APP下载
首页
>
职业技能
>
设备系统操作理论翻译
搜索
设备系统操作理论翻译
题目内容
(
单选题
)
1859. Measure the bend radius of the hose from the point where the bend starts

A、 从软管开始弯曲的地方测量软管的弯曲半径。

B、 在软管弯曲的地方开始测量软管的内径。

C、 从软管弯曲的内侧开始测量软管弯曲的角度。

答案:A

设备系统操作理论翻译
3137. 确保近地警告系统是可以操作的
https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-91ab-c0b8-ef8d402da900.html
点击查看题目
1273. 安装封严到滑油滤中时,不要过度拉伸封严。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-f77b-c0b8-ef8d402da900.html
点击查看题目
2475. The Listing of CAP Inspections contains all Continuing Airworthiness Program Inspections in the CAP, in numerical order by CAP inspection number, with full title, date, effectivity and inspection compliance
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-e7b0-c0b8-ef8d402da900.html
点击查看题目
1356. 在高压电环境下工作时,请遵守安全注意事项。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-fb9c-c0b8-ef8d402da900.html
点击查看题目
2183. The static discharger is electrically bonded to the frame
https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-1d2f-c0b8-ef8d402da900.html
点击查看题目
1630. When the relief valve opens, the pressure decreases
https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-4a66-c0b8-ef8d402da900.html
点击查看题目
2650. 清洗系统
https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-48f4-c0b8-ef8d402da900.html
点击查看题目
1262. Describing the steps is a job that may leave much to be desired
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-d528-c0b8-ef8d402da900.html
点击查看题目
1217. 若意外地移动了手柄,重新设置系统到中立位。
https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-43f3-c0b8-ef8d402da900.html
点击查看题目
198. A written sign that identifies a quantity, operation, item, or condition
https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-a115-c0b8-ef8d402da900.html
点击查看题目
首页
>
职业技能
>
设备系统操作理论翻译
题目内容
(
单选题
)
手机预览
设备系统操作理论翻译

1859. Measure the bend radius of the hose from the point where the bend starts

A、 从软管开始弯曲的地方测量软管的弯曲半径。

B、 在软管弯曲的地方开始测量软管的内径。

C、 从软管弯曲的内侧开始测量软管弯曲的角度。

答案:A

设备系统操作理论翻译
相关题目
3137. 确保近地警告系统是可以操作的

A. Make sure the ground proximity warning system is can operate

B. Make sure the ground approaching alerting system is can operate

C. Make sure the ground proximately warning system is can operate

https://www.shititong.cn/cha-kan/shiti/0009ffba-8e35-91ab-c0b8-ef8d402da900.html
点击查看答案
1273. 安装封严到滑油滤中时,不要过度拉伸封严。

A. Do not stretch the seals when you install them in oil filter.

B. Do not scratch the sealants when you install them in oil filter.

C. Do not squeeze the sealants when you install them in oil filter.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-f77b-c0b8-ef8d402da900.html
点击查看答案
2475. The Listing of CAP Inspections contains all Continuing Airworthiness Program Inspections in the CAP, in numerical order by CAP inspection number, with full title, date, effectivity and inspection compliance

A. In the Listing of CAP Inspections, apart from full title, date, effectivity and inspection compliance, all Continuing Airworthiness Program Inspections in the CAP are exclude in numerical order on the basis of CAP inspection number.

B. Along with full title, date, effectivity and inspection compliance, all Continuing Airworthiness Program Inspections in the CAP are exclude in numerical order in the light of CAP inspection number, in the Listing of CAP Inspections.

C. All Continuing Airworthiness Program Inspections in the CAP are covered, in numerical order, in the Listing of CAP Inspections along with full title, date, effectivity and inspection compliance

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bf-e7b0-c0b8-ef8d402da900.html
点击查看答案
1356. 在高压电环境下工作时,请遵守安全注意事项。

A. Obey the safety precautions when you do work with high voltages.

B. Obey the safety warnings when you do work with high impedance.

C. Obey the safety cautions when you do work with high capacitance.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d5-fb9c-c0b8-ef8d402da900.html
点击查看答案
2183. The static discharger is electrically bonded to the frame

A. 静电放电装置被安装在隔框上。

B. 搭铁线装置被焊接在隔框上。

C. 静电放电装置被焊接在隔框上。

https://www.shititong.cn/cha-kan/shiti/0009ffb1-44bc-1d2f-c0b8-ef8d402da900.html
点击查看答案
1630. When the relief valve opens, the pressure decreases

A. 当单向活门打开时,压力降低。

B. 当释压活门打开时,压力增加。

C. 当释压活门打开时,压力降低。

https://www.shititong.cn/cha-kan/shiti/0009ffad-f67d-4a66-c0b8-ef8d402da900.html
点击查看答案
2650. 清洗系统

A. wash system

B. water system

C. cleaning system

https://www.shititong.cn/cha-kan/shiti/0009ffb5-69d0-48f4-c0b8-ef8d402da900.html
点击查看答案
1262. Describing the steps is a job that may leave much to be desired

A. 描述步骤是一项可能会值得做的工作。

B. 一项工作的步骤描述可能存在不足之处。

C. 描述步骤对于一项工作,可能存在很多不足之处。

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-d528-c0b8-ef8d402da900.html
点击查看答案
1217. 若意外地移动了手柄,重新设置系统到中立位。

A. If you absolutely move the lever, set the system to the neutral position again.

B. If you accidentally move the lever, set the system to the neutral position again.

C. If you accurately move the lever, set the system to the neutral position again.

https://www.shititong.cn/cha-kan/shiti/0009ffaa-70d4-43f3-c0b8-ef8d402da900.html
点击查看答案
198. A written sign that identifies a quantity, operation, item, or condition

A. symbol

B. label

C. mark

https://www.shititong.cn/cha-kan/shiti/0009ffa1-9bf5-a115-c0b8-ef8d402da900.html
点击查看答案
试题通小程序
试题通app下载