APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
1071. Loosen the nut one full turn

A、 把螺帽拧松1圈

B、 拧紧螺帽半圈

C、 拧紧螺帽1圈

答案:A

设备系统操作理论翻译
2924. Prevent movement of the components when you repair the unit
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-e323-c0b8-ef8d402da900.html
点击查看题目
143. Make sure the sealant is continuously squeezed out along the edges of the contact surfaces
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-f275-c0b8-ef8d402da900.html
点击查看题目
3188. Potable water system is used to provide drinking water and waste water storage
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-33d1-c0b8-ef8d402da900.html
点击查看题目
2685. Airplanes modified by STC are not the responsibility of ABC
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-bb5a-c0b8-ef8d402da900.html
点击查看题目
3093. 把下列件号按照数字顺序排列
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-092d-c0b8-ef8d402da900.html
点击查看题目
2026. The ground cable letter N shall be used as a suffix to the wire identification code to identify any wire or cable that completes the circuit to the ground network
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-e3ad-c0b8-ef8d402da900.html
点击查看题目
1025. If the shear pin breaks, do an inspection of the towbar
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d1-7847-c0b8-ef8d402da900.html
点击查看题目
2131. 本部分测试的目的足为工作提供指导。
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bb-6f23-c0b8-ef8d402da900.html
点击查看题目
2972. Do not tighten the bolts with too much force
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d4-a514-c0b8-ef8d402da900.html
点击查看题目
443. The dust cap on the air charging valve is removed, the external air source is connected to the valve stem and the swivel nut turned to open the air charging valve
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-d7ff-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

1071. Loosen the nut one full turn

A、 把螺帽拧松1圈

B、 拧紧螺帽半圈

C、 拧紧螺帽1圈

答案:A

设备系统操作理论翻译
相关题目
2924. Prevent movement of the components when you repair the unit

A. 防止部件移动以使能修理装置

B. 当你修理部件时要避免部件运动

C. 当你修理组件时应防止部件移动

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d3-e323-c0b8-ef8d402da900.html
点击查看答案
143. Make sure the sealant is continuously squeezed out along the edges of the contact surfaces

A. 确保密封剂被完全挤出接触面边缘。

B. 确保沿接触面边缘待续涂抹封严胶。

C. 确保封严胶沿接触面边缘不断挤出

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-f275-c0b8-ef8d402da900.html
点击查看答案
3188. Potable water system is used to provide drinking water and waste water storage

A. 饮用水系统是用于回收和提供污水的.

B. 便携式水系统是用于储藏饮用水和污水的;

C. 饮用水系统是用于提供饮用水和存储污水的;

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-33d1-c0b8-ef8d402da900.html
点击查看答案
2685. Airplanes modified by STC are not the responsibility of ABC

A. The responsibility of ABC is not to modify the airplanes that belong to STC.

B. It is not STC's responsibility to modify ABC's aircraft.

C. ABC is not in charge of the aircraft modified by STC.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-bb5a-c0b8-ef8d402da900.html
点击查看答案
3093. 把下列件号按照数字顺序排列

A. Put the following serial numbers in numerical order;

B. Arrange the following part numbers in numerical order;

C. Arrange the following part numbers in alphanumeric order;

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-092d-c0b8-ef8d402da900.html
点击查看答案
2026. The ground cable letter N shall be used as a suffix to the wire identification code to identify any wire or cable that completes the circuit to the ground network

A. 接地电缆字母N应用作电线识别码的标识,以识别完整的接地电网中的任何电线或电缆;

B. 接地电缆字母N应用作电线识别码的后缀,以识别完成接地电网的任何电线或电缆;

C. 接地电缆字母N应用作电线识别码的,以识别完成接地网络电路的任何电线或电缆;

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44b9-e3ad-c0b8-ef8d402da900.html
点击查看答案
1025. If the shear pin breaks, do an inspection of the towbar

A. 如果剪切销断裂,检查拖把。

B. 如果销钉断裂,检查拖把。

C. 如果剪切销断裂,给拖把做测试。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d1-7847-c0b8-ef8d402da900.html
点击查看答案
2131. 本部分测试的目的足为工作提供指导。

A. The purpose of this portion of the test is to give direction to the job.

B. The job of test is to give direction the portion of purpose.

C. The purpose this part of the test is provide guidance for the work.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bb-6f23-c0b8-ef8d402da900.html
点击查看答案
2972. Do not tighten the bolts with too much force

A. 不要给螺栓施加过大力矩。

B. 安装螺栓时不要用太大的力。

C. 不要用太大的力来拧紧螺栓。

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d4-a514-c0b8-ef8d402da900.html
点击查看答案
443. The dust cap on the air charging valve is removed, the external air source is connected to the valve stem and the swivel nut turned to open the air charging valve

A. 在充气活门上的防尘螺帽被拆下来了,这样新鲜的空气源才能被连接到气门杆和螺套上,以打开充气阀门。

B. 在充气阀门上的可调节螺帽被拆除了,这样新鲜的空气源才能被连接到气门杆和螺套上,以打开充气阀门。

C. 充气阀门上的防尘帽被拆除,外接气源连接到阀门杆,旋转螺母被旋开以打开充气阀门。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf8-d7ff-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载