspects in accordance with minimum acceptable system or unit design specifications.
C、 Functional testing is the procedure requested to determine that a system or component operates in all respects according to the minimum unsanctioned system or component design specification.
答案:B
A. Rapidly and fully retract ram air turbine and make sure that it doesn't attach to other parts
B. Slowly and fully extend the RAT and make sure that it does not touch other parts.
C. Make sure that the ram air turbine is completely opened and it doesn't touch the other unit
A. The emergency call pushbutton on the overhead panel may be pressed in order to start an emergency call from the cockpit. This starts a communication between the cockpit and all cabin stations on a special link.
B. The emergency call pushbutton on the overhead panel must be pressed in order to initiate an emergency call from the cockpit. This initiates a communication between the cockpit and all cabin stations on a common link.
C. The urgent call pushbutton on the overhead panel must be pushed in order to initiate an urgent call from the cockpit. This initiates a communication between the cockpit and all cabin stations on a common connect.
A. 注释会引起注意方式方法,这个能让工作更简单,或者提供说明或者注释信息的方法。
B. 注释提醒注意使工作更容易的方法,或提供说明或额外解释信息的方法。
C. 注释提醒注意使工作更容易的方法,或提供补充或解释信息的方法。
A. As only approved limitations may be excluded in this Section,an introductory statement to this effect shall be contained in a prefatory note or the opening paragraph.
B. An introductory statement to this effect included in a prefatory note or the opening paragraph,that only approved limitations may be included in this Section.
C. Due to only approved limitations may be included in this Section,an introductory statement to this effect shall be included in a prefatory note or the opening paragraph.
A. 建立单独的导线标识码,以组建追踪电路(如图5)
B. 建立单独的导线标识码,以协助追踪电路(如图5)
C. 建立单独的导线标识码,以装配追踪电路(如图5)
A. The specification includes miscellaneous FAA regulations.
B. The specification is involved in numerical FAA regulations.
C. The specification refers to various FAA regulations.
A. 缠紧卷轴上的发条
B. 将胶带缠绕在卷筒上。
C. 将胶带粘贴在线圈上。
A. In 'shared interest' chapters for description and operation and system troubleshooting, the airframe manufacturer's masthead only shall be used; however, for unit troubleshooting and maintenance practices, both the airframe and component manufacturer's masthead may be used.
B. In 'shared interest' chapters for description and operation and system troubleshooting, It is recommended to use the masthead of the airframe manufacturer; however, for unit troubleshooting and maintenance practices, either the airframe or component manufacturer's masthead may be used.
C. In 'shared interest' chapters for description and operation and system troubleshooting, the airframe manufacturer's masthead only shall be used; however, for unit troubleshooting and maintenance practices, either the airframe or component manufacturer's masthead may be used.
A. This CAP has been developed according to FAA AC 91-56 guidelines.
B. FAA AC 91-56 guideline developed the CAP accordingly.
C. This CAP has been developed as a reference of FAA AC 91-56.
A. This section must provide the corresponding structural inspection procedures required for each mandatory replacement time, structural inspection interval and type qualification.
B. This section must list the relevant structural inspection procedures required for each mandatory replacement time, structural inspection interval and model qualification validation.
C. This section must set forth each mandatory replacement time, structural inspection interval, and related structural inspection procedure required for type certification.