A、 you need to remove cooling shroud halves and the ignition lead prior to removing an igniter.
B、 To remove an igniter, you must disconnect the cooling shroud halves,the ignition lead and igniter adapter.
C、 you need to remove an igniter prior to removing cooling shroud halves and the ignition lead.
答案:A
A、 you need to remove cooling shroud halves and the ignition lead prior to removing an igniter.
B、 To remove an igniter, you must disconnect the cooling shroud halves,the ignition lead and igniter adapter.
C、 you need to remove an igniter prior to removing cooling shroud halves and the ignition lead.
答案:A
A. If the part is broken, replace it.
B. If the part is unserviceable, replace it.
C. If the part condition is poor replace the.
A. If you perform the ground test unit, ensure that pressure regulator is turned to Zero.
B. Before you do the ground test, make sure that you have set the pressure regulator to Zero.
C. Before you operate the ground test unit, make sure that the pressure regulator is set to zero.
A. Those units and components which furnish a means of pressurizing, heating, cooling, moisture controlling, strainer and treating the air used to ventilate the areas of the fuselage within the pressure seals, as applicable.
B. Those units and components which furnish meaning pressurizing, heating, cooling, moisture control, filter and treating the air used to ventilate the areas of the fuselage within the pressure seals, as applicable.
C. Those units and components which furnish a means of pressurizing, heating, cooling, moisture controlling, filtering and treating the air used to ventilate the areas of the fuselage within the pressure seals, as applicable.
A. 若燃油样品未被污染,则继续该程序。
B. 若燃油样品未被污染,则无需继续该程序。
C. 若燃油样品污染不严重,则无需继续该程序。
A. This section tells how to identify a fault by checking flight instruments.
B. This section tells parameters on flight instruments.
C. This section tells how to find a failure of flight instruments.
A. Install the correct dump valve and the correct gasket
B. Install the dump valve and the appropriate gasket
C. Install the dump valve and the correct gasket
A. Scientific verbs must disobey the same rules as other approved verbs in STE.
B. Technical verbs must obey the same rules as other approved verbs in STE.
C. Mechanical verbs must violate the same rules as other approved verbs in STE.
A. The primary function of the power unit is to supply electrical power.
B. The main purpose of the power plant is to provide electricity.
C. To serve for electrical supply is the only function of the power unit.
A. The base of the triangle is 5 cm;
B. The base of the rectangle is 5 cm;
C. The height of the triangle is 5 cm;
A. 用保险丝连接卡筵与控制杆拨叉确保安全
B. 用保险丝穿过控制杆拨叉将夹块固定
C. 用保险丝将夹块和控制杆固定在—起