1698. Individual electrical symbols are provided in this specification as a suggestion for those who do not have an established code

A、 In this specification, for those who do not have an established code, individual electrical symbols are given as a suggestion.

B、 As a suggestion for those who do not have an established code, individual electrical symbols are gained in this specification.

C、 As a suggestion for those who do not have an established code, individual electrical symbols are required in this specification.

答案:A

设备系统操作理论翻译
789. 将油门快速移动到慢车位置
https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b41-9146-c0b8-ef8d402da900.html
点击查看题目
2760. The revision numbers and the date can be removed
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-a951-c0b8-ef8d402da900.html
点击查看题目
80. This manual provides the basic control and operation information describing how the airplane components are controlled and how they operate, including any special procedures, and limitations that apply
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-2f64-c0b8-ef8d402da900.html
点击查看题目
2419. Sometimes you must break long sentences into shorter ones, delete information which is not necessary, or ask an engineer for further explanation
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-37e5-c0b8-ef8d402da900.html
点击查看题目
3022. The unit pressurizes and filters the oil
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-2615-c0b8-ef8d402da900.html
点击查看题目
42. The airborne power plants generate and supply a single type or combination of auxiliary electric, hydraulic, pneumatic or other power
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf3-b399-c0b8-ef8d402da900.html
点击查看题目
1173. 根据ATA32-05-10将螺帽磅到55到75磅寸之间。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d3-b5cd-c0b8-ef8d402da900.html
点击查看题目
1164. The metering plug decreases the fuel flow
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d3-97eb-c0b8-ef8d402da900.html
点击查看题目
2709. Use a torque wrench to tighten the bolt progressively
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-0795-c0b8-ef8d402da900.html
点击查看题目
1981. This letter also provides procedures that can be used to help mitigate moisture ingress into the connector cavity until such time that the moisture problem can be resolved and a service bulletin is available to correct the problem
https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-dfc8-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

1698. Individual electrical symbols are provided in this specification as a suggestion for those who do not have an established code

A、 In this specification, for those who do not have an established code, individual electrical symbols are given as a suggestion.

B、 As a suggestion for those who do not have an established code, individual electrical symbols are gained in this specification.

C、 As a suggestion for those who do not have an established code, individual electrical symbols are required in this specification.

答案:A

设备系统操作理论翻译
相关题目
789. 将油门快速移动到慢车位置

A. Move the throttle quickly to the idle position

B. Quickly move the throttle to the middle position

C. Push the thorttle quickly to neutral position

https://www.shititong.cn/cha-kan/shiti/0009ffa7-3b41-9146-c0b8-ef8d402da900.html
点击查看答案
2760. The revision numbers and the date can be removed

A. 版本数量和日期可以删除。

B. 版本号和日期可以删除。

C. 版本次数和日期可以删除。

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-a951-c0b8-ef8d402da900.html
点击查看答案
80. This manual provides the basic control and operation information describing how the airplane components are controlled and how they operate, including any special procedures, and limitations that apply

A. 本手册提供了基本的控制和操作信息,这些信息描述飞机部件如何被控制如何操作这些部件,以及所有特殊操作程序和操作限制。

B. 该手册提供基本控制和操作信息,描述飞机部件的生产控制工艺,包括适用的特殊生产步骤和公差值。

C. 本手册提供了基本的控制和操作信息,描述飞机部件的控制方式和工作方式,且包括所有适用的特殊程序和限制条件。

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf4-2f64-c0b8-ef8d402da900.html
点击查看答案
2419. Sometimes you must break long sentences into shorter ones, delete information which is not necessary, or ask an engineer for further explanation

A. Sometimes you have to change long sentences to shorter ones, remove unnecessary information, or ask an engineer to get further explanation.

B. Some time you have to incorporate long sentences into shorter ones, decrease unnecessary information, or require an engineer for further instruction.

C. Sometime you must illuminate long sentences into shorter ones, ignore information which is not necessary, or order an engineer for further definition.

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-37e5-c0b8-ef8d402da900.html
点击查看答案
3022. The unit pressurizes and filters the oil

A. 该组件分配和过滤油液。

B. 该组件增压和过滤油液。

C. 该组件增压和旁通油液。

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e34-2615-c0b8-ef8d402da900.html
点击查看答案
42. The airborne power plants generate and supply a single type or combination of auxiliary electric, hydraulic, pneumatic or other power

A. The airborne power plants generate and supply a or some power of auxiliary electric, hydraulic, pneumatic or other power.

B. The airborne power plants supply and distrubt a single type or combination of auxiliary electric, hydraulic, pneumatic or other power.

C. the auxiliary electric, hydraulic, pneumatic or other power is generated and supplid by a or several APU

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf3-b399-c0b8-ef8d402da900.html
点击查看答案
1173. 根据ATA32-05-10将螺帽磅到55到75磅寸之间。

A. Tighten the nuts between 55 to 75 pound-inches due to ATA32-05-10.

B. Tighten the nuts between 55 to 75 pound-inches according to ATA32-05-1.

C. Tighten the nuts above 55 or 75 pound-inches according to ATA32-05-10.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d3-b5cd-c0b8-ef8d402da900.html
点击查看答案
1164. The metering plug decreases the fuel flow

A. 计量塞增加燃油量

B. 计量塞改变滑油流量

C. 计量塞减少燃油流量

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d3-97eb-c0b8-ef8d402da900.html
点击查看答案
2709. Use a torque wrench to tighten the bolt progressively

A. 使用力矩扳手间隔地拧紧螺栓

B. 使用扭矩扳手顺序地拧紧螺栓

C. 使用扭矩扳手逐步地拧紧螺栓

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d1-0795-c0b8-ef8d402da900.html
点击查看答案
1981. This letter also provides procedures that can be used to help mitigate moisture ingress into the connector cavity until such time that the moisture problem can be resolved and a service bulletin is available to correct the problem

A. If there is a available service bulletin to correct the problem of moisture ingress into the connector cavity, the letter then will be useless.

B. Refer to this letter to help mitigate moisture ingress into the connector cavity even if there is a available service bulletin to correct the problem.

C. If there is a available service bulletin to correct the problem that moisture ingress into the connector cavity, the letter then will provide procedures.

https://www.shititong.cn/cha-kan/shiti/0009ffad-f681-dfc8-c0b8-ef8d402da900.html