A、 Put the lever in intermediate position;
B、 Put the lever in intermittent position;
C、 Put the lever in interfered position;
答案:A
A、 Put the lever in intermediate position;
B、 Put the lever in intermittent position;
C、 Put the lever in interfered position;
答案:A
A. 防火墙和密封件安装在动力组件周围,用于隔离易燃区域。
B. 为了隔离易燃区域,安装防火隔板和密封件在动力组件上或动力组件周围。
C. 安装在动力组件上或动力组件周围的防火隔板和密封件,用于隔离易燃区域。
A. all approval must be approved by the Design Authority.
B. get approval for all modifications from the design authority.
C. get approval for all modifications from the production authority.
A. 如果不同时这样做,则会卡住定位销。
B. 如果不同时这样做,则会导致定位销磨损。
C. 如果不同时这样做,则会导致定位销脱落。
A. 附件的信息可能会通过定期培训要求传达给所有员工。
B. 额外的信息可以通过定期培训要求传达给所有员工。
C. 增加的信息可以通过复训要求传达给现有员工。
A. 驾驶舱是指地板上方、前方乘客隔板和前方压力舱顶之间的舱室
B. 驾驶舱是指地板上方、前方乘客隔板之间以及前部压力舱顶上方的舱室
C. 驾驶舱是指地板前部、前方机组隔板和前方压力舱顶之间的舱室
A. 接通断路器。
B. 打开电路接头。
C. 拔出跳开关。
A. The inspection procedure is just below the section on Significant Inspection Condition,extending from left to right. State the inspection procedure to be used, e.g., magnetic particle, visual inspection, etc., and refer to the actual procedure in other documents, e.g.,NDT manual
B. The inspection procedures are Significant Inspection Conditions,and they can be found directly below the manual part, in left-to-right order. It lists the inspection procedures to be adopted such as magnetic particle, visual inspection, etc., and refers to the working procedures of other documents, such as the NDT manual.
C. The inspection procedure is extended from left to right just below the section entitled "Significant Inspection Conditions". It lists the testing procedures to be used, such as eddy current, visual inspection, etc., and includes working procedures such as nondestructive testing manual.
A. 这些词汇对于该领域外的人很难理解。
B. 这些词汇对于该专业领域外的人很难理解。
C. 这些词汇难于理解,尤其对于该领域外的人。
A. Don’t let the stresses inside the material exceed the elastic limit but permanent deformation will result.
B. Don’t let the stresses inside the material exceed the elastic limit otherwise permanent deformation will result.
C. Don’t let the stresses inside the material exceeding the elastic limit or else permanent deformation will result.
A. System test contain part of the adjustment specifications and tolerances.
B. System test is required to maintain a unit performance at its lowest design specifications.
C. System test may cover other tests, such as operational test.