A、 Attach the aft cargo compartment forward bulkhead central panel.
B、 Mount the front cargo compartment backward bulkhead center panel.
C、 Fix the aft bulkhead forward panel to the forward cargo component.
D、
E、
F、
G、
H、
I、
J、
答案:C
解析:A. 绑定后货舱前舱壁中央面板(Attach the aft cargo compartment forward bulkhead central panel):这个选项描述的是将后货舱的前舱壁中央面板安装到相反的位置,与题干提到的安装过程不符,因此不是正确答案。
B. 安装前货舱向后舱壁靠的中央面板(Mount the front cargo compartment backward bulkhead center panel):这个选项描述的是将前货舱的向后的舱壁中央面板安装到相反的位置,与题干提到的安装过程也不符,因此不是正确答案。
C. 将后舱壁前面板固定到前货舱(Fix the aft bulkhead forward panel to the forward cargo component):这个选项正确地描述了安装过程,即将后舱壁的前面板固定到前货舱的组件上。
因此,可以得出正确答案为选项C:将后舱壁前面板固定到前货舱。
综上所述,正确答案为选项C:Fix the aft bulkhead forward panel to the forward cargo component.
A、 Attach the aft cargo compartment forward bulkhead central panel.
B、 Mount the front cargo compartment backward bulkhead center panel.
C、 Fix the aft bulkhead forward panel to the forward cargo component.
D、
E、
F、
G、
H、
I、
J、
答案:C
解析:A. 绑定后货舱前舱壁中央面板(Attach the aft cargo compartment forward bulkhead central panel):这个选项描述的是将后货舱的前舱壁中央面板安装到相反的位置,与题干提到的安装过程不符,因此不是正确答案。
B. 安装前货舱向后舱壁靠的中央面板(Mount the front cargo compartment backward bulkhead center panel):这个选项描述的是将前货舱的向后的舱壁中央面板安装到相反的位置,与题干提到的安装过程也不符,因此不是正确答案。
C. 将后舱壁前面板固定到前货舱(Fix the aft bulkhead forward panel to the forward cargo component):这个选项正确地描述了安装过程,即将后舱壁的前面板固定到前货舱的组件上。
因此,可以得出正确答案为选项C:将后舱壁前面板固定到前货舱。
综上所述,正确答案为选项C:Fix the aft bulkhead forward panel to the forward cargo component.
A. 做腐蚀检查。
B. 做损害检查。
C. 检查由腐蚀造成的损伤。
A. Despite the pressure decreases, the switch must stay closed.
B. Although the pressure decreases, the valve must stay closed
C. In spite of the decrease of the pressure, the door must stay closed.
A. 在词典中给出的形容词都是原形,如果有比较级和最高级,以括号标示出。
B. 词典中每个被认可的形容词都列入基本表格,如适用,将其比较和最高级形式放在一起。
C. 词典中每个被认可的形容词都以原形给出,如适用,将加入比较级和最高级表格。
A. If the parking apron is not level, make sure the wheel chocks set correctly
B. When the aircraft parked on a slope, must set parking brake
C. If the aircraft is parked on a slope, set the chocks on main wheel immediately
A. Loosen the cotter nuts [10] on reducer [2] and bypass valve [8] on each end of air pressure filter assembly [4].
B. Loosen the swivel nuts [10] on reducer [2] and bypass valve [8] on each end of air pressure filter assembly [4].
C. Loosen the cross nuts [10] or reducer [2] and standby valve [8] on each end of air pressure filter assembly [4].
A. The description could be pronounced in the active voice
B. Descriptive content can be written in active voice
C. You should read it in voice as you write the descriptive text
A. The number of shims should be counted and recorded.
B. It is necessary to calibrate the shims and record their numbers.
C. Do an assessment of the number of shims needed.
A. 修理/改装位于维修程序部分的下方,从左到右延伸。提出修理或改装说明,并可能引用另一份文档中的标准修理或在其他地方定义的特殊修理或改装,例如服务清单,服务通告等。
B. 修理/改装位于检查程序部分的下方,从左到右延伸。提出修理或改装说明,并可能引用另一份文档中的标准修理或在其他地方定义的特殊修理或改装,例如服务清单,服务通告等。
C. 修理/改装位于检查程序部分的下方,从左到右延伸。提出修理或改装说明,并可能引用另一份文档中的标准改装或在其他地方定义的特殊修理或改装,例如适航指令,服务通告等。
A. defects
B. Leakage
C. abrasive
A. As a rule, the engines are attached under the wings, however, as for modern aircraft, the two side engines are mounted on struts outboard of the fuselage.
B. As a rule, the engines are attached under the wings, except for the modern aircraft, the two side engines are mounted on struts outboard of the fuselage.
C. As a rule, the engines are attached under the wings, but, besides the modern aircraft, the two side engines are mounted on struts outboard of the fuselage.