A、 技术和程序是复制性能所需的,并应包括性能项目,其在达到预期飞机性能时需要特殊动作序列
B、 复制性能所需的技术和程序应包括那些达到预期飞机性能需要特殊动作序列的性能项目。
C、 对于那些达到飞机预期性能需要特殊动作顺序的性能项目,应包括复制所述性能所需的技术或程序
答案:C
A、 技术和程序是复制性能所需的,并应包括性能项目,其在达到预期飞机性能时需要特殊动作序列
B、 复制性能所需的技术和程序应包括那些达到预期飞机性能需要特殊动作序列的性能项目。
C、 对于那些达到飞机预期性能需要特殊动作顺序的性能项目,应包括复制所述性能所需的技术或程序
答案:C
A. 还包括发动机整流罩的组成部分或安装在整流罩上的部件。
B. 还包括发动机整流罩及安装在整流罩上的部件。
C. 还包括发动机整流罩的组成部分及安装在整流罩上的部件。
A. Mixed category consists of many parts and components, five kinds of these parts have been selected.
B. Miscellaneous category consists of many parts and components, five kinds of these parts have been selected.
C. Complicated category consists of many part sand components, five kinds of these parts have been selected.
A. If pump makes noise, shut it down and check the pump filter.
B. If pump operation is noisy, check pump filter for metal particles.
C. If there is noise when the pump operates, examine the filter for metal particles.
A. Centrifugal force tries to move a body to the center of its rotation.
B. Centripetal force tries to move a body away from the center of its rotation.
C. The centrifugal force is opposed by the centripetal force.
A. Internal arrangement of wires exist between the engine sump and gearboxes.
B. There are also internal connections between the engine sumps and gearboxes.
C. The engine sump and gearboxes are connected internally.
A. The specification state that the FAA should be contacted on any alterations you wil make on airplane to insure that airworthiness of the airplane
B. The specification state that the FAA should be inform about any alterations on airplane to insure that airworthiness of the airplane is not violated
C. The specification set forth that the FAA should be contacted before any alterations on airplane to make sure that the airplane is airworthiness continuously
A. Also includes components that are an integral part of, or fitted to the power plant cowling.
B. Includes components that are an integral part of, or fitted to the power plant cowling.
C. Components that are an integral part of, or fitted to the power plant cowling are also includes.
A. 上述所需材料应按照顺序来提供。
B. 上述所需材料应按如下方式提供。
C. 上述要求的物质应如下所示。
A. The component was damaged badly the repairing cost is over 60% of the total price. The workshop suggests reporting as an unserviceable part.
B. The component was damaged heavily, the repairing cost is over 60% of the total price. The workshop suggests scrapping.
C. The component was destroyed heavily, the repairing cost is 60% of the total price. The workshop suggests segregation.
A. 检查机翼油箱内部
B. 间歇地检查机翼油箱。
C. 给油箱做深入式测试。