APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
1670. THIS STEP MAKES SURE THAT THE FUEL PUMP ( ) CORRECTLY

A、 WORKS

B、 OPERATES

C、 MAKES

答案:B

设备系统操作理论翻译
1126. Loosen the elbow fitting(18) at the filler adaptor(17)
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d2-c4d5-c0b8-ef8d402da900.html
点击查看题目
224. For airplanes having an arry of sophisticated or comlex system, the full system/chapter method of indexing is recommended
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-f58e-c0b8-ef8d402da900.html
点击查看题目
1777. Make sure that the painted surface is smooth
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-25bd-c0b8-ef8d402da900.html
点击查看题目
1210. Plastic covers are fitted into the seat tracks to cover the exposed track sections
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-2ddf-c0b8-ef8d402da900.html
点击查看题目
2611. 若为活页,则每一页应注明修订日期和生效日期,或以其他方式标识修订状态
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69cf-a5ba-c0b8-ef8d402da900.html
点击查看题目
1563. Use the specified tool to seal the opening
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-6dd1-c0b8-ef8d402da900.html
点击查看题目
3195. 支撑发动机并将其连接发动机吊舱或吊架的组合结构或锻件的框架。包括发动机支架,减震器,支撑连杆,安装螺栓等。
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-4835-c0b8-ef8d402da900.html
点击查看题目
3153. 当安装弹簧夹,确保听到一个咔哒声。
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-c54b-c0b8-ef8d402da900.html
点击查看题目
2960. Basically, it is a guide to industry standardization of proven concepts to be presented in a form most useful to pilots
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d4-7b75-c0b8-ef8d402da900.html
点击查看题目
604. The first step should always be Job Set-up and last should be Close-Up or Clear-Up
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3f-4364-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

1670. THIS STEP MAKES SURE THAT THE FUEL PUMP ( ) CORRECTLY

A、 WORKS

B、 OPERATES

C、 MAKES

答案:B

设备系统操作理论翻译
相关题目
1126. Loosen the elbow fitting(18) at the filler adaptor(17)

A. 拧紧加油转接头(17)上的弯管接头(18)。

B. 松开弯管接头(18)上的加油转接头(17)。

C. 松开加油转接头(17)上的弯管接头(18)。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d2-c4d5-c0b8-ef8d402da900.html
点击查看答案
224. For airplanes having an arry of sophisticated or comlex system, the full system/chapter method of indexing is recommended

A. The aircraft which have number of complicated or complx system are suggested to use the full system/chapter index method.

B. For aircraft with a range of sophistic or complex system, a system-wide indexing approach is recommended.

C. Ror aircraft including an article of exquisite or complex system , a whole system indexing way is intended.

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-f58e-c0b8-ef8d402da900.html
点击查看答案
1777. Make sure that the painted surface is smooth

A. 确保喷漆光滑

B. 确保油漆表面光滑。

C. 确保油漆表面光亮。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67f-25bd-c0b8-ef8d402da900.html
点击查看答案
1210. Plastic covers are fitted into the seat tracks to cover the exposed track sections

A. 塑料罩被安装在座椅导轨上,以覆盖经过处理的导轨部分。

B. 塑料罩被安装在座椅导轨上,以覆盖暴露的导轨部分。

C. 座椅小桌板上覆盖了一层塑料,以盖住经过处理的小桌板部分。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-2ddf-c0b8-ef8d402da900.html
点击查看答案
2611. 若为活页,则每一页应注明修订日期和生效日期,或以其他方式标识修订状态

A. If the manual is loose-leaf, each page should contain the date and effective revision date when revised, or otherwise be identified as to revision status.

B. If the manual is loose-leaf, each page should contain the date and effective revision reason when revised, or otherwise be identified as to revision status.

C. If the manual is loose-leaf, each page should contain the reason and effective revision date when revised, or otherwise be identified as to revision status.

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69cf-a5ba-c0b8-ef8d402da900.html
点击查看答案
1563. Use the specified tool to seal the opening

A. 使用通用工具密封端口

B. 使用指定的工具封严开口

C. 端口可以使用特殊的工具封严

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67c-6dd1-c0b8-ef8d402da900.html
点击查看答案
3195. 支撑发动机并将其连接发动机吊舱或吊架的组合结构或锻件的框架。包括发动机支架,减震器,支撑连杆,安装螺栓等。

A. The framework builds-up construction and forgings which support the engine and attach it to the nacelle or pylon. Includes items such as engine mounts, vibration dampeners, support links, mounting bolts, etc.

B. The framework, either of build-up construction or forgings which support the engine and attach it to the nacelle or pylon. Includes items such as engine mounts, vibration dampeners, support links, mounting bolts, etc.

C. The engine mounts, vibration dampeners, support links, mounting bolts and framework support the engine and attach it to the nacelle or pylon. Includes items such as, etc.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e36-4835-c0b8-ef8d402da900.html
点击查看答案
3153. 当安装弹簧夹,确保听到一个咔哒声。

A. When you attach the spring clip, make sure that you hear a clamp.

B. When you attach the spring coil, make sure that you hear a click.

C. When you attach the spring clip, make sure that you hear a click.

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-c54b-c0b8-ef8d402da900.html
点击查看答案
2960. Basically, it is a guide to industry standardization of proven concepts to be presented in a form most useful to pilots

A. 基本上,它是以对飞行员最有用的形式来呈现已被证明的概念的行业标准化指南。

B. 基本上,它是一个指导行业标准化的证明概念,以一种最有用的形式提供给飞行员。

C. 基本上,它是一个证明行业标准化概念的指南,并提供一种对飞行员最有利的形式。

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d4-7b75-c0b8-ef8d402da900.html
点击查看答案
604. The first step should always be Job Set-up and last should be Close-Up or Clear-Up

A. 第一个步骤有时是工作准备,收尾或收工是接下来的步骤。

B. 工作准备总是第一个步骤,收尾或收工总是接下来的步骤。

C. 工作准备总是第一个步骤,收尾或收工总是最后一个步骤。

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b3f-4364-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载